• 제목/요약/키워드: Building equipment system

검색결과 597건 처리시간 0.032초

건물 군관리시스템 구축방안 (A Construction of the N-BMS Focused on the Building Service Equipment (N-BMS : National Building Management System))

  • 이태원;김용기;강성주
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2007년도 동계학술발표대회 논문집
    • /
    • pp.149-154
    • /
    • 2007
  • Now, in Korea, the performances of the building service equipment relay on the individual superintendent's share for the assessment of performance, fault detection, deterioration diagnosis of the building service equipment. As the result, very different quality of the performance or the durability of equipment is being obtained with his skill and effort and it is also not easy to assess that quality. This finally lead to the waste of labor force and the operating cost due to the high-cost, low-efficiency system. How to construct the N-BMS was considered to save energy, resource and to conserve performance of building service equipment. The FEMIS, facility, energy/environmental management & information system, for building service offer management process integrated with BAS, FMS and EMS and so on.

  • PDF

실내 미생물오염 전파방지를 위한 멀티죤 모델링에 관한 연구 (The study on the multizone modeling for preventing transmission of air borne contagion)

  • 최상곤;이현우;홍진관
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2006년도 하계학술발표대회 논문집
    • /
    • pp.429-435
    • /
    • 2006
  • In this study multi-zone modeling program CONTAM 2.4 which is developed by NIST is used for modeling the air disinfection system which is consist of dilution, filtration, ultra violet germicidal irradiation (UVGI) for removing the indoor microorganism such as bacteria and fungus. Developed models those protect occupants against indoor microorganism generated in our daily life are enable to use for immune building simulation tool. Also, results indicate that those models are enable to compute the real situation that is almost impossible of carrying out experiment and identify the disinfection rate with highly reliance. Results also suggest that engineers will use these models as a design tool for the immune building system.

  • PDF

IT를 활용한 공조설비의 온라인 유지관리시스템 개발 (A Development of the On-line Maintenance and Management System for the HVAC system Using IT)

  • 이태원;김용기;강성주;우남섭
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.48-53
    • /
    • 2008
  • The performances of the building service equipment relay on the individual superintendent's share for the assessment of performance, fault detection, deterioration diagnosis of the building service equipment. A major use of building energy management system(BEMS) is for monitoring plant and building's energy consumption. National building management system (N-BMS) presented in this study links buildings into a network group in order to monitor and control the buildings. How to construct the N-BMS was considered to save energy resource and to conserve performance of building service equipment. The FEMIS, facility, energy/environmental management & information system, for building service offer management process integrated with BAS, FMS and EMS and so on.

  • PDF

사무용 건축물 공조설비 설계도서 분석 (Analysis of Office Building HVAC System Drawings)

  • 박종일;김세환;김동규
    • 설비공학논문집
    • /
    • 제19권11호
    • /
    • pp.776-781
    • /
    • 2007
  • Optimized capacity of equipments are essential for energy saving and low cost construction and operation. So we must use proper design data for HVAC system design. We investigated for architectural data, equipment capacity, cooling and heating load design criteria of 52 office buildings. Following research results were obtained by carrying out each task. Office building effective area rate is 63%. The average building cooling load of South Korea is $140W/m^2$ and average heating loads in Seoul and Pusan area are $120{\sim}130W/m^2$ and $70{\sim}80W/m^2$. We also analysised HVAC design criteria. Person ratio in effective building area is $0.2person/m^2$, sensitive and latent heat loads of a person are 60W and 65W, light and equipment loads of office buildings are $25W/m^2$ and $20W/m^2$.

학교건물(學校建物) 건축설비(建築設備)시스템의 노후도(老朽度) 평가(評價) 기준(基準)마련을 위한 기초연구(基礎硏究) (Evaluation of Deterioration Grade for Remodeling Architectural Facilities in Old Schools)

  • 조민관;조창근;박종수
    • 교육시설
    • /
    • 제13권4호
    • /
    • pp.15-23
    • /
    • 2006
  • The purpose of this study is to establish the objective deterioration grades and evaluation criteria of building equipment system of educational facilities available for reasonable maintenance and remodeling of them. For the purpose of it, the actual conditions of building equipment systems of the 148 buildings of 84 middle and high schools in Seoul 20 years after construction are investigated and surveyed through one-on-one interviews and questionnaires. And, deterioration grades of them are estimated by the evaluation criteria which is proposed in this study. As a result of this study, the 10 deterioration grades and the 4 evaluation criteria of the 6 performances of building equipment system, which are heating and cooling, water supply and drainage, hot water supply and electrical power performance, are suggested. And, as a result of the survey, it showed that 24% of the investigated school buildings were estimated C grade which needs partial remodelling, and 51% of the school buildings were estimated D grade which needs extensive remodelling. And, 25% of the school buildings were estimated E grade which needs overall remodelling or alteration of building equipment system.

BIM을 적용한 건설공사 중장비 투입 계획 방안 (Heavy Equipment Management Plan for BIM-Based Construction Project)

  • 강경환;김상환;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.171-174
    • /
    • 2010
  • Recently, our construction industry progress using the BIM system in the construction designing part. However, there are not preparing government policy about BIM even if there are many good things using BIM system on planning of heavy equipment. Therefore, planning for a input system of heavy equipment using BIM will be a kind of first challenge in this part. However, we've tried using strength point of BIM system to make better condition of our construction fields. So this study will be expected to shorten the construction time and using heavy equipment effectively.

  • PDF

시가표준액을 활용한 건설공사표준품셈 건설기계가격 상시관리 방안 (How to Use Standard Market Prices for Ordinary Management System of Construction Equipment Prices in Poom-Saem)

  • 안방율;허영기;김대영;태용호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.98-99
    • /
    • 2014
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Despite its importance, the construction equipment cost may not reflect the current market value since the equipment database is being updated every 6 years at most. To keep construction equipment cost up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a gap to adopt the standard market price system for the construction equipment cost computing system. Therefore, this paper suggests an effective way to develop a construction equipment cost estimation system.

  • PDF