CBP market which is the first stage of competitive electricity market has been operated and the KPX has been established since April, 2001 by restructuring plan for electricity industry. Baseload unit are settled with baseload CP and BLMP in CBP market. The other unit are settled with peakload CP and SMP. The difference of settlement between two groups occurs the profit changes of the unit. This paper analyzes the profit by units under settlement rule in CBP market. It analyzes the difference between market clearing price and variable costs, and fixed cost recovery through CP income. Finally, this paper suggests the plan how market was affected by the difference of fixed cost recovery by generators and how to improve Intermediate and peak load unit's profit.
The electric power industries in Korea are launched into deregulation by introducing the CBP(Cost Based Pool), where generation sector of KEPCO was divided into six generation companies and the other sectors of KEPCO remains vertically integrated system. In deregulated market, participants are concerned with maximization of their profit rather than minimization of system-wide costs. Consequently, there are difficulties in applying the cost minimization for the scheduling of generation resources to CBP, because of the operation of pumped-storage hydroplants. This paper presents an operation method of pumped storage hydroplants which is helpful for the economic operation of power system considering the market in the CBP.
Since FERC order 755 was published, each frequency regulation market rules of the North American ISO/RTO have been revised in many parts. In 2016, the domestic CBP market has also changed its market rules to allow ESS to participate in the frequency regulation reserve services(Governor Free and Automatic Generation Control). This paper compares and analyzes the changed North American ISP/RTO market and domestic CBP market rules. In particular, we compare PJM and CAISO frequency regulation market pricing mechanism and settlement rules with the settlement rules of the domestic CBP market and compare the factors of each market used to compensate the participating resources in terms of resource dependency and accuracy.
At present, the Korean electricity industry is undergoing restructuring and the Cost Based-generation Pool(CBP) market is being operated preparing for Two Way Bidding Pool(TWBP) market open. As the circumstance of the traditional system is changed according to power system deregulation, the simulation tool which should reflect market code providing market operating mechanism is needed to analyze an electricity market. This paper presents the development of an unique market simulator, Market Modeling and Price Simulator(MMPS) that is designed to imitate the Korean electricity market considering uniform price. The MMPS is developed in VB.NET and is composed of two modules that consist of market modeling and price simulation interfacing access database program. To evidence the features and the performance of MMPS, a small two way bidding market with 12-bus system and one way bidding market for generator competition will be presented for the electricity market simulations using MMPS.
전력거래소에서 전력계통 및 전력시장 운영을 위해 도입한 핵심시스템은 EMS, MOS, CBP 이다. 이 세개 시스템은 각각 고유의 기능을 가진 별도의 시스템으로 구축되었다. 우리나라의 전력시장이 발전경쟁단계에 머무르면서 당초 양방향전력시장용으로 도입된 MOS시스템이 활용되지 못함에 따라 MOS시스템의 실시간 급전기능을 활용해 전력계통 운영의 안정성 및 경제성 향상을 꾀하고자 이 세 개의 시스템을 2006년 10월부터 연계 운영하고 있다. 이를 위해 CBP입찰값을 MOS의 입찰형식으로 변환하기위한 CBP-MOS 입찰변환시스템, 실시간 수요예측을 위한 수요예측 프로그램, MOS와 EMS를 일괄적으로 연계하기 위한 연계Mode, 각 발전기 운전원들에게 발전기의 급전계획값 및 실시간 운전현황을 전송하기 위한 급전지시시스템(MX) 및 전반적인 시스템 연계운영을 종합적으로 감시하기 위한 종합감시시스템 등을 개발하여 운영하고 있다.
This paper presents a method for improvement of capacity payment in CBP(cost based pool) market. Capacity payments have been used as common mechanisms in various pools for compensating generators recognized to serve a for reliability purpose. Ideal pricing for capacity reserves by definition achieves a balance between economic efficiency and investment incentives. That is, prices must be kept close to costs, but not so low as to discourage investment. However, the price set is not easy. This paper concludes with market design recommendations that apply fuzzy theory for improvement of capacity payment. Following this model, market participants decided on their own based on their forecast to the market demand and the payment for it.
2001년에 개설된 우리나라 전력도매시장은 변동비 반영(CBP) 시장으로 발전기들의 비용절감 유인을 통해 전력생산 비용 최소화를 추구하고 있다. 국내 발전사들은 발전비용 절감을 위한 다양한 노력을 기울여 왔고, 발전연료 구매비용의 인하, 고효율 발전기 도입, 수요지에 인접한 발전소 건설 등이 그 결과로 나타나고 있다. 최근 전력시장 제도개선의 일환으로 계통한계가격(SMP)에서 무부하비용 등을 제외하는 방식에 대한 논의가 제기되고 있다. 본 연구에서는 SMP에서 무부하비용 등을 제외한 후 손실발전기를 별도로 보상하는 방안이 발전사의 비용절감 유인에 미치는 영향을 분석하였다. 그 결과 가격결정 구간에 위치한 LNG복합 발전기들의 비용절감 유인이 위축될 가능성이 높은 것으로 나타났다.
전력거래 계량시스템은 회원사의 계량기가 생성한 계량데이터로부터 계량값을 산출하고 각 계량기의 특성을 관리하며, 정산금 지급을 위한 시간대별 계량값을 정산시스템에 전송하는 기능을 수행한다. 또한 정보공개 시스템과 연계하여 회원사 계량값을 공개하는 전력거래 핵심 시스템이다. 현재 계량데이터 취득 방식은 전용선 및 공중선에 기반한 유선방식 위주이며, 향후 CDMA 통신망을 활용한 계량시스템을 구축하여 IT 무선기술을 계량체계에 도입할 예정이다.
The bearer of the power sector's ETS compliance cost is power consumer for the following reasons. Firstly, power companies are constrained in establishing appropriate strategies to comply with ETS regulations due to the structural differences between the domestic power market and emission trading system. In other words, because power companies do not have a right to determine price and production of electricity, they have to compete with other companies under disadvantaged conditions in the emission trading market. Secondly, because ETS compliance cost is part of power production costs as it is also clearly written in the national greenhouse gas reduction road-map and the second energy supply plan, the cost should be included in power price following the power market operation rule. Thirdly, the most effective method to reduce carbon emissions in power sector is to reduce power demand, which is efficiently achieved through raising power price to a realistic level. Low power price in Korea is the major cause of rising power demand which is also the major cause of rising GHG emission. Therefore, power sector's ETS compliance cost should be included in power price to encourage power consumers' actions on reducing power consumption. Fourthly, when externality cost occurs in the process of delivering public services, usually beneficiary pay principle is applied to identify the cost bearer. Since electricity is one representative public good, the bearer of power sector's ETS compliance cost is power consumer.
우리나라는 정부의 전력산업 구조 개편 계획에 따라 2001년부터 전력거래시장을 도입하였고 초기 단계 전력거래시장을 운영하기 위한 "발전경쟁(CBP : Cost Based Pool)시스템"을 국내기술로 개발하였다. 전력산업 구조 개편 잠정중단으로 발전경쟁시장이 장기화되어, 99년도 개발당시 초기단계(2$\sim$3년간)에만 사용할 예정이었던 CBP 시스템이 지속적으로 운영 되어왔다. 발전경쟁시장이 장기화됨에 따라 회원사의 수가 시장 초기 10개사에서 2008년 8월 기준 226개사로 증가하였고, 전력거래량 규모도 13조원에서 21조원으로 확대되었다. 시장의 변화에 파라 전력시장의 운영규칙 또한 여러 차례 개선되었다. IT기술도 급격히 발달하여 이에 따라 CBP 시스템도 변화하여 왔다 본 논문에서는 발전경쟁시장에서 정산시스템의 현재 역할과 기능 및 요구사항을 살펴보기로 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.