• Title/Summary/Keyword: Building maintenance management

Search Result 543, Processing Time 0.029 seconds

Study of the Value of National Cultural Heritage in the Gaetaesa Temple Site, Nonsan and the Establishment of an Integrated Maintenance Plan (논산 개태사지의 국가문화재적 가치 및 종합정비방안 수립에 관한 연구)

  • Seo, Jung-young
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.47 no.2
    • /
    • pp.76-87
    • /
    • 2019
  • This study aims to analyze the status of the Gaetaesa Temple Site in Nonsan and the value of national cultural heritage associated with it, to work towards gaining the acceptance criteria to become state-designated cultural property and to propose a plan for comprehensive maintenance, a plan for the promotion of the project and a plan for the management and operation. The Gaetaesa Temple Site in Nonsan has unprecedented advancements, and the condition of the remains are relatively good. It would be necessary to conduct digging/excavation surveys continuously in the future and ensure the dignity of the Gaetaesa Temple Site in Nonsan as a cultural asset. In addition, the Gaetaesa Temple Site has excellent historical and cultural values as treasure-class cultural heritage. Most temples had treasures taken out of them, so it is necessary to designate this site as a state-designated cultural property instead of a municipality-designated cultural heritage site, and to manage it systematically. Accordingly, this study investigated the history and historical facts about the Gaetaesa Temple Site in Nonsan through the analysis of literature, including old documents, old maps, related academic papers and books, and referred to the results of digging/excavation surveys, conducted up to six times since the first excavation survey conducted in 1986, in order to understand the status of the remains, ruins and the building sites excavated at the Gaetaesa Temple Site in Nonsan. In addition, this study analyzed the values of the Gaetaesa Temple Site in Nonsan, dividing them into the remains, relics and ruins, and set up the scope of the Gaetaesa Temple Site in Nonsan, the cultural property area (designated and protected areas) and the acceptance criteria for the construction work in the historical and cultural environment preservation area. This study proposed a plan for the comprehensive maintenance of the Gaetaesa Temple Site in Nonsan, a plan for the promotion of the project and a plan for the management and operation. It is necessary to carry out ongoing excavation investigations and to reflect the opinions of the residents for the purchase of land, to supplement the comprehensive maintenance plan, business promotion and management plans, and step-by-step business plans should be established in detail.

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.

Methodology for Estimating the Probability of Damage to a Heat Transmission Pipe (열수송관 파손확률 추정 방법론 개발)

  • Kong, Myeongsik;Kang, Jaemo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.11
    • /
    • pp.15-21
    • /
    • 2021
  • Losses of both life and property increased from damage to underground pipe such as heat transmission pipe buried underground in downtown because pipes are gradually aging. Considering the characteristics of the heat transmission pipe, which is not exposed to the outside and difficult to immediately identify problems such as damage, it is realistic to indirectly check the condition of the facility based on the historical information that is periodically collected through facility maintenance. In this study, a methodology for estimating the damage probability was developed by examining the history information of the heat transmission pipe, deriving an evaluation factor that is related to the damage probability. The contribution factor of the damage probability were reviewed by analyzing not only the guidelines for maintenance of heat transmission pipe of advanced European countries and domestic district heating companies, but also the cases of waterworks with similar characteristics. Evaluation factors were selected by considering not only the correlation with the damage probability but also the possibility of securing data. Based on 1999, when the construction technology and standards of heat transmission pipe changed, the damage probability estimation function according to the period of use was divided into the case of being buried before 1998 and the case of being buried after 1999, and presented. In addition, the damage probability was corrected by assigning weights according to the measured data for each evaluation factor such as the diameter, use, and management authority.

Application for Measurement of Curing Temperature of Concrete in a Construction Site using a Wireless Sensor Network (무선센서네트워크에 의한 콘크리트 양생온도 계측에 관한 현장 적용성 연구)

  • Lee, Sung-Bok;Bae, Kee-Sun;Lee, Do-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.283-291
    • /
    • 2011
  • As the construction industry has recently been transformed by the emergence of ubiquitous and intelligent technology, there have been major changes in the management methods employed. Specifically, next-generation construction management systems have been developed that collect and analyze many pieces of information in real time by using various wireless sensors and networks. The purpose of this study is to understand the current status of Ubiquitous Sensor Networks (USN) in the construction sector, and to gain fundamental data for a system of measuring concrete curing temperature in a construction site that employs a USN. By investigating the application status of USN, it was confirmed that USN has mainly been applied to the maintenance of facilities, safety management, and quality control. In addition, a field experiment in which the curing temperature of concrete was measured using a USN was carried out to evaluate two systems with wireless sensor networks, and the applicability of these systems on site was confirmed. However, it is estimated that the embedded wireless sensor type is affected by metal equipment on site, internal battery of sensor and concrete depth, and studies to provide more stable system by USN are thus required.

Structural Safety Evaluation of Cable Stayed Bridge based on Cable Damage Scenarios (사장교 케이블 손상 사나리오에 따른 구조 안전 수준 평가)

  • Kim, Ga Young;Seo, Dong-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.7
    • /
    • pp.105-111
    • /
    • 2018
  • This study aims to evaluate the safety for cable stayed bridge due to damages on the cable system. Many cable supported bridges, including cable stayed bridge and suspension bridge, have been built in the Korean peninsula. This requires efficient maintenance and management since this structure has complex structural components and system. This large structure also often faces risks either from manmade or natural phenomenon. In 2015 one cable-stayed bridge in South Korea had been struck by a bolt of lightning on the cables. This event had led to fire on cables. These cables had been damaged and putting the bridge at risk. This bridge was back in used after a few weeks of investigations and replacements of the cables. However, enormous social and economic expense were paid for recovery. After this event risk based management for infra structures is required by public demands. Therefore, this study was initiated and aimed to evaluate risks on the cable system due to potential damages. In this paper one cable-stayed bridge in South Korea was selected and investigated its safety based on the damage scenarios of cable system for efficient and prompt management, and for supporting decision making. FEM analysis was conducted to evaluate the safety of the bridges due to damages on the cable system.

Rapid Education and Training Methodology for North Korean Construction Workers through a Survey (설문조사를 통한 북한 건설노동자의 급속 양성 교육·훈련 방안)

  • Jung, In-Su;Lee, Giu;Kim, Keum-Ji;Park, Hyeong-Geun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.407-416
    • /
    • 2020
  • North Korea's demand for infrastructure construction and maintenance is growing rapidly. On the other hand, the number of skilled workers is insufficient. Therefore, through a survey of North Korean defectors, this study analyzed the status of construction technology and the difficulties of construction workers. In addition, an attempt was made to derive an appropriate education and training program process and operation plan. As a result of the survey, the reason for the low technical level of construction workers was the lack of skills, lack of motivation to work, and the lack of training and management systems. The appropriate education and training period was 56% of the total response within one year and 36% within six months. Based on the results of this survey, the period of education and training for the rapid training of construction technical personnel in North Korea was adopted as one year. Moreover, compared to the NCS standard in South Korea, appropriate training hours were suggested, excluding training courses, such as planning and design, construction management that require specialized knowledge. Finally, the curriculum corresponding to the education and training courses and the standards for facility names and required areas for facility operation were suggested.

Development of Road Bridge Information Management System based on Internet (교량 현황정보 관리를 위한 인터넷 기반 정보시스템 개발)

  • Park, Kyung-Hoon;Sun, Jong-Wan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.716-723
    • /
    • 2016
  • A computerized information management system of road bridges as a national key infrastructure is needed to effectively collect data of the current status, improve the reliability of data, and use the results from the analysis of the accumulated data as fundamental resources for supporting the establishment of policies. The Internet-based Bridge Information System (BIS), including a database and geographic information systems (GIS), was designed, and the data items were comprised of essential information, such as GIS-based location coordinates, bridge condition grade information and so on. The BIS was developed to be connected with a related information system, and it is possible to make the current information of traffic volume, address and so on by adopting the GIS. To enhance the reliability of the information of current bridge status, it is also possible to improve the accuracy of data through an information verifying function to prevent entry errors. In addition, the BIS can easily support the establishment of policies offering various types of knowledge information that were available in the past based on an analysis of the accumulated data. The intuitive identification and analysis of the current status is to be feasible through a GIS screen. Improvement of the business efficiency and data accuracy and time-series information analysis are available by managing the information of current status through BIS. In the future, it is expected that BIS can be used effectively for the establishment of reasonable maintenance policies of the nation.

A Study on the Types and Causes of Defects in Apartment Housing Information and Communication Work (공동주택 정보통신공사 하자 유형 및 원인에 관한 연구)

  • Park, Hyun Jung;Jeong, U Jin;Park, Jae Woo;Kang, Sang Hun;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.231-239
    • /
    • 2021
  • Entering the era of the fourth industrial revolution, information and communication technologies such as CCTV, home network systems and equipment are being used in the construction industry. In particular, in order to increase the autonomy of information and communication technologies in apartments, the government has announced an administrative revision of information and communication-related laws, and companies are focusing on developing technologies such as smart home services. In addition, most domestic and foreign studies on the information and communication work were mainly conducted on technology and management. However there is a lack of research on physical defects affecting the quality of ICT. Therefore, this study collected the defect data registered in the project management system of three domestic construction companies and classified them according to the standards of the Enforcement Decree of the Apartment House Management Act. According to the analysis of the frequency of defects work type, 88.10% of defects occurred in home network equipment work. In addition, analysis of defects type in the four detailed works showed the highest number of operation error. The cause was analyzed and prevention measures and countermeasures were presented in parts of design, construction, and maintenance. The results of this study will improve the quality of apartment housing and be used as basic data for future research on practical defect minimization and prevention measures.

Investigating Defect Types and Causative Factors in the Seismic Retrofitting of Educational Facilities (학교시설 내진보강공사 시 발생하는 하자 유형 및 하자 발생 요인 연구)

  • Kim, Moon Sik;Jung, Dae Gyo;Park, Hyun Jung;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.55-66
    • /
    • 2024
  • This research addresses the types and causes of defects in seismic retrofitting projects of school facilities, which, following the Gyeongju and Pohang earthquakes in September 2016 and November 2017 respectively, have been identified as having comparatively lower seismic resilience among public buildings. The incidence of seismic retrofitting has notably increased in the subsequent years, raising concerns about the potential for defects arising from these efforts. The government has committed to enhancing the seismic resilience of all public facilities by 2035, with a specific focus on completing upgrades for educational establishments by 2029. Although prior investigations have explored construction defects in school facilities, there exists a gap in research specifically targeting defects within seismic retrofitting processes. Thus, this study aims to catalog the defects associated with seismic retrofitting efforts and analyze their underlying causes to identify crucial management strategies for defect mitigation. Furthermore, by examining the interplay between defect types and their causative factors, the study seeks to pinpoint essential management practices that could preempt defects during the construction phase, ultimately aiding in the reduction of future maintenance expenditures.

Validity Evaluation of Real Time Mobile GIS combined with PDA in University Building Facility Management (대학시설물 관리W떠 PDA기반의 실시간 Mobile GIS 도입 타당성 평가)

  • 정지훈;엄정섭
    • Spatial Information Research
    • /
    • v.11 no.1
    • /
    • pp.41-60
    • /
    • 2003
  • It is noted that the paper mapping system for University Building Facility has many limitations in terms of data maintenance, real-time GIS data acquisition, and economic efficiency. The aim of this research was to evaluate an operational potential of an on site real-time mobile GIS technique to resolve the problem faced in the university. The idea is based upon the recent trends in the field of 'Telecommunication and Information Technology' that uses a PDA (personal Digital Assistants), wireless network computing, mobile computing, etc. A real time mobile GIS approach has been adopted, in which a PDA is linked to a wireless internet and field workers record data on the computer at the site and analyse data on site. While there should be a considerable number and variety of factors associated with real-time mobile GIS quality, this research focuses on three criteria that are identified as fundamental to customer requirements; (1) data quarry (2) spatial analysis (3) real-time GIS database building. 'Art--empirical study for a case study facility has been conducted to confirm the validity for the system. The system has been checked experimentally, enabled the field users to quarry the data required simply and execute spatial analysis (buffer, overlay etc.,) accommodating versatile alternatives on the site. Detailed visual maps can be generated over large areas quickly and easily. The PDA interface, in particular, were ideally suited for field users to interactively displaying positional information with attribute data. This system has shown to be quite convenient to maintaining a highly reliable database since it could playa crucial role in documenting at real-time basis temporal and spatial changes occurred in the facilities. It is anticipated that this research output will greatly serve to introduce the reliable and cost-effective facility mapping system in the university by overcoming serious constraints suffered from the past non-real time mobile GIS approach.

  • PDF