Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

Meeting the Energy Reduction Goal on a High Rise Building thru IPD Framework

  • Jeong, Pyung Oh;Lee, Peter;Kim, Sang-jin
    • 국제초고층학회논문집
    • /
    • 제2권2호
    • /
    • pp.93-96
    • /
    • 2013
  • Greenhouse gas emissions and excessive energy consumption have been an on-going world issue nowadays. We can find that the majority portion is caused by high-rise office buildings. In order to resolve these problems, it is extremely important to implement various active or passive strategies in a building design. To successfully meet these design goals and energy reduction approaches, a project building must utilize an efficient design process from the early start. One of the most effective project delivery process called Integrated Project Delivery (IPD) will be implemented in a case study project building (KEPCO) during design phase and show how important it is to plan a project's green environmental performance goal together through an early collaboration from all key project participants, which helps to construct an successful green building design without any critical construction pitfalls.

Measuring the Impact of Change Orders on Project Performances by Building Type

  • Juarez, Marcus;Kim, Joseph J.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.179-187
    • /
    • 2022
  • The project performances can be measured in terms of meeting the project schedule, budget, and conformance to functional and technical specifications. Numerous studies have been conducted to examine the causes and effects of change orders for both vertical and horizontal construction, respectively. However, these studies mainly focus on a single project type, so this paper examines the impact of change order for cost growth and schedule overruns using four different building types to close the gap in the change order research area. A total of 211 building projects are collected from four building types: healthcare, residential, office, and education. Statistical analyses using ANOVA tests and linear regression models are used to examine the created metric $CO/day on the cost and schedule impacts. The results found that mean $CO/day values were not statistically different among building types, and that the sum of change orders is a statistically significant predictor of $CO/day. The results will help project stakeholders mitigate the negative change orders effects can be a challenge for project managers and researchers alike.

  • PDF

건축 프로젝트의 협력설계 방안 (Cooperative Design Method for Building Projects)

  • 김은연;이재헌
    • 플랜트 저널
    • /
    • 제7권4호
    • /
    • pp.67-76
    • /
    • 2011
  • Two main features of the recent building project are the enlargement of the size and the technological complexity. Due to these features, the number or the size of organizations participating in building project is also increasing and the relationships between the organizations are becoming more interdependent than ever. Owing to these features, some delays or errors in the decision-making process in the phase of planning of a building project may influence many subjects related to the project. The most important factor for a successful project is to arbitrate confrontations and build cooperative relationships between parties who have different interests with one another in the project. Efforts were made to find out general features of building project and the features in the phase of planning in order to set a direction of this research. To solve problems in the phase of planning, the concept of 'cooperative design', which means that different features and interests of various organizations should be reflected from the phase of planning, was introduced. By introducing cooperative design in building projects, more rapid and objective decision-makings are possible.

  • PDF

Analyzing the Priority of Leadership Elements for Project Manager of Building Construction Project

  • Kim, Jin-Dong;Kim, Gwang-Hee
    • 한국건축시공학회지
    • /
    • 제12권1호
    • /
    • pp.31-41
    • /
    • 2012
  • In construction, the outcome of work depends on the leadership of the project manager, and as a result this has been emerging as an important factor. The purpose of this study is to analyze the main elements of leadership that are essential for project managers, and to rank these elements in order of importance. In this study, leadership and its elements are reviewed through reviewing the literature, and the main elements and their relative importance for project managers were analyzed through questionnaire survey of project managers, contractor engineers, and subcontractor engineers. Through this survey, it was found that the project manager's leadership had a significant influence on the success of a construction project, and this study revealed that the key elements of leadership for project manager could be ranked in the order of resolution, responsibility, and reliance.

서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구 (A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique)

  • 신재민;김광희
    • 교육녹색환경연구
    • /
    • 제11권3호
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

Decision-making Reliability Estimation Model based on Building Construction Project Participants' Experience

  • Kim, Chang-Won;Kim, Baek-Joong;Yoo, Wisung;Cho, Hunhee;Kang, Kyung-In
    • 한국건축시공학회지
    • /
    • 제13권2호
    • /
    • pp.148-158
    • /
    • 2013
  • Generally, building construction projects have a complex decision-making process because of the participation of various agents. In this situation, a final decision is arrived at by relying on subjective judgments based on the experience of project participants. For this reason, a method of assessing the objectivity of opinions is needed. In previous studies, the multi-criteria decision making method was applied to arrive at a final decision objectively, but this method has a limitation, in that the experience of each decision maker is not considered differently in the decision making process. Therefore, this study proposed a theoretical model using the S-shaped growth curve and regression analysis by building construction project type to quantitatively estimate decision-making reliability according to the experience of individual project participant`s. The developed model could be added to the Multi-criteria decision making method, and secure the objectivity and reliability of project participants' final opinion.

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

Support Vector Machine을 이용한 교육시설 초기 공사비 예측에 관한 연구 (A Study on Predicting Construction Cost of School Building Projects Based on Support Vector Machine Technique at the Early Project Stage)

  • 신재민;박현영;신윤석;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.153-154
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So many method and techniques have developed that can estimate construction cost using limited information available in the early stage. Among the techniques, Support Vector Machine(SVM) has received attention in various field due to its excellent capacity for self-learning and generalization performance. Therefore, the purpose of this study is to verify the applicability of cost prediction model based on SVM in school building project at the early stage. Data used in this study are 139 school building cost constructed from 2004 to 2007 in Gyeonggi-Do. And prediction error rate of 7.48% in support vector machine is obtained. So the results showed applicability of using SVM model for predicting construction cost of school building projects.

  • PDF