Problem of Guarantee System against Defect by Change Starting point of Defects Liability on the Management of Apartment Houses and Improvement (공동주택 하자담보책임 기산일 변화에 따른 하자보증제도의 문제점 및 개선방안)

  • Jeong, Yong-Ki;Lee, Tae-Hyeong;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.278-279
    • /
    • 2017
  • Result from Amendment of Apartment Houses Decree Customer Service, Recently, the starting point of Defects Liability changed "Criteria of Completion date" to "Delivery date to Divided property". Through the Law amended, There are some inconsistency between "Claim for repairing defects" and "Period of security deposit for repairing defects claim". If someone bought a house after Completion date, Purchasing period of "Claim to security deposit for repairing defects" lapsed without renewal. This research is to identify problems and solutions for improving the system.

  • PDF

Development of Natural Hazard Risk Map using Insured Claim Payouts and Its Application (보험 손실액을 활용한 자연재해 위험 지도 개발 및 적용방안 연구)

  • Kim, Ji-Myong;Park, Young Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.257-258
    • /
    • 2015
  • The amount of damages caused by natural hazards is consistently growing due to the unusual weather and extreme events. At the same time, property damage by natural hazards is rapidly increasing as well. Hence, we need systematic anti-disaster activities and consulting that can react to such a situation. To address these needs, we investigated and analyzed insured claim payouts from natural hazards by administrative area, and calculate the risk index utilizing GIS. According to the index, this map is identifying the areas of greatest natural hazard risk. The ranking of natural disaster vulnerability based on the risk index, and risk grades were divided into five based on the ranking. This map integrates the natural hazard losses to assist in comprehensive and effective loss prevention activities using analysis of regional loss claims from natural hazards. Moreover, this map can be as utilized as loss mitigation and prevention activities to verify the distribution of exposure and hazards.

  • PDF

Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

Estimation of Product Claim Rate with Consumer's Inspection Error (소비자(消費者) 검사오류(檢査誤謬)를 고려한 제품(製品)의 반환율(返還率) 추정(推定)에 관한 연구(硏究))

  • Kim, Je-Sung;Lee, Chang-Hun
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.1
    • /
    • pp.22-34
    • /
    • 1993
  • In claiming for the purchased products, two types of errors can occur from the consumer's point of view. One is to accept defective products and the other one is to reject good products. Due to such errors, Claim rate for the products is expected to be different from that the producer has originally anticipated. In this paper, the probability distribution of the number of claimed products when such consumer's inspection errors are involved is derived. Then, a simple model is provided to estimate the claim rate when such errors are present.

  • PDF

So-called Cleft Constructions in Korean and Some Meanings of "kes" (소위 강조구문과 "것"의 의미)

  • Yeom, Jae-Il
    • Language and Information
    • /
    • v.18 no.2
    • /
    • pp.103-122
    • /
    • 2014
  • In a so-called cleft (or, pseudocleft), the kes-phrase seems to refer to a person, even though kes is generally incompatible with human beings. In this paper, I claim that in a cleft, the kes-phrase can refer to a concept, and that a concept of human beings is not a person. I give some pieces of evidence for this claim. In a cleft, the kes-phrase cannot be pluralized only when it is supposed to denote a human being. Moreover, in such a case, the NP before the copula cannot be interpreted as the meaning of a predicate. Furthermore, in a cleft two kes-phrases are not conjoined with (k)wa only when they seem to denote human beings. All the observations can be explained by the claim that the kes-phrase denotes a concept in such cases. A concept cannot be used as a predicate, pluralized, or conjoined to refer to objects that are subsumed under a concept. When the kes-phrase denotes a concept, the cleft sentence is an identity statement.

  • PDF

PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF

Systematic Literature Review for the Application of Artificial Intelligence to the Management of Construction Claims and Disputes

  • Seo, Wonkyoung;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.57-66
    • /
    • 2022
  • Claims and disputes are major causes of cost and schedule overruns in the construction business. In order to manage claims and disputes effectively, it is necessary to analyze various types of contract documents punctually and accurately. Since volume of such documents is so vast, analyzing them in a timely manner is practically very challenging. Recently developed approaches such as artificial intelligence (AI), machine learning algorithms, and natural language processing (NLP) have been applied to various topics in the field of construction contract and claim management. Based on the systematic literature review, this paper analyzed the goals, methodologies, and application results of such approaches. AI methods applied to construction contract management are classified into several categories. This study identified possibilities and limitations of the application of such approaches. This study contributes to providing the directions for how such approaches should be applied to contract management for future studies, which will eventually lead to more effective management of claims and disputes.

  • PDF

Basic Research on Nuclear Power Plant Construction Claims and Dispute Management Processes Development

  • Son, HyeJin;Lee, SangHyun;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.710-711
    • /
    • 2015
  • A nuclear power plant construction is a complex form of construction which comprises various stakeholders and contractors. Therefore, contract disputes will occur due to conflicting interests of contracting parties and unpredictable factors which arise during construction work. Even if the contract is well prepared, it cannot fully prepare for future situations in actuality. Claims management is very important in carrying out construction management. This study intends to define claim, and delve into development of claims management processes from the viewpoint of owners and contractor through consideration on international contract terms on claims management and the details of the claims management of the Construction Extension to the PMBOK. In addition, it is needed to accumulate and manage data on claims that have occurred so that they can be referenced in the future. As information should be accumulated so that type classification can be carried out and that lessons can be learned on claims that have occurred in each business site, study on establishing data-based systems relating to claims processes will be needed in the future.

  • PDF

A Study on Dispute Claim to the Apartment Reconstruction Projects (공동주택 재건축 사업의 분쟁 클레임에 관한 연구)

  • Lee, Mi-Ae;Kim, Dea-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.268-273
    • /
    • 2008
  • Because a procedure is complicated and various related parties participate in the redevelopment and reconstruction project, it can be extended to diverse disputes when the relation with the related parties is smoothly adjusted. In particular, when the dispute occurs in a phase of occupancy after the complete construction, the regional residents-centric association must give up many rights of invisible parts caused by the construction company's profit maximization because they are short of professionalism about the business. Accordingly, this study is aimed at providing the construction project manager's dispute and claim process for responding to the dispute or claim reasonably and for obtaining the client's (association) rights for the reconstruction project, and at developing the checklist for obtaining the necessary documents by each phase, when the dispute or claim is made by the association against the construction company after the completion of construction. Through this study, the association can obtain the related documents in advance and can implement the reasonable response data when the dispute or claim occurs due to it. Also, it will enable the construction manager to analyze the project costs reasonably and will reduce the estimated wastes. That is, the work efficiency is expected to be improved.

  • PDF

The Development of a Web-based Decision Support System for Construction Claim Management (건설 클레임 관리를 위한 웹기반의 의사결정 지원 시스템 개발)

  • Sung, Nak Won;Kim, Young Suk;Lee, Mi Young;Lee, Jung Sun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.115-123
    • /
    • 2006
  • Recently, construction claims have been increased for protecting the rights of construction participants and effectively adjusting the changes under the contract. Thus, the importance of claim management has been emphasized in the construction industry. In domestic construction industry, some claim issues involved in construction activities are often being developed into disputes and even litigations because of the absence of methods or systems for the dispute resolution, and the lack of judicial precedents which can be provided as the references for resolving a particular dispute. In general, the judicial precedents related to the disputes and litigations occurred among construction participants would be extremely valuable in evaluating and analyzing current claims issues. However, such useful information has not been effectively accumulated and utilized in resolving the similar or sometimes identical types of disputes, thus requiring a large amount of additional costs, time and efforts. The primary objective of this study is to propose a web-based decision support system for construction claim management, which enables contractual participants to easily access and use the information of the judicial precedents related to the current construction claims. The decision support system is composed of 'prevention' and 'settlement' modules for avoiding and systematically resolving the construction claims.