• Title/Summary/Keyword: Building History

Search Result 1,350, Processing Time 0.027 seconds

A Study on the Hermeneutic Dialogue in Architectural History (텍스트(Text)로서 과거 건축과 건축사 해석에 대하여)

  • Khang, Hyuk
    • Journal of architectural history
    • /
    • v.1 no.1 s.1
    • /
    • pp.255-266
    • /
    • 1992
  • The Main concern of this thesis is on the possibility to apply Hermeneutics to architectural history, with a view point that the past architecture can be seen as a text, this study analyse the relationship between the past building and interpreter, the epistenological tool for interpretation and historian. After reviewing the characteristics of architectural history with regard to text theory, this study can lead to the conclusion that the interpretation of past architecture can be defired as dynamic dialogue which depend upon the time.

  • PDF

Site-response effects on RC buildings isolated by triple concave friction pendulum bearings

  • Ates, Sevket;Yurdakul, Muhammet
    • Computers and Concrete
    • /
    • v.8 no.6
    • /
    • pp.693-715
    • /
    • 2011
  • The main object of this study is to evaluate the seismic response effects on a reinforced concrete building isolated by triple concave friction pendulum (TCFP) bearings. The site-response effects arise from the difference in the local soil conditions at the support points of the buildings. The local soil conditions are, therefore, considered as soft, medium and firm; separately. The results on the responses of the isolated building are compared with those of the non-isolated. The building model used in the time history analysis, which is a two-dimensional and eight-storey reinforced concrete building with and without the seismic isolation bearings and/or the local soil conditions, is composed of two-dimensional moment resisting frames for superstructure and of plane elements featuring plane-stress for substructure. The TCFP bearings for isolating the building are modelled as of a series arrangement of the three single concave friction pendulum (SCFP) bearings. In order to investigate the efficiency of both the seismic isolation bearings and the site-response effects on the buildings, the time history analyses are elaborately conducted. It is noted that the site-response effects are important for the isolated building constructed on soft, medium or firm type local foundation soil. The results of the analysis demonstrate that the site-response has significant effects on the response values of the structure-seismic isolation-foundation soil system.

A Study on the Fire Fighting General Index for Fire Fighting of Crowded Wooden Building Cultural Asset (군집 목조 건축문화재의 화재대응을 위한 소방방재 종합지수 연구)

  • Kwon, Heung-Soon;Lee, Jeong-Soo
    • Journal of architectural history
    • /
    • v.21 no.2
    • /
    • pp.37-52
    • /
    • 2012
  • This research has set up the fire fighting general index for Fire fighting of Crowded Wooden Building Cultural Asset which is composed of traditional wooden building instinct or complex. The results of this study are as follows. First, Fire fighting general index for crowded wooden building cultural asset, it is necessary to set fire fighting priority by considering fire risk and cultural asset characteristic and establish the system to cope with fire disaster in the most effective way by arranging facilities with restricted resource. Second, Fire risk is the index to draw fire and spread risk of cultural asset by applying index calculation processes such as fire load, burning velocity and ignition material spread characteristic to various aspects such as individual building and complex and combining their results. Cultural asset importance index consists of individual building evaluation, publicity security degree, area importance evaluation and historical landscape degree evaluation. Third, for each index combination process, weight of each index is drawn on the basis of AHP analysis result that is performed to the specialists of related fields. The formula to apply and combine it is prepared to apply the model to include meaning of each index and comparative importance degree.

The Architectural Type of 'Lu' in Choseon Dynasty (조선시대 루건축(樓建築)의 지역별 유형특성)

  • Choi, Mi-Kyung;Lee, Sang-Hae
    • Journal of architectural history
    • /
    • v.19 no.4
    • /
    • pp.7-19
    • /
    • 2010
  • 'Lu' is one of the Korean traditional building structure. The architectural characteristics of the 'Lu' can be classified two types with its use. One is single building type and the other is a part of building type within building complex. This study is about the two-storied 'Lu' that was built on part of building complex. 'Lu' built in building complex such like Sa-chal, Hyang-gyo, Seo-won, Jae-sil, has the similar characters. 1. It is built by taking slope site. 2. Ii is one of four buildings that forms court yard. 3. It uses simple building structure on the purpose of openness 4. It can control view with using window. The column type of 'Lu' can be classified with 3 style. These are $5{\times}2$ Kan style, $3{\times}2$ Kan style and $5{\times}3$ Kan style. It would be assumed with the result of study that $5{\times}2$ Kan style has its origin in Hoe-Rang structure, $3{\times}2$ Kan style is originated from Joong-Moon(middle gate) structure, and $5{\times}3$ Kan is originated from Kang-Dang structure.

A Study on the Production of Wood Members and the Estimation of Raw Woods at the Government Managed Building Construction in the Late Chosun Dynasty (조선후기(朝鮮後期) 관영건축공사(官營建築工事)의 목부재(木部材) 생산(生産)과 물양산정(物量算定)에 관한 연구)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.10 no.1 s.25
    • /
    • pp.25-40
    • /
    • 2001
  • Since the 17th century, the society of Chosun Dynasty belonged to a period of rapid transition in many fields. As the building is a result produced on the basis of a society and economy, the general transition in a society is to be reflected into a process of building construction. Therefore an understanding or estimate of a building can be guaranteed by research of a process of building construction. Economic base factors in its process consist of material, cost, manpower, and operation system, etc. to be committed to the construction. On the premise, this paper is to examine the production of wood members and the calculation of the amount of raw woods in a process of woodwork in the construction of the government managed buildings in the late of Chosun dynasty. Construction reports, job slips, written estimates, and other documents in those days are examined for the study. To classify raw woods according to a standard size was aimed to a material management appropriately to apply each them to building size or its member size. The way to select a list of raw woods applicable to each member size, and to calculate the amount of the demanded wood was much more improved with 'Injungjeon-yeongkweon' in the year 1805 at the turning point than 'Hwaseong-seongyuk' in the year 1796. The improvement of material management brought to overcome a shortage of the amount supplied from forest preserve, and to a rationalization of building construction.

  • PDF

A Study on the Government Office Building of Chongju Castle in the Late Yi-dynasty (청주읍성(淸州邑城) 관아공해고 - 규모(規模) 및 위치(位置) 추정(推定)을 중심(中心)으로 -)

  • Kim, Dong-Sik;Kim, Tai-Young
    • Journal of architectural history
    • /
    • v.8 no.1 s.18
    • /
    • pp.41-52
    • /
    • 1999
  • This study aims to infer the plan and location of the government office building in Chongju Castle in the Late Yi-dynasty. The conclusion is as follows: 1. The Chongju Castle Map(淸州邑城圖, late in the 18th century, hereinafter referred to CCM) provides the detail arrangement and location of Government Office Building in Chongju Castle. And the road structure and plan of the CCM is almost same with the present time. 2. As compared with CCM and a Chongju-land Registration Map(淸州面地籍原圖, 1913, CRM) to infer the location of the traditional government office building in Chongju Castle, the building locations of Gaek-Sa(客舍) Donghun(東軒)'s region in CCM are almost accordance with today's. But those of Byungyoung(兵營) Group's region are represented by a little error. So the locations of Byungyoung(兵營) Group's region rearranged, moved down to be in accordance with the approach circulation of Main Gate(閉門樓) which is shown in CRM. 3. The records, on the plan of the traditional government office building in Chongju Castle, have proved that the plan of Gaek-Sa was a width of 11 bay and a depth of 2 bay. A width of 3 bay drawn in CCM, the present plan of Donghun is a width of 7 bay and a depth of 4 bay. The main building and especially the double-storied Main Gate($4{\times}3$) of Byungyoung Group are exactly in keeping with the present road structure.

  • PDF

The Origin of the architectural form embodied in ChongMyo's Main Building in the Early Chosen Dynasty (선초(鮮初) 종묘(宗廟) 정전(正殿) 창건형식의 기원(起源))

  • Jung, Ghi-Chul
    • Journal of architectural history
    • /
    • v.8 no.2 s.19
    • /
    • pp.9-32
    • /
    • 1999
  • In order to reveal the source of the architectural norm embodied in the first built-form of ChongMyo's Main Building, three analytic types were introduced into research. According to the level of accepting the architectural form of ChongMyo in the Koryo Dynasty, these types were defined by 'newly interpreted form', 'newly introduced form', and 'coventionally accepted form'. Among the first built-form in ChongMyo's Main Building, the form of 'TaeSil' was newly interpreted on the basis of the Tang's realating norm, and the form of 'HyupSil' was newly introduced according to the contemporary trend that had increasingly regarded it as an indispensible form. But the form of 'IkSil' had the different source, that is, the architectural form of ChongMyo in the Koryo Dynasty. After reconstructed by the King ChungSun, that form had been sustained without any change until the end of Koryo Dynasty. In result, that form had been accepted conventionally at the first time of building ChongMyo in the ChoSon dynasty.

  • PDF

Seismic evaluation of RC stepped building frames using improved pushover analysis

  • Sarkar, Pradip;Prasad, A. Meher;Menon, Devdas
    • Earthquakes and Structures
    • /
    • v.10 no.4
    • /
    • pp.913-938
    • /
    • 2016
  • 'Stepped building' frames, with vertical geometric irregularity, are now increasingly encountered in modern urban constructions. This paper proposes a new approach to determine the lateral load pattern, considering the contributions from the higher modes, suitable for pushover analysis of stepped buildings. Also, a modification to the displacement coefficient method of ASCE/SEI 41-13 is proposed, based on nonlinear time history analysis of 78 stepped frames. When the newly proposed load pattern is combined with the modified displacement coefficient method, the target displacement for the stepped building frame is found to match consistently the displacement demand given by the time history analysis.

Performance-Based Seismic Design for High-Rise Buildings in Japan

  • Nakai, Masayoshi;Koshika, Norihide;Kawano, Kenichi;Hirakawa, Kiyoaki;Wada, Akira
    • International Journal of High-Rise Buildings
    • /
    • v.1 no.3
    • /
    • pp.155-167
    • /
    • 2012
  • This paper introduces the outlines of review and approval processes, general criteria and usual practices taken in Japan for the seismic design of high-rise buildings. The structural calculations are based on time-history analyses followed by performance evaluations. This paper also introduces structural design of two high-rise buildings: one is a 100 m high reinforced concrete residential building, and the other is a 300 m high steel building for mixed use.

Updating of FE models of an instrumented G+9 RC building using measured data from strong motion and ambient vibration survey

  • Singh, J.P.;Agarwal, Pankaj;Kumar, Ashok;Thakkar, S.K.
    • Earthquakes and Structures
    • /
    • v.4 no.3
    • /
    • pp.325-339
    • /
    • 2013
  • A number of structural and modal parameters are derived from the strong motion records of an instrumented G + 9 storeyed RC building during Bhuj earthquake, 26 Jan. 2001 in India. Some of the extracted parameters are peak floor accelerations, storey drift and modal characteristics. Modal parameters of the building are also compared with the values obtained from ambient vibration survey of the instrumented building after the occurrence of earthquake. These parameters are further used for calibrating the accuracy of fixed-base Finite Element (FE) models considering structural and non-structural elements. Some conclusions are drawn based on theoretical and experimental results obtained from strong motion records and time history analysis of FE models. An important outcome of the study is that strong motion peak acceleration profile in two horizontal directions is close to FE model in which masonry infill walls are modeled.