• Title/Summary/Keyword: Building Survey

Search Result 1,930, Processing Time 0.027 seconds

A Study on the Fire-Safety Design for the Historic Buildings (역사적 건조물의 화재안전을 위한 기초연구)

  • Lee Ji-Hee
    • Journal of the Korean housing association
    • /
    • v.15 no.6
    • /
    • pp.107-113
    • /
    • 2004
  • Fire was and remains a great threat to historic buildings of wood. This threat is omnipresent and often results to irreparable property losses especially cultural heritages. Fire of historic buildings continues to increase every year. The purpose of this study is to preserve a life safety, historical heritage and architectural & cultural values by pursuing for fire safety in the historical buildings. This study shall employ two research methods: a literature review and field survey methods. The literature review shall focus on the observations of characteristics noted in fire codes. The field survey shall cover a heat analysis and fire protection equipment. A method is proposed to investigate fire codes related historical building, reported fire history Fire Codes and Regulations for modern buildings are not always applicable on the historic buildings. Old buildings, and some new buildings with architectural, historical or cultural importance may have values which cannot be measured on a monetary scale. Their protection against the damage caused by fire is considered to be one of the basic moral duties of society. It is strongly recommended, therefore, legislation for fire safety in historical buildings must be extended to a complementary relationship with 'active' fire protection measures, to provide safety in real historical building in real fire situations. The development and application of performance based Codes and the Fire Safety Engineering approach seems to be a rather reasonable and effective way to deal with this historical buildings.

Integrating Building Information Modeling and Health and Safety for Onsite Construction

  • Ganah, Abdulkadir;John, Godfaurd A.
    • Safety and Health at Work
    • /
    • v.6 no.1
    • /
    • pp.39-45
    • /
    • 2015
  • Background: Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. Methods: In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. Results: The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. Conclusion: From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite.

A Basic Research for Algorithms of Form Quantity Survey of Green Frame (그린프레임의 거푸집 물량산출 알고리즘 기초연구)

  • Kim, Taekoo;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.193-194
    • /
    • 2014
  • Green Frame is a building frame system composed of precast concrete columns and beams. For the construction to run smoothly, the quantity of frames should be estimated in the planning phase and a plan on production of members should be established in connection with the overall work plan. The algorithm for calculation of the amount of forms used in Green Frame automatically estimates the quantity of forms using the design structure prepared in the design phase. The number and area of forms are calculated using the member size drawn from the structure design. Based on the quantity calculated, the type and area per form size are estimated to be used in preparing BOQ (Bill of Quantity). Thus, the time required for architectural planning and design can be shortened when the algorithm for calculation of the amount of forms is applied. This study is on the basic research of calculating the quantity of forms using the structure design and of the algorithm for calculation of the amount of forms used for production of composite PC members.

  • PDF

A Study on the Actual Conditions of Quality Standards Recognition of Rebar Workers (철근작업자의 품질기준 인지 실태 조사)

  • Lee, Byung-Yun;Choi, Oh-Young;Han, Byung-Min;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.243-246
    • /
    • 2009
  • Importance of quality control is gradually increasing in the construction. And the reber work is very important things which influence in safety and durability of the building and accounts for about 9.8% of the total cost. Although reber work is important, quality control of the rebar work is still performed by attitude and experience of worker. Therefore, it is very important to quality achievement effort and quality standards recognition of rebar worker for quality sophistication in the construction. Some papers have dealt with the quality control in construction. But there was no study for actual conditions of quality standards recognition of rebar workers. The purpose of this study is to survey the actual conditions of quality standards recognition of rebar workers and to analyze difference of consciousness of administrator and worker. The result are : there id difference of consciousness of worker and administrator, workers work without knowing quality standard.

  • PDF

A study on the dimension unit of framework on Yingzaofashi - Confrontation between Chi(尺) hypothesis and Fen(分°) hypothesis - (송 『영조법식』의 건축계획 치수 단위에 대한 이론적 고찰 - 자(尺) 단위 계획설과 분(分°) 단위 계획설 간의 논쟁을 중심으로 -)

  • Baik, So-Hun
    • Journal of architectural history
    • /
    • v.31 no.3
    • /
    • pp.7-16
    • /
    • 2022
  • Fen(分°) is the proportional dimension unit of the standard timber section on Yingzaofashi(營造法式), and there is a phrase that not only structural members but the whole structural design of a building also use Fen as the dimension unit on the book. But in fact only the section dimensions of structural members are recorded by Fen, but the design dimensions are recorded by Chi(尺) on the book. Other historical records also described the building size by Chi. So there has been long-standing debate on the phase in Chinese architectural history society, including the recent confrontation on the analysis of survey figures of the east great hall of Foguangsi temple(佛光寺 東大殿). This paper analyzes all the records about the size of structural members and section planning on the book to make various calculation and evaluation. And it makes a survey of Cai(材) as the dimension and design unit between Chi and Fen through geometric analysis. Cai might be a rough unit of measurement in terms of structural and proportional scheming on Yingzaofashi, and the full size Cai(足材) had been a building scheming module before the Song dynasty.

STRATEGIC MANAGEMENT OF CHANGES IN EDUCATIONAL BUILDING PROJECTS: A TIMELINE-BASED CHECKLIST APPROACH

  • Faisal Manzoor Arain;Low Sui Pheng
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.540-553
    • /
    • 2007
  • Strategic management of changes is very significant for all types of construction projects. Project management teams must have the ability to respond to changes effectively in order to minimize their adverse impact on the project. The study focuses on the causes, their frequent effects and effective controls for changes in educational building projects. To achieve the study objectives, a questionnaire survey was carried out to collect relevant information. Through the literature review, 53 causes, 16 effects and 30 potential controls for change orders were identified. These provided the basis for the formulation of the questionnaire. Responses from 92 professionals who were involved in the educational projects in Singapore were analyzed. They included 28 developers, 33 consultants and 31 contractors. From the survey findings, the most important causes of changes were identified. The study revealed the most frequent effects and most effective controls for each cause of change order. Arising therefrom, a comprehensive tabulation of the 53 causes and their frequent effects and effective controls was also developed. A timeline for implementing the controls was developed through in-depth interviews with the professionals. The study would assist building professionals in taking proactive measures for reducing change orders for educational buildings; furthermore, the timeline would also be helpful for them to implement controlling strategies at the appropriate time. Recommendations were suggested based on the research findings.

  • PDF

Customers' Needs Analysis for Investment Decision Making in Residential Facility for Retired Seniors (유료노인주거시설에 대한 투자 의사결정을 위한 수요자 요구 분석)

  • Chin, Mee-Youn;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.53-61
    • /
    • 2008
  • It is expected that the market of residential facility for retired seniors will be a new investment field for construction firms. This study describes the questionnaire survey analysis results of potential customers' demand for the facility. For comparison purpose, direct construction cost was estimated by estimation experts. In addition, a case analysis was conducted to compare direct cost and indirect project cost with the experts' estimation. According to the questionnaire survey analysis, it is observed that there were significant differences in demand between groups which are classified by the regions, living expenditures, the level of property ownership and the scales of residence. From an investor's perspective, investment decision on residential facility for retired seniors should be made considering bothe the level of returns which can be generated from the investment and the customers' needs.

Building Surveys and Nationalization on Royal Facilities During the Residency-General Period (1906~1910) (통감부 시기 황실시설의 조사와 국유화)

  • Lee, Geau-Chul
    • Journal of architectural history
    • /
    • v.22 no.4
    • /
    • pp.59-72
    • /
    • 2013
  • Jedoguk and Jaesiljaesanjeongriguk were the offices related to the reorganization of the royal finance during the Residency-General period and surveyed royal facilities. Jedoguk surveyed palaces, offices and royal ritual facilities in the manner of traditional survey. However, Jaesiljaesajeongriguk which is the successor office to Jedoguk surveyed royal facilities using the modern surveying techniques and figured out the value of royal facilities. In 1908, most of the royal facilities were nationalized and were managed as government property by Takjibu. These nationalized royal facilities were used new modern facilities under the rule of Japanese.

Priority on Work Improvement for Automation of Ceiling Finishing Work (천장마감공사 자동화기술 적용을 위한 작업개선 우선순위 도출)

  • Lee, June-Hyuck;Lee, Dongyoun;Kang, Goune;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.187-188
    • /
    • 2015
  • The construction finishing work is emphasized according to high dependence on labor and long term that occupy approximately 40% in construction period, so that it is required for the alternatives such as automation technology. However, it is insufficient to develop the automation technology of construction finishing work compared to other works, for instance, frame work. Also it is not enough about this preliminary research which survey the improvement needs to select the development object. Therefore, this study aimed at derivation of detail works required improvement in ceiling finishing work by the questionnaire survey. These results may provide the basic information to develop the automation technology of construction finishing work.

  • PDF

A Comparative Analysis on the Work Importance of Customized and Expansion Remodeling Project (맞춤형 및 증축형 리모델링 공사의 업무중요도 비교·분석)

  • Kim, Min-Jae;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.66-67
    • /
    • 2015
  • This study compared and analyzed the job importance that site managers perceived by dividing the study scope into customized and expansion remodeling projects and deriving the job descriptions from previous studies. As a result, a total of 7 construction stages and 53 job descriptions were derived. As job importance in customized remodeling projects, removal and demolition works were the most important, followed by preliminary survey, and repair and reinforcement works. In addition, as job importance in expansion remodeling projects, preliminary survey is the most important, followed by civil engineering work, and repair and reinforcement works. It is considered that the job importance of the remodeling projects derived in this study will contribute to improving their job efficiency in the future.

  • PDF