• 제목/요약/키워드: CHANGE OF SUCCESSION

검색결과 183건 처리시간 0.018초

단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산 (Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve)

  • 최귀열
    • 한국농공학회지
    • /
    • 제7권1호
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

북한 테러범죄의 변화양상에 따른 대응방안 -김정일 정권 이후 고위층 권력 갈등을 중심으로 (The Changing Aspects of North Korea's Terror Crimes and Countermeasures : Focused on Power Conflict of High Ranking Officials after Kim Jong-IL Era)

  • 변찬호;김은정
    • 시큐리티연구
    • /
    • 제39호
    • /
    • pp.185-215
    • /
    • 2014
  • 한국은 지금까지 북한의 테러범죄로 인해 많은 피해를 입었다. 현재 북한정권에 의한 테러 범죄행위 발생 가능성은 그 어느 때보다 높은 시점이고, 김일성 정권의 북한 테러범죄 행위는 통치자금 확보라는 목적 하에 독재로 자행되어 왔다. 이후 김정일 김정은 정권 동안 테러범죄 행위를 살펴보면, 비(非)권력 집단의 목표인 권력쟁취 경제이권 확보 등을 성취하고자 하는 갈등이 원인으로 작용하여 범죄행위로 표출되고 있음이 드러난다. 본 연구는 테러 대책의 궁극적인 목적이 장차 발생할 가능성 높은 위협에 대하여 사전예측 대비해야 한다는 측면에 초점을 맞추었으며, 이를 위해 집단 간 권력 갈등이 범죄의 한 요인이 된다고 설명하는 George B. Vold(1958)의 이론을 적용했다. 이에 다양한 북한 테러범죄 원인 중 각 시대별 고위층 권력 갈등으로 인한 테러범죄 행위를 분석하고, 이러한 시대적 흐름에 맞는 향후 대응방안을 제시하였다. 북한의 테러범죄 행위는 김정일 정권 이후, 고위층 간 권력 판도가 시대별로 급격히 변화하면서 세력 쟁취와 이권 강탈을 위한 권력 갈등으로 인해 더욱 심화되었다. 북한 고위층의 권력 갈등이 북한 테러범죄에 많은 영향을 미치고 있음에도 불구하고, 이에 관련된 정보 첩보 수집이 단편적인데다가 미국에 의존하는 등 실제적인 대응이 미약한 실정이다. 게다가 북한 테러범죄에 대한 심각성 및 시급함의 공감도 역시 높지 않아서 체계적인 국제공조가 이루어지지 않고 있으며, 공조 방안에 대한 논의조차 원활하게 진행되지 않고 있다. 더욱이 최근 DDoS공격 청와대 홈페이지 변조 GPS 교란전파 발사 무인정찰기 침투 등 수 많은 테러범죄 행위가 있었음에도 불구하고, 한국은 이 같은 비(非)대칭 테러범죄 행위가 미칠 파문에 비해 그 심각성을 깊이 인식하지 못하고 있다. 이제 북한 테러범죄의 원인을 밝히고 대응하기 위해 휴민트(HUMINT) 테킨트(TECHINT) 등을 통한 고위층 정보 수집을 확대하고, 이를 종합 분석하는 전담부서를 설치하는 한편, 탈북자 등 정보원의 보호 및 감독을 통한 포괄적인 수집체제를 확립해야 한다. 그리고 북한 테러와 관련된 국제협력에 적극 동참하여, 국제협약을 이끌어낼 수 있도록 국제적인 공조를 구축해야 한다. 또한 핵 미사일 테러와 함께 한층 정교해지고 첨단화 되어가는 사이버 전자 테러 전문기술에 대비하기 위해 법령 제 개정 및 관련 기구 예산 등 제도적 정비와 기술을 보완할 수 있는 전문 인력 양성 및 기술개발 등 실질적인 대응방안을 마련해야 할 것이다.

  • PDF

천연기념물 제374호 제주 평대리 비자나무 숲의 보존·관리방향 설정을 위한 기초연구 (A Basic Study on the Establishment of Preservation and Management for Natural Monument(No.374) Pyeongdae-ri Torreya nucifera forest of Jeju)

  • 이원호;김동현;김재웅;오해성;최병기;이종성
    • 한국전통조경학회지
    • /
    • 제32권1호
    • /
    • pp.93-106
    • /
    • 2014
  • 본 연구는 천연기념물 제374호 제주 평대리 비자나무 숲의 입지환경, 식생자원과 이용 및 관리현황을 조사하고, 현재 적용되는 관리구역에 대한 등급을 설정한 것으로써 다음과 같은 결과를 도출하였다. 첫째, 제주 평대리 비자나무 숲은 토지이용형태가 농업지역으로 변화하면서 대상지 주변지역으로의 개발압력에 의한 영향이 우려되며, 비자나무 숲 내 곶자왈지대는 종 다양성을 확보할 수 있는 기반요소로 원형보존의 관리계획 설정 및 지형의 변화를 야기하는 개발행위는 배제되어야 한다. 둘째, 제주 평대리 비자나무 숲의 소산식물상은 총 91과 263속 353종 41변종 8품종의 402분류군이 조사되었다. 이 중 환경부 지정 법정 멸종위기식물종 중 멸종위기식물 I II급에 해당하는 식물의 분포가 확인되었으나 현재의 서식처 변화 및 종의 병해, 불법 남획 등에 따른 개체 소실에 의해 비자나무 숲 내 종의 절멸 위험도 존재하므로 제주 평대리 비자나무 숲의 관리방안 설정 시 우선적으로 보호되어야 할 대상으로 고려되어야 한다. 셋째, 비자나무가 상관을 대표하는 식생구조를 나타내고 있으나, 노거수 위주의 영속적 관리와 보존전략은 빈약한 연령구조를 야기하였으며, 일부 구역의 인위적 관리에 의한 숲의 건조화, 자연적 천이에 의한 비자나무의 입지 감소 등의 문제점이 발생하는 바, 수목밀도의 조절 및 후계목 증식 등 제주 평대리 비자나무 숲의 특성을 유지할 수 있는 방안의 마련이 필요하다. 넷째, 이용에 따른 탐방로의 훼손이 발견되었으며, 특히 화산송이길의 훼손 및 분담율이 높게 나타났다. 따라서 화산송이의 단순한 보충보다는 현행 탐방로 외에 추가적인 관광루트 개발을 통한 분담율 완화 방안이 고려되어야 한다. 섯째, 제주 평대리 비자나무 숲의 관광요소 중 높은 선호도를 나타내는 식물적 요소는 이용에 관한 압력이 민감하게 작용하고, 비영속적인 특성상 지속적 모니터링이 필요하며, 추가적 관광요소 개발과 동시에 현재 높은 선호도를 나타내는 요소를 적극 활용하는 등의 방안이 마련되어야 한다. 여섯째, 보호강도별 중요도에 따라 I등급 지역은 존속개체군의 유지와 서식처의 훼손을 방지하고, II등급 지역은 연차별 숲의 재생을 위주로 관리방향을 설정하며, III등급 지역은 비자나무 시범림이나 후계목 증식을 위한 지역으로 설정되어야 한다. IV등급 지역은 고유 식생의 교란이 많이 발생하는 곳으로 부분별 휴식년제의 도입이 필요하다. V등급 지역은 비자나무 숲의 관광활용을 위한 서비스 공간 적지에 속한다. 상이한 등급의 지역 인접에 따른 가장자리효과에 대한 방안으로는 상대적으로 등급이 낮은 곳에 환경간섭을 피하기 위한 버퍼존의 설치와 주기적 모니터링이 요구된다.