• Title/Summary/Keyword: CTPA

Search Result 4, Processing Time 0.016 seconds

Establishment of Injection Protocol of Contrast Material in Pulmonary Angiography using Test Bolus Method and 16-Detector-Row Computed Tomography in Normal Beagle Dogs

  • Choi, Sooyoung;Kwon, Younghang;Park, Hyunyoung;Kwon, Kyunghun;Lee, Kija;Park, Inchul;Choi, Hojung;Lee, Youngwon
    • Journal of Veterinary Clinics
    • /
    • v.34 no.5
    • /
    • pp.330-334
    • /
    • 2017
  • The aim of this study was to establish an injection protocol of a test bolus and a main bolus of contrast material for computed tomographic pulmonary angiography (CTPA) for visualizing optimal pulmonary arteries in normal beagle dogs. CTPA using a test bolus method from either protocol A or B were performed in each of four normal beagle dogs. In protocol A, CTPA was conducted with a scan duration for around 8 s, setting the contrast enhancement peak of the pulmonary trunk in the middle of the scan duration. The arrival time to the contrast enhancement peak was predicted from a previous dynamic scan using a test bolus (150 mg iodine/kg) injected with the same injection duration using for a main bolus (450 mg iodine/kg). In protocol B, CTPA was started at the predicted appearance time of contrast material in the pulmonary trunk based on a previous dynamic scan using a test bolus injected with the same injection rate as a main bolus. CTPA using protocol A showed the optimal opacification of the pulmonary artery with pulmonary venous contamination. Proper CTPA images in the absence of venous contamination were obtained in protocol B. CTPA with a scan duration for 8 s should be started at the appearance time of contrast enhancement in the pulmonary trunk, which can be identified exactly when a test bolus is injected at the same injection rate used for the main bolus.

CT characteristics of normal canine pulmonary arteries and evaluation of optimal contrast delivery methods in CT pulmonary angiography

  • Jung, Joohyun;Chang, Jinhwa;Yoon, Junghee;Choi, Mincheol
    • Korean Journal of Veterinary Research
    • /
    • v.47 no.2
    • /
    • pp.247-254
    • /
    • 2007
  • This study was performed to identify the normal anatomic orientation of pulmonary arteries and to obtain the normal baseline parameters and the optimal contrast material delivery methods of computed tomographic pulmonary angiography (CTPA) on normal beagle dogs. Based on the contrast injection flow rate, the contrast volume, and the administration methods, the experimental groups were divided into 4 groups such as group 1 : 2 ml/s, 3 ml/kg, and monophasic administration; group 2 : 5 ml/s, 3 ml/kg, and monophasic administration; group 3 : 5 ml/s, 4 ml/kg, and monophasic administration; group 4 : 5 ml/s and 2 ml/kg in first phase, 0.3 ml/s and 2 ml/kg in second phase, as biphasic administration. Normal anatomic orientation of pulmonary arteries in CTPA was evaluated through reformatted and 3D images after retro-reconstruction. Normal parameters for great arteries and peripheral pulmonary arteries were obtained on the factor of basement hounsfield unit (HU) values, contrast enhanced HU values, delay time, and peak time. And the optimal contrast delivery methods were evaluated on the factor of contrast enhanced HU values, image quality, and artifact. The monophasic administration with 5 ml/s contrast injection flow rate and 3 ml/kg contrast volume was optimal in canine CTPA.

Improvement of Safety Management and Plan by Comparison Analysis of Construction Technology Promotion Act(CTPA) and Occupational Safety and Health Act(OSHA) in Construction Field (건설기술진흥법과 산업안전보건법 비교분석을 통한 건설업 안전관리 및 계획의 개선방안)

  • Kim, Si Ouk;Yoon, Young Geun;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.4
    • /
    • pp.37-46
    • /
    • 2021
  • According to the Korean Statistical Information Service, the number of fatal occupational accidents per 100,000 workers is the highest in Korea, among all the OECD countries. The safety of construction workers is managed by the construction technology promotion act (CTPA) and the occupational safety and health act (OHSA). A review of the current safety management laws is required to improve them for the construction industry, where the numbers of accidents and deaths are constantly increasing. Accordingly, the aim of this study was to identify the problems in unclear business areas through comparison and analysis of the CTPA and OHSA guidelines and establish effective site-dependent construction safety management plans. The overlapping safety and health management terms and tasks of organizations were derived along with identifying the overlapping items of the safety management and hazard and risk prevention plans. Based on these results, several improvements for the design stage, safety cost, and safety education have been suggested in this paper. In addition, an improved model based on the integration and an optimized compromise between these two laws for safety management in areas where many accidents have occurred in recent years has been reported here.

Safety Management Cost Accounting for Underground Electric Power Transmission Facility Construction (전력구 설치 공사의 안전관리비 계상 기준에 관한 연구 )

  • Min Ho, Kim;Sung Woo, Shin
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.50-59
    • /
    • 2022
  • In the Construction Technology Promotion Act (CTPA) of the Republic of Korea, safety management cost is enforced as a statutory cost that must be included in the budget of construction projects. However, the construction of underground electric power transmission facilities (UEPTFs) is not included in the category of construction works defined in the CTPA. Consequently, the statutory safety management cost does not apply to the construction of UEPTFs. To overcome this limitation, the clients of UEPTF construction projects generally provide internal guidelines enabling the addition of the safety management cost in the project budget. Nevertheless, even after the execution of the internal guidelines, some important cost items are omitted from the budget owing to the incompleteness of the guidelines. In this context, this paper proposes a complete set of accounting items and their calculation methods for appropriate budgeting of the safety management cost of UEPTF construction projects. To this end, the current budgeting method of the safety management cost of UEPTF construction projects is analyzed, and a questionnaire study is performed to confirm the necessary cost items and their appropriate calculation methods. Based on the results of the questionnaire study, a set of accounting items and their calculation criteria for the budgeting of the safety management cost of UEPTF construction projects are proposed.