• Title/Summary/Keyword: CNC T-BAR System

Search Result 2, Processing Time 0.019 seconds

Review of Freeform Buildings using CNC T-BAR System (CNC T-BAR 형상제어 시스템을 활용한 비정형 건축물의 곡면 파사드의 시공사례 검토)

  • Kim, SungJin;Park, YoungMi;Park, JungJoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.58-59
    • /
    • 2017
  • Through the case study, we surveyed the performance of a CNC-T BAR system on irregular-shaped building construction project. By CNC T-BAR system, we mean a surface curvature control system has been used in aircraft and ship manufacturing by controlling entire surface points on shape. For the past 10 year, the number of irregularly-shaped building design and construction project has been increased, and also the studies on irregular-shaped construction methods have been conducted. However, the previous studies did not review on the performance of the CNC T-BAR system. We collected construction-completed cases in Korea, which applied the CNC T-BAR system, and we studied its performance by comparing with a segment system in terms of construction duration and its quality. The result shows that the CNC T-BAR system can shorten the construction duration comparing with segment-assembly system while maintaining high quality. The CNC T-BAR system is expected to apply on the more number of irregularly-shape building construction project.

  • PDF

Study of Freeform Buildings using the Digital Fabrication (비정형 건축물 구현을 위한 Digital Fabrication의 활용방법 연구 -롯데월드타워 3D 포디움 시공사례-)

  • Kim, Sung-Jin;Park, Young-Mi;Park, Jung-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.52-53
    • /
    • 2017
  • Through the case study, we surveyed an applicability of digital fabrication in irregular-shaped building construction project. By digital fabrication, we mean is a precision manufacturing method has been used in aircraft, ship and car manufacturing industry. We collected construction-completed "LotteWorld Tower Podium" project data and analyzed its process in terms of construction quality andduration. The result shows that digital fabrication is considered a competitive technology that enabled to complete the project in seven months within 3mm surface curvature threshold. The digitalfabrication is expected to apply on a number of irregular-shaped building construction project.

  • PDF