• Title/Summary/Keyword: Building Wall

Search Result 1,779, Processing Time 0.027 seconds

Work Time of Basement Composite Wall Form Assembly by Work Time Analysis (작업분석을 통한 합벽거푸집 구성 요소별 작업소요시간에 관한 연구)

  • Heo, Kyoung-Moo;Kim, Myoung-Hyun;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.9-13
    • /
    • 2009
  • Recently, construction in downtown is often done closely at the adjacent building. In this case, underground construction need to Basement Composite Wall(BCW) construction. However, generally, during the construction process of BCW form works have many problems that are narrow working space and inefficient time consuming. Despite of these problems, there was no quantitative research for the work time of BCM assembly. Therefore, in this study, work time of CBW form assembly in underground construction is identified by the work analysis. The results of this study reveal that buttress work of basement form take lots of time in the entire work process of Basement Composite Wall form assembly.

  • PDF

A Study on the Analysis of Insulation Performance according to Curtain Wall Type and Insulation Material Form (커튼월 형태 및 단열재 형상에 따른 단열성능 분석에 관한 연구)

  • You, Nam-Gyu;Hong, Sang-Hun;Kim, Hae-Na;Seo, Eun-Seok;Kim, Bong-Joo;Jung, Ui-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.165-166
    • /
    • 2019
  • Curtain wall means a non-bearing wall that forms the outer walls of a building to divide the exterior and interior space. The increased use of curtain walls is diverse, including structural safety, watertightness, and wind pressure. As the government's energy conservation policy and the aim of zero-energy houses, the importance of heat reduction is also greatly increased. So, the study of monotony is constantly being conducted. Thus, in this study, insulation performance was analyzed through simulation according to the shape of curtain wall and the shape of insulation inside, and the purpose of this study was to provide basic data on the application of insulation criteria by energy saving design of buildings.

  • PDF

The study of in-situ measurement method for wall thermal performance diagnosis of existing apartment (기존 공동 주택의 벽체 열성능 현장 측정법에 관한 연구)

  • Kim, Seohoon;Kim, Jonghun;Yoo, Seunghwan;Jeong, Hakgeun;Song, Kyoodong
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.71-77
    • /
    • 2016
  • Purpose : The energy saving in a residential building (apartment) sector is known as one of the effective solution of energy reduction. In South Korea, the government has recently reinforced regulations associated with the energy performance of buildings. However, there is a lack of research on the methods for the energy performance diagnosis that is used to analyze the wall thermal performance of the existing apartments. Because a reliable diagnosis is necessary to save the building energy, this study analyzed wall thermal performance of an existing apartment in Seoul. Method : This paper applied two methods for analysis of the thermal insulation performance; HFM(Heat Flow Meter) method and ASTR(Air-Surface Temperature Ratio) method. The HFM method is suggested by ISO9869-1 code to measure the thermal performance. The ASTR method is proposed by this study for the simplified In-situ measurement and it uses three temperature data (interior wall surface, interior and exterior air) and the overall heat transfer coefficient. This study conducted the experiment of an existing apartment in Seoul using these methods and analyzed the results. Furthermore, the energy simulation tool of the building was used to suggest retrofit of the building based on the results of measurements. Result : The error rate of HFM method and ASTR method was analyzed in about 17 to 20%. As the results of comparison between the initial design values of the wall and the measured values, the 26% degradation of insulation thermal performance was measured. Lastly, the energy simulation tool of the building shows 10.8% energy savings in accordance with the construction of suggested retrofit.

A Study on the Development of Samsung Composite Shear Wall System (삼성의 벽식 구조 복합화 공법)

  • Park, Joon-Sung;Kim, Yeon-Kyeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.2
    • /
    • pp.175-180
    • /
    • 2002
  • "Samsung Composite Shear Wall System" has its basis on "Samung Able System". "Samsung Able System" has some problems not only in the connection structure but also in waterproofing and soundproofing. We developed "Samsung Composite Shear Wall System" in order to solve these matters and expand PC system. "Samsung Composite Shear Wall System" is the compromise and complement of all the merits of full PC, half PC and in-situ concrete system.

A Study on the Evaluation and Countermeasure of Electromagnetic Interference due to Buildings in TV Frequency Band (건축물에 의한 TV주파수대 전자파장해의 평가 및 대책에 관한 연구)

  • 박재석;김동일;박연준;이창우
    • Journal of the Korean Institute of Navigation
    • /
    • v.22 no.1
    • /
    • pp.55-62
    • /
    • 1998
  • In this paper, we have performed a numerical calculation of the scattered electromagnetic field around the building to evaluate electromagnetic interference caused by the building in the TV frequency band. The relations between the exposed concrete area of a building wall and the magnitude of the reflected wave have been examined in the case that the electroagnetic wave absorbers partially cover the building wall. From the obtained scattered electromagnetic field, we have calculated the DU radio and the required reflection loss of the electromagnetic wave absorbers which attached on the building wall to protect TV ghost.

  • PDF

Multitasking Façade: How to Combine BIPV with Passive Solar Mitigation Strategies in a High-Rise Curtain Wall System

  • Betancur, Juan
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.4
    • /
    • pp.307-313
    • /
    • 2017
  • This paper outlines the processes and strategies studied and selected by the team during the design stages of the project for the incorporation of BIPV into the tower's façade. The goal was to create a system that helps reduce internal heating and cooling loads while collecting energy through photovoltaic panels located throughout the building. The process used to develop this façade system can be broken down into three stages. 1. Concept: BIPV as design catalyst for a high-rise building. 2. Optimization: Balancing BIPV and Human comfort. 3. Integration: Incorporating BIPV into a custom curtain wall design. The FKI Project clearly illustrates the evolution building enclosures from simple wall systems to high performance integrated architectural and engineering design solutions. This design process and execution of this project represent the design philosophy of our firm.

Comparison on the Application of Various Productivity Analysis Methods for a Curtain wall Operation in High-rise Building Construction (초고층 커튼월 공사의 생산성 분석 기법에 대한 적용성 비교)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.211-212
    • /
    • 2011
  • The construction industry has become larger and higher in size. The process of high-rise building construction is complicated and has various conditions affecting productivity. Analysing productivity in high-rise buildings is difficult despite the various productivity analysis methods. In this study, data was collected from actual construction site to analyse the productivity of curtain wall operation by means of Work sampling and Method Productivity Delay Model. As a result, this paper suggests advantages and disadvantages deducted from comparing the two productivity analysis methods.

  • PDF

Characteristics and Applicability of CWS(Continuous Wall System)II Method (CWS(Continuous Wall System)II 공법의 특성 및 적용성)

  • Lim, In-sig;Lee, Jeong-bae;Kim, Jae-dong;Lee, Jai-ho;Woo, Sung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.43-47
    • /
    • 2008
  • CWSII method was developed to overcome the problems of frequent occurrence in the application of existing downward construction methods, especially in the case of using slurry wall instead of SCW or CIP as a retaining wall. By the improvements in connecting steel beams with the wall, CWSII method is able to ensure the settlement of a steel beam and the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. As the desired results, CWS method can be applied as a practical downward construction method regardless of the type of retaining wall. In this paper, besides the concept and features of CWSII method, it can be seen that the method can provide reliable and economical performances by comparing with existing methods.

  • PDF

A Study on the Development of Lightweight Wall for Sound Transmission Loss and Field Test Results of the Dry-Wall System (차음성능이 향상된 경량벽체 개발 및 성능평가 연구)

  • 이병권;배상환;홍천화
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.699-704
    • /
    • 2004
  • As being inconvenient to apply reinforced concrete structure to high-rise buildings, it is applied steel structured system. Therefore light-weight wall systems are applied as partition wall to reduce the self-load of the building. But, the required performances of a light-weight wall are not evaluated systematically. As a field survey result, partition walls of house-to-house were not showed their respected performances, so the dwellers are feel so worse the quality of the whole building. In steel-structured high-rise buildings especially, occupant's dissatisfaction concerned indoor noise was high because curtain wall systems having a high air-tight performance isolate the outdoor noise making masking effect. Therefore wall systems which have high performances of sound insulation and air-tightness are required in high-rise buildings. As a result, a new drywall system was presented and the performance was verified with field test.

  • PDF

Development of the construction specification framework for skyscraper outer wall cleaning robot (외벽청소로봇의 가이드레일 시공기준체계 구축에 관한 연구)

  • Park, Su-Yeul;Kim, Kyoon-Tai;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.292-294
    • /
    • 2013
  • When the number of skyscrapers are increased in the domestic, it has increased the need of the outer wall cleaning robot. However, it does not exist the construction specification of the outer wall cleaning robot in the domestic. it is difficult to apply in the domestic that the outer wall cleaning robot. For this reason, it raised the need of the construction specification. And it is urgent that the construction specification of the outer wall cleaning robot is needed to develop in the domestic. Therefore, this study aims to propose the construction specification framework of the outer wall cleaning robot. In the future, this study will be based on the development of the construction specification on the outer wall cleaning robot.

  • PDF