A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • 제71권2호
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

혼합정수 프로그래밍 기법을 이용한 진보된 Time-Cost Trade-Off Model (Advanced Time-Cost Trade-Off Model using Mixed Integer Programming)

  • 권오빈;이승현;손재호
    • 한국건설관리학회논문집
    • /
    • 제16권6호
    • /
    • pp.53-62
    • /
    • 2015
  • 공기비용 트레이드오프 모델은 건설프로젝트의 계획 및 관리에 있어 매우 중요하다. TCTO 모델은 연속모델과 분절모델 두 가지 모델이 개발되어왔다. 그러나 한 종류의 모델만을 사용하여 현실적인 공기단축 시나리오를 적용하기에는 한계가 있다. 이에 TCTO 의 연속적인 모델과, 분절모델을 결합하여 진보된 모델을 제시하였으며 또한, 비선형 관계, 인센티브 및 지체보상금 고려가 가능하도록 TCTO모델에 포함되어 있다. 이런 특성들은 건설프로젝트에 적용가능하다. 6개의 activities로 구성된 CPM 네트워크는 연구에서 제안된 모델을 설명하기 위해 사용되었다. 제시한 모델은 모든 제약 조건을 만족시키는 최적 스케쥴 계산이 가능하다. 결과적으로 본 연구에서 제시한 진보된 TCTO모델은 기존의 모델보다 최적화된 공기단축이 가능하다.

웹을 기반으로 한 실내건축공사의 원가관리 시스템 개발에 관한 연구 (A study on the development of a web-based cost management system of building interior projects)

  • 송영규
    • 한국실내디자인학회논문집
    • /
    • 제13권3호
    • /
    • pp.197-204
    • /
    • 2004
  • This study aims at the development of a cost management system in building interior projects. Renovation and remodeling is activated and expanded much more being compared with new building construction at present. After Interior project proceeding must get out of simple estimate and assumption, then its be needed a formal work process and computerized cost management. Proceeding a building interior project management was proceed in the office and the field. Cost break down, especially, depend on the field manger and used fiend managing money because its not checked by cost manager in office manger. For this study, cost factors are defined in terms of cost break-down interior works which consist of materials and labors. A data model for cost factors was developed, and a relational database is used to realize cost data management based upon this data model. Data input and output are achieved by internet from both of wired PC and mobile phone. This system can timely display a number of needed reports for cost management that identifies cash flow and predicts budget for cost break-down works in interior projects.

공간단위 공사비 산정방법에 관한 연구 - 공종별 공사비의 공간정보 부재로 인한 한계점 개선을 중심으로 - (A Study on the Cost Estimating Method based on Spatial Unit Focused on Improving Limitation Caused by Lack of Spatial Information of the Cost Based on Work Type)

  • 이기상
    • 한국건설관리학회논문집
    • /
    • 제12권3호
    • /
    • pp.131-139
    • /
    • 2011
  • 본 연구는 공공시설공사에서 VE의 코스트모델과 공사현장의 진도관리, 그리고 공사비 분쟁에서 공간정보의 부재로 인한 공종별 공사비 내역 정보의 한계를 인식하고, 이를 극복하기 위하여 공사비의 인식체계를 공간단위로 전환하는 개선 방안의 하나로 제안하는 건축물 세부공간단위의 공사비 원가계산방법에 관한 것이다. 본 연구를 통해 제시한 공간단위의 공사원가 산정 시스템은 공사비를 구성하는 모든 공간 단위에서, 모든 공종, 공종을 구성하는 모든 자재, 노무 및 모든 비용 항목에 대한 정밀하고도 다차원적인 파악이 가능하게 하는 것이다.

과설계가 타이탄 로켓엔진의 신뢰도 및 개발비용에 미치는 영향 (The Effect of Overdesign on Titan Rocket Engine Reliability and Development Cost)

  • 김경미;황준우
    • 한국항공우주학회지
    • /
    • 제43권4호
    • /
    • pp.334-340
    • /
    • 2015
  • 로켓 엔진을 설계추력보다 낮은 추력으로 운용하면 신뢰도가 증가하는 것으로 알려져 있다. 따라서 엔진을 디레이팅하여 증가하는 신뢰도가 엔진을 과설계하기 위해 증가된 개발비를 상쇄할 수 있다면 개발비를 최소화하기 위해 엔진의 과설계를 고려할 수 있다. 본 연구의 목적은 엔진 과설계와 디레이팅이 신뢰도 및 비용에 미치는 영향을 설명하는 모형을 개발하고자 하는 것이다. 타이탄 로켓 엔진의 운용추력수준 및 연소시험횟수에 따른 신뢰도 자료에 로지스틱 회귀모형을 적합하여 신뢰도 성장을 모형화하고 Transcost 비용모형을 이용하여 엔진을 10% 과설계 하면 신뢰도 요구값에 따라 엔진 개발비를 9%에서 23% 감소시킬 수 있음을 보였다. 또한 이러한 엔진 개발비의 감소는 엔진이 사용하는 연료에 따라 달라짐을 지적하였다.

공종별 수선비용 추계모델을 활용한 공동주택 장기수선충당금 적립금액 산정 (Repair Accumulation Cost for the Long-Term Repair Plan in Multifamily Housing Using the Forecasting Model of the Repair Cost)

  • 이강희;채창우
    • KIEAE Journal
    • /
    • 제16권3호
    • /
    • pp.137-143
    • /
    • 2016
  • Purpose: Apartment housing should conduct a cyclic repair to keep and maintain the building performance since they are constructed. Therefore, the repair plan would be provided for long term period which explains the repair time, items and repair cost. Residents of apartment housing are responsible to pay for the repair activities. For repair cost, residents would reserve the money for repair little by little continuously until the required repair time because the repair cost takes a big burden for residents and lots of money a time. But, there is no systematic approach to provide the long term repair cost because it is no proper forecast of the repair cost to the upcoming repair time. In this study, it aimed at providing the monthly accumulation of the long term repair cost with the survey data in Seoul. Method: For these, the surveyed data are classified into 6 categories and number of data are 1,918. In addition, it developed the repair cost model for the 24 repair works and the cumulation function which is reflected with the each cost model. Result: This study are shown as follows : First, among the various estimation for the repair cost, the power function has a goodness of fit in statistics. Second, the monthly accumulation would be 12,840 won/household in size of $100,000m^2$ management area and $81.7won/m^2$ in size of the 1,000 household number during 40 years.

PRICE S 모델을 이용한 무기체계 내장형 소프트웨어 비용 추정 기법 (A Cost Estimation Technique using the PRICE S Model for Embedded Software in Weapon Systems)

  • 신언희;강성진
    • 정보처리학회논문지D
    • /
    • 제13D권5호
    • /
    • pp.717-724
    • /
    • 2006
  • 무기체계 획득 사업에 있어서 소프트웨어의 비중이 높아감에 따라 비용추정의 중요성이 증대되고 있으나, 무기체계 내장형 소프트웨어의 비용에 대한 추정은 일반 소프트웨어 비용 추정 방법을 따르며 주로 PRICE S 모델을 도구로 사용하고 있다. 그렇지만, PRICE S 모델에서 내장형 소프트웨어에 대한 개발규모 산정에 따른 추정 비용의 타당성에 대한 검증 결과는 알려져 있지 않다. 따라서 본 연구에서는 PRICE S 모델을 이용하여 무기체계 내장형 소프트웨어의 산정 규모를 통한 비용 추정 기법을 제안한다. 이를 위하여 PRICE S 모델의 규모 산정 도구를 이용하여 코드라인과 기능점수 방식으로 소프트웨어의 규모를 추정한다. 최종적으로는 제작사에서 제공하는 실제 비용 자료와 비교한다. 결과적으로 객관적으로 추정이 어려웠던 무기체계 내장형 소프트웨어의 규모 및 비용을 추정하는 방안을 제시함으로써, 앞으로 무기체계 획득 사업에서 소프트웨어의 비용 검증 및 협상에 활용할 수 있을 것이다.

다기준 의사결정 모형을 이용한 전력수급계획 모형에 관한 연구 (A study on the power expansion planning model using multi-criteria decision making rule)

  • 한석만;강동주;김광모;홍희정;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.77-79
    • /
    • 2008
  • The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning not used cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning model using multi-criteria decision rule. This model used multi objective function considering not only cost minimizing but also GENCO's intension. This paper compared proposed model with WASP model in order to verify the result of proposed model.

  • PDF

다기준 의사결정 모형을 이용한 전력수급계획 모형에 관한 연구 (A Study on the Power Expansion Planning Model using Multi-criteria Decision Making Rule)

  • 한석만;김발호
    • 전기학회논문지
    • /
    • 제58권3호
    • /
    • pp.462-466
    • /
    • 2009
  • The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning can't use cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning model using multi-criteria decision rule. This model used multi objective function considering not only cost minimizing but also GENCO's intension. This paper compared proposed model with WASP model in order to verify the result of proposed model.

농업용 저수지 설계를 위한 저수량 최적화 모형의 개발 (Development of the Optimal Reservoir Storage Determination Model for Supplying Rural Water)

  • 정하우;박태선;최진용
    • 한국농공학회지
    • /
    • 제40권2호
    • /
    • pp.69-80
    • /
    • 1998
  • The optimal reservoir storage capacity is needed to be determined at the stage of reservoir planning. The reservoir storage capacity should be based on water balance between demand and supply, and meet the water deficity during the growing season. However, the optimal reservoir storage capacity should be determined considering benefit-cost analysis for the project. In this study, Two models are developed. The one is the RSOM(Reservoir Storage Optimization Model), that is consisted by three submodels, MROPER (Modified Reservoir OPERation model), RESICO(REservoir SIze and the construction COst computation) model. And the other is the BECA(BEnefit-Cost Anaysis) model. For model application, three districts, Chungha, Ipsil and Edong were selected. The relative difference of B/C ratio between project planning data and estimation by RSOM is 17.9, 15.0 and 7.3% respectively, which may be applicable for water resources development feasibility planning.