• Title/Summary/Keyword: Business Process Scheduling

Search Result 70, Processing Time 0.022 seconds

Study on Dispatching with Quality Assurance (품질을 고려한 작업투입에 관한 연구)

  • Ko, Hyo-Heon;Kim, Jihyun;Baek, Jun-Geol;Kim, Sung-Shick
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.34 no.1
    • /
    • pp.108-121
    • /
    • 2008
  • Dispatching rule for parallel machines with multi product is proposed in this paper, In current market,customer's request for higher quality is increasing, In accordance with such demand, manufacturers are focusingon improving the quality of the products. Such shift in production objective is risky. The possibility ofneglecting another important factor in customer satisfaction increases, namely due dates. From the aspect ofimproving quality, frequency of product assignment to limited number of high performance machines willincrease. This will lead to increased waiting time which can incur delays, In the case of due date orientedproduct dispatch, Products are assigned to machines without consideration for quality. Overall deterioration ofproduct quality is inevitable, In addition, Poor products will undergo rework process which can increase delays.The objective of this research is dispatching products to minimize due date delays while improving overallquality. Quality index is introduced to provide means of standardizing product quality. The index is used toassure predetermined quality level while minimizing product delays when dispatching products. Qualitystandardization method and dispatching algorithm is presented. And performance evaluation is performed withcomparison to various dispatching methods.

iSSD-Based Collaborative Processing for Big Data Mining (효율적인 빅 데이터 마이닝을 위한 iSSD 기반 협업 처리 방안)

  • Jo, Yong-Yoen;Kim, Sang-Wook;Bae, Duck-Ho
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.42 no.2
    • /
    • pp.460-470
    • /
    • 2017
  • We address how to handle big data mining effectively using the intelligent SSD (iSSD). ISSD is a storage device equipped with computing power inside SSD for reducing the transferring cost and for processing data nearby SSD where the data is stored. We first introduce the structural characteristics of iSSD for efficient data processing. Then, we present how to process data mining algorithms by using iSSD. Finally, we discuss how to improve the performance of data mining algorithms significantly by exploiting heterogeneous computing environment where host CPUs and GPU coexist for maximizing the performance.

A Virtual Manufacturing Agent for Sales Agent of Manufacturers in EC Marketplace (전자상거래 환경하에서의 제초업체 판매 에이전트를 위한 가상생산 에이전트)

  • 최형림;박병주;김현수;이창호
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.1-15
    • /
    • 2001
  • Recently, Internet based Electronic Commerce is recognized as one of the alternatives for strengthening sales power of small and medium companies. However, small and medium manufacturers can't adjust properly to the new environment because they are in short of money, personnel, and technology. To cope with this problem, this paper deals with the development of virtual manufacturing agent to support sales agent. The sales activity of most of parts manufacturing companies is based on orders of buyers. The process of promotion, receipt and selection of orders of the parts manufacturing is closely coupled with the load status of the production lines. On deciding whether to accept an order or not, as well as negotiating with buyers, sales person needs information such as load and schedule of production lines, manufacturability of the order. Therefore, the functions of virtual manufacturing agents manufacturability analysis, process planning, and scheduling are key features in developing an agent of sales activity for the parts manufacturing business. While most of research on virtual manufacturing system so far is focused on the simulation of each product, this paper deals with the development of agent assisting internet-based product sales by supporting production information promptly. The pilot system of virtual manufacturing agent is implemented using KQML-based agent template and Java-based expert system shell for a small molding company.

  • PDF

Analysis of Impact on ERP Customization Module Using CSR Data

  • Yoo, Byung-Keun;Kim, Seung-Hee
    • Journal of Information Processing Systems
    • /
    • v.17 no.3
    • /
    • pp.473-488
    • /
    • 2021
  • The enterprise resource planning (ERP) system is a standardized and advanced business process that many companies are implementing now-a-days through customization. However, it affects the efficiency of operations as these customizations are based on uniqueness. In this study, we analyzed the impact of customized modules and processing time on customer service request (CSR), by utilizing the stacked CSR data during the construction and operation of ERP, focusing on small and medium-sized enterprises (SMEs). As a result, a positive correlation was found between unit companies and the length of ERP implementation; ERP modules and the length of ERP implementation; ERP modules and unit companies; and the type of ERP implementation and ERP module. In terms of CSR, a comparison of CSR processing time of CBO (customized business object) module and STD (standard) module revealed that while the five modules did not display statistically significant differences, one module demonstrated a statistically very significant difference. In sum, the analysis indicates that the CBO-type CSR and its processing cost are higher than those of STD-type CSR. These results indicate that companies planning to implement an ERP system should consider the ERP module and their customization ratio and level. It not only gives the theoretical validity that should be considered as an indicator for decision making when ERP is constructed, but also its implications on the impact of processing time suggesting that the maintenance costs and project scheduling of ERP software must also be considered. This study is the first to present the degree of impact on the operation and maintenance of customized modules based on actual data and can provide a theoretical basis for applying SW change ratio in the cost estimation of ERP system maintenance.

Patterns and Trends in Schedule Control Practice of Korean General Contractors (건설기업 공정관리 패턴의 현황 및 변화 분석)

  • Jung, Young-Soo;Kim, Hee-A
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.88-96
    • /
    • 2011
  • Schedule control is an exceedingly fundamental and important construction business function. Even though enormous research efforts have been exerted in this area, there has been no comprehensive and quantitative study exploring detailed cost control practice of construction companies in terms of practical patterns and trends. In this context, this paper surveyed the patterns and trends of schedule control practice of Korean general contractors. Schedule control process as compared to schedule reduction is focused in this paper. The variables for practical schedule control process were identified first. A survey questionnaire was then developed and used in order to collect data from Korean general contractors. Survey results analyzing responses from 45 companies show that scheduling processes in practice have been significantly enhanced in terms of software tools, manuals, and capabilities of engineers.

Application of Genetic Algorithm for Railway Crew Rostering (철도 승무교번 배치를 위한 유전알고리즘 적용방안)

  • Park, Sang mi;Kim, Hyeon Seung;Kang, Leen Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.133-141
    • /
    • 2019
  • Crew rostering in railway operations is usually done by arranging a crew diagram in accordance with working standards every month. This study was done to identify the problems related to the creation of crew rosters in railway operations and to suggest an optimum crew rostering method that can be applied in railway operations planning. To do this, the work standards of a railway company were identified, and a genetic algorithm was used to develop an optimal roster with equal working time while considering actual working patterns. The optimization process is composed of analysis of the input data, creation of work patterns, creation of a solution, and optimization steps. To verify the method, the roster derived from the proposed process was compared with a manually created roster. The results of the study could be used to reduce the deviation of business hours when generating a roster because the standard deviation of working time is the objective function.

Using the METHONTOLOGY Approach to a Graduation Screen Ontology Development: An Experiential Investigation of the METHONTOLOGY Framework

  • Park, Jin-Soo;Sung, Ki-Moon;Moon, Se-Won
    • Asia pacific journal of information systems
    • /
    • v.20 no.2
    • /
    • pp.125-155
    • /
    • 2010
  • Ontologies have been adopted in various business and scientific communities as a key component of the Semantic Web. Despite the increasing importance of ontologies, ontology developers still perceive construction tasks as a challenge. A clearly defined and well-structured methodology can reduce the time required to develop an ontology and increase the probability of success of a project. However, no reliable knowledge-engineering methodology for ontology development currently exists; every methodology has been tailored toward the development of a particular ontology. In this study, we developed a Graduation Screen Ontology (GSO). The graduation screen domain was chosen for the several reasons. First, the graduation screen process is a complicated task requiring a complex reasoning process. Second, GSO may be reused for other universities because the graduation screen process is similar for most universities. Finally, GSO can be built within a given period because the size of the selected domain is reasonable. No standard ontology development methodology exists; thus, one of the existing ontology development methodologies had to be chosen. The most important considerations for selecting the ontology development methodology of GSO included whether it can be applied to a new domain; whether it covers a broader set of development tasks; and whether it gives sufficient explanation of each development task. We evaluated various ontology development methodologies based on the evaluation framework proposed by G$\acute{o}$mez-P$\acute{e}$rez et al. We concluded that METHONTOLOGY was the most applicable to the building of GSO for this study. METHONTOLOGY was derived from the experience of developing Chemical Ontology at the Polytechnic University of Madrid by Fern$\acute{a}$ndez-L$\acute{o}$pez et al. and is regarded as the most mature ontology development methodology. METHONTOLOGY describes a very detailed approach for building an ontology under a centralized development environment at the conceptual level. This methodology consists of three broad processes, with each process containing specific sub-processes: management (scheduling, control, and quality assurance); development (specification, conceptualization, formalization, implementation, and maintenance); and support process (knowledge acquisition, evaluation, documentation, configuration management, and integration). An ontology development language and ontology development tool for GSO construction also had to be selected. We adopted OWL-DL as the ontology development language. OWL was selected because of its computational quality of consistency in checking and classification, which is crucial in developing coherent and useful ontological models for very complex domains. In addition, Protege-OWL was chosen for an ontology development tool because it is supported by METHONTOLOGY and is widely used because of its platform-independent characteristics. Based on the GSO development experience of the researchers, some issues relating to the METHONTOLOGY, OWL-DL, and Prot$\acute{e}$g$\acute{e}$-OWL were identified. We focused on presenting drawbacks of METHONTOLOGY and discussing how each weakness could be addressed. First, METHONTOLOGY insists that domain experts who do not have ontology construction experience can easily build ontologies. However, it is still difficult for these domain experts to develop a sophisticated ontology, especially if they have insufficient background knowledge related to the ontology. Second, METHONTOLOGY does not include a development stage called the "feasibility study." This pre-development stage helps developers ensure not only that a planned ontology is necessary and sufficiently valuable to begin an ontology building project, but also to determine whether the project will be successful. Third, METHONTOLOGY excludes an explanation on the use and integration of existing ontologies. If an additional stage for considering reuse is introduced, developers might share benefits of reuse. Fourth, METHONTOLOGY fails to address the importance of collaboration. This methodology needs to explain the allocation of specific tasks to different developer groups, and how to combine these tasks once specific given jobs are completed. Fifth, METHONTOLOGY fails to suggest the methods and techniques applied in the conceptualization stage sufficiently. Introducing methods of concept extraction from multiple informal sources or methods of identifying relations may enhance the quality of ontologies. Sixth, METHONTOLOGY does not provide an evaluation process to confirm whether WebODE perfectly transforms a conceptual ontology into a formal ontology. It also does not guarantee whether the outcomes of the conceptualization stage are completely reflected in the implementation stage. Seventh, METHONTOLOGY needs to add criteria for user evaluation of the actual use of the constructed ontology under user environments. Eighth, although METHONTOLOGY allows continual knowledge acquisition while working on the ontology development process, consistent updates can be difficult for developers. Ninth, METHONTOLOGY demands that developers complete various documents during the conceptualization stage; thus, it can be considered a heavy methodology. Adopting an agile methodology will result in reinforcing active communication among developers and reducing the burden of documentation completion. Finally, this study concludes with contributions and practical implications. No previous research has addressed issues related to METHONTOLOGY from empirical experiences; this study is an initial attempt. In addition, several lessons learned from the development experience are discussed. This study also affords some insights for ontology methodology researchers who want to design a more advanced ontology development methodology.

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

A Study of Competency for R&D Engineer on Semiconductor Company (반도체 기술 R&D 연구인력의 역량연구 -H사 기업부설연구소를 중심으로)

  • Yun, Hye-Lim;Yoon, Gwan-Sik;Jeon, Hwa-Ick
    • 대한공업교육학회지
    • /
    • v.38 no.2
    • /
    • pp.267-286
    • /
    • 2013
  • Recently, the advanced company has been sparing no efforts in improving necessary core knowledge and technology to achieve outstanding work performance. In this rapidly changing knowledge-based society, the company has confronted the task of creating a high value-added knowledge. The role of R&D workforce that corresponds to the characteristic and role of knowledge worker is getting more significant. As the life cycle of technical knowledge and skill shortens, in every industry, the technical knowledge and skill have become essential elements for successful business. It is difficult to improve competitiveness of the company without enhancing the competency of individual and organization. As the competency development which is a part of human resource management in the company is being spread now, it is required to focus on the research of determining necessary competency and to analyze the competency of a core organization in the research institute. 'H' is the semiconductor manufacturing company which has a affiliated research institute with its own R&D engineers. Based on focus group interview and job analysis data, vision and necessary competency were confirmed. And to confirm whether the required competency by job is different or not, analysis was performed by dividing members into workers who are in charge of circuit design and design before process development and who are in the process actualization and process development. Also, this research included members' importance awareness of the determined competency. The interview and job analysis were integrated and analyzed after arranging by groups and contents and the analyzed results were resorted after comparative analysis with a competency dictionary of Spencer & Spencer and competency models which are developed from the advanced research. Derived main competencies are: challenge, responsibility, and prediction/responsiveness, planning a new business, achievement -oriented, training, cooperation, self-development, analytic thinking, scheduling, motivation, communication, commercialization of technology, information gathering, professionalism on the job, and professionalism outside of work. The highly required competency for both jobs was 'Professionalism'. 'Attitude', 'Performance Management', 'Teamwork' for workers in charge of circuit design and 'Challenge', 'Training', 'Professionalism on the job' and 'Communication' were recognized to be required competency for those who are in charge of process actualization and process development. With above results, this research has determined the necessary competency that the 'H' company's affiliated research institute needs and found the difference of required competency by job. Also, it has suggested more enthusiastic education methods or various kinds of education by confirming the importance awareness of competency and individual's level of awareness about the competency.

Development of Intelligent ATP System Using Genetic Algorithm (유전 알고리듬을 적용한 지능형 ATP 시스템 개발)

  • Kim, Tai-Young
    • Journal of Intelligence and Information Systems
    • /
    • v.16 no.4
    • /
    • pp.131-145
    • /
    • 2010
  • The framework for making a coordinated decision for large-scale facilities has become an important issue in supply chain(SC) management research. The competitive business environment requires companies to continuously search for the ways to achieve high efficiency and lower operational costs. In the areas of production/distribution planning, many researchers and practitioners have developedand evaluated the deterministic models to coordinate important and interrelated logistic decisions such as capacity management, inventory allocation, and vehicle routing. They initially have investigated the various process of SC separately and later become more interested in such problems encompassing the whole SC system. The accurate quotation of ATP(Available-To-Promise) plays a very important role in enhancing customer satisfaction and fill rate maximization. The complexity for intelligent manufacturing system, which includes all the linkages among procurement, production, and distribution, makes the accurate quotation of ATP be a quite difficult job. In addition to, many researchers assumed ATP model with integer time. However, in industry practices, integer times are very rare and the model developed using integer times is therefore approximating the real system. Various alternative models for an ATP system with time lags have been developed and evaluated. In most cases, these models have assumed that the time lags are integer multiples of a unit time grid. However, integer time lags are very rare in practices, and therefore models developed using integer time lags only approximate real systems. The differences occurring by this approximation frequently result in significant accuracy degradations. To introduce the ATP model with time lags, we first introduce the dynamic production function. Hackman and Leachman's dynamic production function in initiated research directly related to the topic of this paper. They propose a modeling framework for a system with non-integer time lags and show how to apply the framework to a variety of systems including continues time series, manufacturing resource planning and critical path method. Their formulation requires no additional variables or constraints and is capable of representing real world systems more accurately. Previously, to cope with non-integer time lags, they usually model a concerned system either by rounding lags to the nearest integers or by subdividing the time grid to make the lags become integer multiples of the grid. But each approach has a critical weakness: the first approach underestimates, potentially leading to infeasibilities or overestimates lead times, potentially resulting in excessive work-inprocesses. The second approach drastically inflates the problem size. We consider an optimized ATP system with non-integer time lag in supply chain management. We focus on a worldwide headquarter, distribution centers, and manufacturing facilities are globally networked. We develop a mixed integer programming(MIP) model for ATP process, which has the definition of required data flow. The illustrative ATP module shows the proposed system is largely affected inSCM. The system we are concerned is composed of a multiple production facility with multiple products, multiple distribution centers and multiple customers. For the system, we consider an ATP scheduling and capacity allocationproblem. In this study, we proposed the model for the ATP system in SCM using the dynamic production function considering the non-integer time lags. The model is developed under the framework suitable for the non-integer lags and, therefore, is more accurate than the models we usually encounter. We developed intelligent ATP System for this model using genetic algorithm. We focus on a capacitated production planning and capacity allocation problem, develop a mixed integer programming model, and propose an efficient heuristic procedure using an evolutionary system to solve it efficiently. This method makes it possible for the population to reach the approximate solution easily. Moreover, we designed and utilized a representation scheme that allows the proposed models to represent real variables. The proposed regeneration procedures, which evaluate each infeasible chromosome, makes the solutions converge to the optimum quickly.