• Title/Summary/Keyword: CAIDI

Search Result 4, Processing Time 0.017 seconds

Optimal Routing of Distribution Network Considering Reliability Indices (신뢰도 지수를 고려한 배전계통의 최적 전력전송경로 결정)

  • 신동환;노병권;김진오
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.9
    • /
    • pp.1073-1080
    • /
    • 1999
  • Optimal routing of distribution networks can be attained by keeping the line power capacity limit to handle load requirements, acceptable voltage at customer loads, and the reliability indices such as SAIFI, SAIDI, CAIDI, and ASAI limits. This method is composed of optimal loss reduction and optimal reliability cost reduction. The former is solved relating to the conductor resistance of all alternative routes, and the latter is solved relating to the failure rate and duration of each alternative route. The routing considering optimal loss only and both optimal loss and optimal reliability cost are compared in this paper. The case studies with 10 and 24 bus distribution networks showed that reliability cost should be considered as well as loss reduction to achieve the optimal routing in the distribution networks.

  • PDF

A Study on the Improved Efficiency of Distribution Network Reliability Using DAS (배전자동화시스템의 도입이 배전계통신뢰도 향상에 기여한 사례 연구)

  • Hwang, Woo-Hyun;Bae, Sung-Hwan;Kim, Ja-Hee;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.12
    • /
    • pp.2059-2064
    • /
    • 2007
  • This paper analyzed distribution network reliability related with the increment of outages and duration time according to distribution facilities increasing. KEPCO introduced distribution automation system in 1998 which could recognize outage section by remotely monitoring the fault current and reduce the blackout area by remotely controlling distribution switches. As the result of this outage time reduction using distribution automation system, the minimum distribution automation rate was fined out in this paper on the base of analyzing diverse data and how many switches were used in distribution system to improve distribution network reliability at the situation of distribution facilities increasing. This result can be used as the model that an overseas utility company applies distribution automation system in the future.

Optimal Routing of Distribution Networks Considering Reliability Indices (신뢰도지수를 고려한 배전계통시스템의 최적전력전송경로 결정)

  • Roh, P.K.;Kim, J.O.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.915-917
    • /
    • 1998
  • Optimal routing of distribution networks can be attained by keeping the line power capacity limit to handle load requirements, acceptable voltage at customer loads, and the reliability indices such as SAIFI, SAIDI, CAIDI, and ASAI limits. This method is composed of optimal loss reduction and optimal reliability cost reduction. The former is solved relating to the conductor resistance of all alternative routes, and the latter is solved relating to the failure rate and duration of each alternative route. The routing considering optimal loss only and both optimal loss and optimal reliability cost are compared in this paper. The results showed that reliability cost should be considered as well as loss reduction to achieve the optimal routing in the distribution networks.

  • PDF

Extraction of Time-varying Failure Rate for Power Distribution System Equipment (배전계통 설비의 시변 고장률 추출)

  • Moon, Jong-Fil;Lee, Hee-Tae;Kim, Jae-Chul;Park, Chang-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.11
    • /
    • pp.548-556
    • /
    • 2005
  • Reliability evaluation of power distribution system is very important to both power utilities and customers. It present the probabilistic number and duration of interruption such as failure rate, SATDI, SAIFI, and CAIDI. However, it has a fatal weakness at reliability index because of accuracy of failure rate. In this paper, the Time-varying Failure Rate(TFR) of power distribution system equipment is extracted from the recorded failure data of KEPCO(Korea Electric Power Corporation) in Korea. For TFR extraction, it is used that the fault data accumulated by KEPCO during 10 years. The TFR is approximated to bathtub curve using the exponential(random failure) and Weibull(aging failure) distribution function. In addition, Kaplan-Meier estimation is applied to TFR extraction because of incomplete failure data of KEPCO. Finally, Probability plot and regression analysis is applied. It is presented that the extracted TFR is more effective and useful than Mean Failure Rate(MfR) through the comparison between TFR and MFR