• Title/Summary/Keyword: Business Process Scheduling

Search Result 70, Processing Time 0.031 seconds

Study on Optimal Appointment Pattern using Plastic Surgery Appointment Data (성형외과 예약 고객 데이터를 반영한 최적 예약 패턴 연구)

  • Choi, Jiyeon;Chung, Yerim
    • Korea Journal of Hospital Management
    • /
    • v.23 no.3
    • /
    • pp.87-103
    • /
    • 2018
  • Purpose: This study investigates the best appointment pattern which can enhance customer's satisfaction and hospital's efficient management reflecting plastic surgery clinic's service characteristics. Methodology: The data of this study is obtained from Plastic surgery Clinic which is located in the civic center. By collecting and analyzing the data, we build the simulation model using ARENA. Based on 5 appointment patterns that was suggested in formal appointment scheduling studies, we experiment 3 simulation models; 'Basic Appointment Pattern' that has no restriction, 'Restriction on Second Customer' that restricts the number of second customer's in each slot, 'Restriction on Process Time' that restricts the number of second customer who has long process time in each slot. We can check robustness of the appointment patterns by experimenting on off-peak day and peak day, during peak season. Findings: This study confirms that these 2 restrictions can give a better result than 'Basic Appointment Pattern' that just simply distributes customers by number. Especially, the performance of Triangle-like pattern which is the best appointment pattern in the formal study has been improved by adding restrictions. Based on 'DET', 'Restriction on Second Customer' shows a better result. Meanwhile, based on 'E(WT)', 'Restriction on Process Time' shows a better result. Overall, based on 'DET+E(WT)', 'Restriction on Second Customer' shows a better result. Practical Implications: The purpose of each hospital may alter as demand for plastic surgery grows increasingly. Thus, each hospital should be always prepared to introduce appointment pattern for changed purpose. In order to respond flexibly to these changes, it is necessary for medical personnel to improve the awareness or for hospital to create an environment by constructing appointment program so that medical personnel does not need to put more labor on work.

Simulation Modeling for Production Scheduling under Make-To-Order Production Environment : Focusing on the Flat Glass Production Environment (주문생산 방식의 생산계획 수립을 위한 시뮬레이션 모델 설계 : 판유리 제조 공정을 중심으로)

  • Choi, Yong-Hee;Hwang, Seung-June
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.1
    • /
    • pp.64-73
    • /
    • 2019
  • The manufacturing companies under Make-To-Order (MTO) production environment face highly variable requirements of the customers. It makes them difficult to establish preemptive production strategy through inventory management and demand forecasting. Therefore, the ability to establish an optimal production schedule that incorporates the various requirements of the customers is emphasized as the key success factor. In this study, we suggest a process of designing the simulation model for establishing production schedule and apply this model to the case of a flat glass processing company. The flat glass manufacturing industry is under MTO production environment. Academic research of flat glass industry is focused on minimizing the waste in the cutting process. In addition, in the practical view, the flat glass manufacturing companies tend to establish the production schedule based on the intuition of production manager and it results in failure of meeting the due date. Based on these findings, the case study aims to present the process of drawing up a production schedule through simulation modeling. The actual data of Korean flat glass processing company were used to make a monthly production schedule. To do this, five scenarios based on dispatching rules are considered and each scenario is evaluated by three key performance indicators for delivery compliance. We used B2MML (Business To Manufacturing Markup Language) schema for integrating manufacturing systems and simulations are carried out by using SIMIO simulation software. The results provide the basis for determining a suitable production schedule from the production manager's perspective.

Application of ERP and MES in Case of Automobile Manufacturing Company (자동차부품 제조업체의 ERP 및 MES의 적용에 관한 사례 연구)

  • Kim, Ki-Dong;Choi, Jang-Ho;Kim, Dae-Young
    • Journal of Industrial Technology
    • /
    • v.22 no.B
    • /
    • pp.51-60
    • /
    • 2002
  • Currently, many companies are trying to be more competitive by implementing the most appropriate software package called ERP (Enterprise Resource Planning). ERP can support the company's business process. A manufacturing execution system (MES) is an industrial software system, as well as a manufacturing management function in make-to-order and make-to-stock manufacturing environments. This paper presents an architecture of MES. This study develops MES to identify the functional requirements of loading & scheduling in the automobile industry. This study shows the effectiveness of the proposed MES, how to develop MES and interface with ERP package.

  • PDF

The Social Effects of Higher Education Policy in South Korea: The Rise of the "Pig Mum" phenomenon

  • Lee, Eugene;Calonge, David Santandreu;Hultberg, Patrik
    • Journal of Contemporary Eastern Asia
    • /
    • v.18 no.1
    • /
    • pp.70-93
    • /
    • 2019
  • The contemporary educational system in South Korea is built on high-stakes standardised tests, a manifestation of the national project of social reconstruction and reform. One recent outcome is the emergence of an unfamiliar yet ubiquitous phenomenon: the "pig mum"; a Korean parent who is fully involved in organising, scheduling and managing the educational process from primary to secondary school for a group of children in a neighbourhood. Based on a quasimixed method utilizing a survey of a group of students and parents, this pilot study explores the "pig mum" phenomenon and its linkage to education policy. The authors conclude that the current educational policy fails to achieve the ideals it professes to value. This creates deep and negative societal norms that endanger a growing generation of students by creating a parallel private education market environment where "pig mums" thrive.

'Knowing' with AI in construction - An empirical insight

  • Ramalingham, Shobha;Mossman, Alan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.686-693
    • /
    • 2022
  • Construction is a collaborative endeavor. The complexity in delivering construction projects successfully is impacted by the effective collaboration needs of a multitude of stakeholders throughout the project life-cycle. Technologies such as Building Information Modelling and relational project delivery approaches such as Alliancing and Integrated Project Delivery have developed to address this conundrum. However, with the onset of the pandemic, the digital economy has surged world-wide and advances in technology such as in the areas of machine learning (ML) and Artificial Intelligence (AI) have grown deep roots across specializations and domains to the point of matching its capabilities to the human mind. Several recent studies have both explored the role of AI in the construction process and highlighted its benefits. In contrast, literature in the organization studies field has highlighted the fear that tasks currently done by humans will be done by AI in future. Motivated by these insights and with the understanding that construction is a labour intensive sector where knowledge is both fragmented and predominantly tacit in nature, this paper explores the integration of AI in construction processes across project phases from planning, scheduling, execution and maintenance operations using literary evidence and experiential insights. The findings show that AI can complement human skills rather than provide a substitute for them. This preliminary study is expected to be a stepping stone for further research and implementation in practice.

  • PDF

Real-Time Scheduling Scheme based on Reinforcement Learning Considering Minimizing Setup Cost (작업 준비비용 최소화를 고려한 강화학습 기반의 실시간 일정계획 수립기법)

  • Yoo, Woosik;Kim, Sungjae;Kim, Kwanho
    • The Journal of Society for e-Business Studies
    • /
    • v.25 no.2
    • /
    • pp.15-27
    • /
    • 2020
  • This study starts with the idea that the process of creating a Gantt Chart for schedule planning is similar to Tetris game with only a straight line. In Tetris games, the X axis is M machines and the Y axis is time. It is assumed that all types of orders can be worked without separation in all machines, but if the types of orders are different, setup cost will be incurred without delay. In this study, the game described above was named Gantris and the game environment was implemented. The AI-scheduling table through in-depth reinforcement learning compares the real-time scheduling table with the human-made game schedule. In the comparative study, the learning environment was studied in single order list learning environment and random order list learning environment. The two systems to be compared in this study are four machines (Machine)-two types of system (4M2T) and ten machines-six types of system (10M6T). As a performance indicator of the generated schedule, a weighted sum of setup cost, makespan and idle time in processing 100 orders were scheduled. As a result of the comparative study, in 4M2T system, regardless of the learning environment, the learned system generated schedule plan with better performance index than the experimenter. In the case of 10M6T system, the AI system generated a schedule of better performance indicators than the experimenter in a single learning environment, but showed a bad performance index than the experimenter in random learning environment. However, in comparing the number of job changes, the learning system showed better results than those of the 4M2T and 10M6T, showing excellent scheduling performance.

Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects (산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가)

  • Lee, Kyusung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.140-151
    • /
    • 2013
  • In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.

Applications of Mathematical Optimization Method for Chemical Industries (화학 산업에서 수학적 최적화 기법을 적용한 사례)

  • Kim, Eun-Yong;Heo, Soon-Ki;Lee, Kyu-Hwang;Lee, Hokyung
    • Korean Chemical Engineering Research
    • /
    • v.58 no.2
    • /
    • pp.209-223
    • /
    • 2020
  • Executions of SCM in a chemical company of which divisions produce petrochemicals, compounds, batteries, IT material and medicine directly affect their own profit. Execution level of SCM or optimization is very important. This work presents activities of SCM and optimization of inefficient issues in several industrial divisions using mathematical optimization method. The meaning is not only academic research but also making a useful tool which active partner deals with in his work. It is explained how to do beforehand and afterward optimization problem. The benefits are mentioned in the sections. The first of examples would be cover supply plan optimization, optimal profit business plan, and scheduling of a stretching process of polarizer based on minimizing raw material loss in polarizer production. The second example would be cover the optimization of production/packaging plans to maximize productivity of Poly Olefin processes, and the third example is minimization of transition loss in the production of battery electrodes. The fourth example would be cover scheduling of vessel approaching to berth. Because transportation of large portion of raw material and products of petrochemical industry is dealt with vessel, scheduling of vessel approaching to berth is important at the shore of large difference of tide. The final example would be scheduling problem to minimization of change over time of ABS semi products.

The Design of IoT-based Drive Through Service System for Customers in Distribution Stores (대형 유통매장의 고객을 위한 IoT기반 드라이브 스루 서비스 시스템 설계)

  • Min, So-Yeon;Lee, Jong-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.151-157
    • /
    • 2017
  • Recently, the retail industry has created efficient store operations, and has differentiated customer service through the future store. The intelligence of these stores is being applied by using technologies such as the Internet of Things (IoT), and the business process is being improved through this. The process also focuses on efficient store operations and service developments to provide customers with shopping convenience. The change in trends in the industry means that domestic distribution has already reached maturity. Even in countries where retail industries are mature, such as the U.S. and Europe, recent trends are moving toward maximizing operational efficiency and customer service. The reason is that many retailers have already reached saturation and survived the competition. This paper is a study of a drive-through service for automation and efficiency in receiving service after ordering by a customer of the distribution store. When ordering a product being purchased by a customer, the product picking process is done in a timely fashion through a picking scheduling agent. When the customer enters the store parking lot, a service supports the entry of information and finding a parking place so the customer can quickly pick up the goods. The proposed service can be applied to a retail store drive-through system, the distribution store's delivery system, the digital picking system, and indoor/outdoor large parking management systems, and it is possible to provide one-dimensional customer service through the application of IoT technology.

A Study on the SCM Capability Modeling and Process Improvement in Small Venture Firms (중소·벤처기업의 SCM역량 모델링과 프로세스 개선 방안에 관한 연구)

  • Lee, Seolbin;Park, Jugyeong
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.13 no.2
    • /
    • pp.115-123
    • /
    • 2018
  • This study is empirically intended to put forward the modeling and process improvement measures for the SCM capability in small venture firms. The findings are summarized as follows. There were strategic alliance, technological development and centralization in the modeling of strategic planning for supply chain, not the least of which is strategic alliance, followed by centralization and technological development. There were routing scheduling, network integration and third party logistics outsourcing in decision making, not the least of which was network integration. There were customer service management, productivity management and quality management in management control, not the least of which was quality management. And there were order management choice, pricing demand, shipment delivery and customer management in transaction support system, not the least of which was order management choice. As for the above-mentioned findings, to maximize the SCM capability and operate the optimized process in small venture firms, the existing strategic alliances can optimize the quality management and stabilize the transaction support system through the network sharing and integration from the perspective of relevant organizational members' capability and process improvement. And the strategic linkage between firms can maximize the integrated capability of information system beyond the simple exchange relation between electronic data, achieving a differentiated competitive advantage. Consequently, the systematization and centralization for the maximization of SCM capability, including the infrastructure construction based on the system compatibility and reliability for information integration, should be preceded before the modeling of the integrated capability for optimum supply chain and the best process management in the smart era.