• Title/Summary/Keyword: Building layout

Search Result 344, Processing Time 0.031 seconds

Development of a Factory Layout Design System using Leisure-Boat Building Process (레저보트 생산공정정보 기반의 공장 레이아웃 설계 시스템 개발)

  • Lee, Dong-Kun;Jeong, Yong-Kuk;Shin, Jong-Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.1
    • /
    • pp.14-24
    • /
    • 2013
  • The marine leisure industry in Korea has been the focus of the power of economic growth and the creation of jobs in recent years. In this regard, many studies concerning marine leisure are on-going in various fields. In this paper, developed a layout system and algorithm can resolve the factory and facility layout problem. For a layout design of leisure-boat factories, the leisure-boat production process is analyzed in order to derive standard production space elements for the layout of the factory. Based on the results, a draft design of the factory layout is carried out based on the manpower planning data, as well as the characteristics and relationships of each process data. A layout design of this paper can be verified through a factory simulation solution and we suggest the verification method using a SBD(simulation based design) methodology. The layout system takes into account the user's accessibility and extendibility, so it is web-oriented and uses RIA (rich Internet Application) technology. Furthermore, the system and layout algorithm of this paper are verified with samples data that show the efficient factory arrangement and practical application method.

The Improvement of Real-time Updating Methods of the National Base Map Using Building Layout Drawing (건물배치도를 이용한 국가기본도 수시수정 방법 개선)

  • Shin, Chang Soo;Park, Moon Jae;Choi, Yun Soo;Baek, kyu Yeong;Kim, Jaemyeong
    • Journal of Cadastre & Land InformatiX
    • /
    • v.48 no.1
    • /
    • pp.139-151
    • /
    • 2018
  • The National Base Map construction consists of the regular correction work of dividing the whole country into two regions and carrying out the modification Plotting by aerial photographs every two years as well as the real time updating work of correcting the major change feature within two weeks by the field survey and the As-Built Drawing. In the case of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) used for real time updating work of the National base map, the coordinate transformation error is included in the positional error when applied to the National Base Map based on the World Geodetic Reference System as the coordinate system based on the Regional Geodetic Reference System. In addition, National Base Map is registered based on the outline(eaves line) of the building in the Digital Topographic Map, and the Cadastral and Architecture are registered based on the building center line. Therefore, the Building Object management standard is inconsistent. In order to investigate the improvement method, the network RTK survey was conducted directly on a location of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) and the problems were analyzed by comparing with the plane plotting position reference in National Base Map. In the case of the general structure with the difference on the Building center line and the eaves line, beside the location information was different also the difference in the ratio of the building object was different between Building center line and the eave. In conclusion, it is necessary to provide the Base data of the double layer of the Building center line and the outline of the building(eaves line) in order to utilize the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS). In addition, it is necessary to study an organic map update process that can acquire the up-to-dateness and the accuracy at the same time.

Applying a genetic algorithm to a block layout (블록단위 설비배치를 위한 유전자 알고리듬의 적용)

  • 우성식;박양병
    • Korean Management Science Review
    • /
    • v.14 no.1
    • /
    • pp.67-76
    • /
    • 1997
  • The most research on facility layout problems ignored the actual shapes of activity spaces and the aisles between activities. In many cases, the research also ignored the actual shape of building where the activities are to be arranged. In this paper, We present a block based layout technique that applies a genetic algorithm to search for a very good facility layout with horizontal aisles. From the extensive experiments for two different cases with respect to the shape of activity space, it was found that the proposed method generated better layouts than the ones obtained by applying Tam's algorithm in all test problems. The proposed algorithm showed about 10% improvement of performance on the average. We determined the best combination of the reproduction rule and the genetic operators with their probabilities for each test problem through the experiment.

  • PDF

A Layout Plan of a Pressure-fed Hot-firing Test Facility for the Performance Evaluation of a Combustion Chamber (연소기 성능평가를 위한 가압식 연소시험설비의 배치 계획)

  • Lee, Kwang-Jin;Cho, Nam-Kyung;Han, Young-Min
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2012.05a
    • /
    • pp.465-467
    • /
    • 2012
  • A layout plan of a pressure-fed test facility to carry out hot-firing test of liquid rocket engine combustion chamber and purpose of rooms located in the test building were proposed. The layout plan of suggested infrastructure in this paper was determined depending on the design of a vertical test facility to use the natural lay of the land and simulate the initial position of flight model.

  • PDF

A Study on the Production Period and Background of Gyeongbokgungdo (「경복궁도」 제작 시기와 배경 연구)

  • Hong, Hyeon-Do
    • Journal of architectural history
    • /
    • v.32 no.4
    • /
    • pp.51-62
    • /
    • 2023
  • Gyeongbokgungdo depicts the composition and layout of Gyeongbokgung Palace before the Japanese Invasion of Korea in 1592, as well as a monument related to pro-jamrye held at the site of Gyeongbokgung Palace in Yeongjo. Based on literature such as Dongguk Yeoji Seungram, such as Gyeongbokgungdo painted major buildings, government offices, and buildings in the backyard. In addition, the literature and the foot of the mountain, waterway, and Pond, which were identified as the site identified during the reconstruction process, are reflected, and some of the Gyeongbokgungdo contain reconstruction records. As such, Gyeongbokgungdo depicts Gyeongbokgung Palace in the early Joseon Dynasty and facilities built after the Imjin War based on the literature, and seems to have been produced around the time of reconstruction as it reflects the mountain and water system. In addition, the layout of the main hall of Gyeongbokgungdo was partially reflected in the reconstructed Gyeongbokgung Palace and used as a material to understand the layout of Gyeongbokgung Palace in the early Joseon Dynasty.

A Study on Changes of the Central Part of Beomeosa Temple - Based on Photographs and Drawings - (범어사(梵魚寺) 가람배치(伽藍配置)의 중단영역(中壇領域) 변화(變化)에 관한 연구(硏究) - 사진(寫眞)과 도판(圖版)을 중심(中心)으로 -)

  • Youn, Suk-Hwan;Han, Sam-Geon
    • Journal of architectural history
    • /
    • v.14 no.4 s.44
    • /
    • pp.41-58
    • /
    • 2005
  • This study was started under the judgement that reviewing $\ulcorner$A Survey Report of Korean Architecture$\lrcorner$, which contains photographs and drawings by Sekino Tadashi and which was also made under the order of the Japanese government(1902), would make it possible to consider in detail the status of Korean buildings in the period of the Korean Empire. The focus of the study. was put on three main parts of the temple, especially the central parts. The photographs and drawings as mentioned above showed that changes in the layout of buildings in the central part of the temple were made between the period of the Korean Empire and that of Japanese occupation. Thus the purpose of the study is to investigate when changes in building layout in the central part of the temple were made and what made such changes to be caused, obtaining information necessary for future changes in the precincts of the temple. Results of the study can be summarized as follows. First, 'Seonchal Daebonsan Beomeosa feonkeongdo' and 'Gyeongsangnamdo Dongraegun Beomeosa Geonmul Jeondo' were made in a same period. While, 'Chosun Gojeok Dobo', published by the government-general of Chosun, was a collection of photographs taken by Sekino Tadashi for about 30 years from 1902 to 1933 under the order of the Japanese government. But there were few changes in the building layout of the temple shown in the three materials. Second, one of the photographs and drawings made since 1933, not contained in 'Chosun Gojeok Dobo', and discovered by this researcher was 'Seonchal Daebonsan Beomeosa Annae' which was published by the temple itself after national independence from the period of Japanese occupation, indicating the main reason of changes in building layout as mentioned above. In conclusion, the layout of buildings of the temple began to be changed on a large scale, with so-called 'Cheyongseol' ignored, when Buddhist monk Cha Woon Ho established a 7-storied sarira tower to the left of the main building in the center of the upper part in 1936. In addition, the axis line connecting between Hwaeomjong and Seonjong was also changed at that time.

  • PDF

New shipyard layout design for the preliminary phase & case study for the green field project

  • Song, Young Joo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.5 no.1
    • /
    • pp.132-146
    • /
    • 2013
  • For several decades, Asian nations such as Korea, Japan and China have been leading the shipbuilding industry since the decline in Europe and America. However, several developing countries such as India, Brazil, etc. are going to make an entrance into the shipbuilding industry. These developing countries are finding technical partners or information providers because they are in situation of little experiences and technologies. Now, the shipbuilding engineering companies of shipbuilding advanced countries are getting a chance of engineering business against those developing countries. The starting point of this business model is green field project for the construction of new shipyard. This business model is started with a design of the shipyard layout. For the conducting of the shipyard layout design, four kinds of engineering parts are required. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is the foundation of the other engineering parts and it determines the shipyard capacity during the shipyard operation lifecycle. Previous researches about the shipyard layout design are out of the range from the business requirements because most research cases are in the tower of ivory, which means that there are little consideration of real ship and shipbuilding operation. In this paper, a shipyard layout design for preliminary phase is conducted for the target of newly planned shipyard at Venezuela of South America with an integrated method that is capable of dealing with actual master data from the shipyard. The layout design method of this paper is differentiated from the previous researches in that the actual product data from the target ship and the actual shipbuilding operation data are used for the required area estimation.

Seismic Performance Evaluation of Existing Buildings with Engineer-oriented Computerized System (엔지니어기반 전산시스템을 적용한 철근콘크리트 기존 건축물의 내진성능평가)

  • Hwang, Sunwoo;Kim, Dong-Yeon;Kim, Taejin;Kim, Kyungtae
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.21 no.2
    • /
    • pp.105-114
    • /
    • 2017
  • Nonlinear analysis for seismic performance evaluation of existing building usually takes 4~5 times more than linear analysis based on KBC code. To obtain accurate results from the nonlinear analysis, there are a lot of things to be considered for nonlinear analysis modeling. For example, reinforcing layout, applied load and seismic details affect behavior of structural members for the existing building. Engineer-oriented computerized system was developed for engineers to evaluate effective seismic performance of existing buildings with abiding by seismic design principles. Using the engineer-oriented program, seismic performance evaluation of reinforced concrete building was performed. Nonlinear hinge properties were applied with real time multiple consideration such as section layout, section analysis result, applied load and performance levels. As a result, the building was evaluated to satisfy LS(Life Safety) performance level. A comparison between engineer-oriented and program-oriented results is presented to show how important the role of structural engineer is for seismic performance evaluation of existing buildings.

A study on the plan for the corridor of Silla Buddhist temples in the 6~8th Century through examining remains (유구검토를 통한 6~8세기 신라 불교사원 회랑 건축계획 연구)

  • Kim, Sookyung;Lee, Eun Bee
    • Journal of architectural history
    • /
    • v.28 no.5
    • /
    • pp.19-26
    • /
    • 2019
  • The subjects of this study were limited to Silla buddhist temple remains in the 6~8th century, where the excavation survey report was published and the details of the remains of the corridor are revealed. Since the corridor completes the structure of temple and is involved in formation of the space, the building plan for corridors is thought to have an intention linked to the entire temple. Thus, more closer study is required for this construction plan to identify the role of corridors. The corridor is a building that has a low architectural hierarchy and completes the layout and composition of the temple. In the unit planning of the corridor, unit were designed to be of a certain size in the temple layout. Then, the overall scale was made by adding the fixed size of unit. The combination of corridors are the combined points of paths and were used as visual points. The structure of the corridor was constructed to be adjusted according to the size of the main compartment of the building to which it was connected and inserted under the roof of the building. The adjustment of the unit changed in the range of 0.5 to 2 of Silla's system of measurement. The usage of embedded pillar in the corridor presents a new perspective on Silla architecture.