• 제목/요약/키워드: CAES(Compressed Air Energy Saving)

검색결과 3건 처리시간 0.018초

전력생산을 위한 암반내 압축공기저장공동의 안정성분석 (Stability Analysis of Compressed Air Storage Caverns in Rockmass)

  • 신희순;신중호;최성웅;한일영;김정엽
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.287-294
    • /
    • 2002
  • CAES which is called as a compressed air energy storage was firstly developed at Huntorf, German in 1978. The capacity of that system was 290MW, and it can be treated as a first commercial power plant. CAES has a lot of merits, such as saving the unit price of power generation, averaging the peak demand, improvement of maintenance, enlarging the benefit of dynamic use. According to the literature survey, the unlined rock cavern should be proposed to be a reasonable storing style as a method of compressed air storage in Korea. We decided the hill of the Korea Institute of Geoscience and Mineral Resources as CAES site. If we construct the underground spaces in this site, the demand for electricity nearby Taejon should be considered. So we could determine the capacity of the power plant as a 350MW, This capacity needs a underground space of 200,000㎥, and we can conclude 4 parallel tunnels 550m deep from the surface through the numerical studies, Design parameters were achieved from 300m depth boring job and image processing job.

  • PDF

1MWh급 레독스흐름전지의 부하이전용 최적운전에 따른 전기요금 절감효과 분석 (Analysis of Electricity Cost Saving Effect by the Optimal load shifting Operation with 1MWh Redox Flow Battery)

  • 백자현;고은영;강태혁;이한상;조수환
    • 전기학회논문지
    • /
    • 제65권7호
    • /
    • pp.1151-1160
    • /
    • 2016
  • In recent years, the energy storage systems such as LiB, NaS, RFB(Redox-Flow Battery), Super- capacitor, pumped hydro storage, flywheel, CAES(Compressed Air Energy Storage) and so on have received great attention as practical solutions for the power supply problems. They can be used for various purpose of peak shaving, load leveling and frequency regulation, according to the characteristics of each ESS(energy storage system). This paper will focus at 1 MWh RFB system, which is being developed through the original technology project of energy material. The output of ESS is mainly characterized by C-rate, which means that the total rated capacity of battery will be delivered in 1 hour. And it is a very important factor in the ESS operation scheduling. There can be several options according to the operation intervals 15, 30 and 60minutes. The operation scheduling is based on the optimization to minimize the daily electricity cost. This paper analyzes the cost-saving effects by the each operating time-interval in case that the RFB ESS is optimally scheduled for peak shaving and load leveling.