The purpose of this research is to evaluate the health performance of existing buildings which completed green remodeling using the WELL Building Standard developed by Delos in the USA. The features and the level of improvement in health were examined and the results were as follows. As a result of comprehensive evaluation of the health performance of the target building, the health performance after green remodeling improvement was improved by 17.3% compared to before green remodeling. As a result of applying the alternatives for improving health performance, improvements were 22.9% by Alternative 1, 28.8% by Alternative 2, and 28.7% by Alternative 3. If the improvement ratio with respect to the construction cost were compared, Alternative 1 was the best followed by Alternative 2. Finally, the cost effectiveness of improving health performance against construction cost were best in the order of self-closing door installation, airtight seal, and pest inspections.
Park, Wonyoung;Kang, Tai-Kyung;Baek, Seung-Ho;Lee, Yoo-Sub
한국건축시공학회지
/
제12권6호
/
pp.624-635
/
2012
Construction projects, including housing, are carried out over long periods of time. According to changes to the construction period, the cost of input materials and wages also changes. Therefore appropriate management is important in order to minimize cost risks caused by fluctuations in prices. In Korea, housing units are usually sold in lots prior to construction completion. Therefore, careful management of input elements such as materials and equipment that are sensitive to price fluctuations is very important. This study deals with how the price fluctuation of materials, labor, and equipment influences the change of housing cost and seeks a way for cost management through identifying key resources sensitive to price fluctuation. As a result, a change to the housing cost index multiplies depending on cost changes of materials and labor together. Labor costs are a major factor on the housing cost index. In addition, certain types of materials and labor input to housing construction greatly influence price fluctuations. Thus, it is found that managing those main cost factors is the key for effective cost management.
Rapid prototyping (RP) technologies have been widely used to reduce the lead-time and development cost of new products. $VLM-_{ST}$ process has been developed to overcome the currently developed RP technologies such as a large building time, a high building cost, an additional post-processing and a large apparatus cost. $VLM-_{ST}$ process requires an additional human interaction due to the manual stacking and bonding. Hence, building time, building cost and the part quality are dependent on the skill of labor. A novel RP process, fully automated $VLM-_{ST}$ process ($VLM-_{ST}$), has been developed to improve building efficiency of the process and the human dependency of the part. The objective of this work is to propose a $VLM-_{ST}$ process and to develop an apparatus for implementation of the process. $VLM-_{ST}$ process and its apparatus have various technical novelties such as two step cutting using a rotating table, an automatic stacking method using two pilot holes and two reference shapes, a concept of automatic unit shape layer (AUSL), and an automatic bonding using the bonding roller and building magazine. In order to examine the efficiency and the applicability of the proposed process, various three-dimensional shapes, such as a piston, a human head shape and a human bust shape, were fabricated on the apparatus.
Journal of Construction Engineering and Project Management
/
제4권1호
/
pp.8-14
/
2014
The Construction industry in Yemen confronts many development constraints, such as the inadequate implementation of appropriate building materials and labour construction technologies. Thus, this research looks over building materials and labour construction technologies used on the local housing construction projects by verifying the percentage of construction expenditure consumed by the main construction components (Materials, Labour and Overhead and Profit), along with the implemented construction technologies. The paper conducts a survey to acquire the cost distribution of the construction main components. The outcomes of the survey were discussed; the discussion was supported by literature on similar issues from some countries. The outcomes confirmed the relatively limited percentage in labour cost and profit, and the elevated percentage of construction materials cost, which are because of the excessive and inappropriate use of materials. What's more, established that the excessively redundant unskilled labours are not effectively engaged in the construction activities, this is due to the tendency of the market in using labour-base technologies. This paper is to recommend a suitable policies and strategies has to be used to decrease cost by using efficiently appropriate construction practice and local materials, moreover take advantage of excessive labour to reduce unemployment.
The Guangzhou International Finance Centre (IFC) is a landmark building that symbolizes the emerging international strength of Guangzhou, China's third largest city. It is also one of the dual iconic towers along the main axis of Guangzhou Zhujiang New Town. Arup adopted a total engineering approach in embracing sustainability and aiming at high efficiency solutions based on performance-based design principles covering structures, building services, fire engineering, vertical transportation, and façade performance to constitute an efficient and cost-effective overall building design. Through dynamic integration of architectural and engineering principles, Guangzhou IFC represents a pioneering supertall building in China. It adopts a diagrid exoskeleton structural form that is clearly expressed through the building's façade and gives the building its distinctive character. The aerodynamic shape of the building not only presents the aesthetic quality of elegant simplicity, but also reduces the effects of wind, thereby reducing the size and weight of the structure. State-of-the-art advanced engineering methods, such as optimization techniques and nonlinear finite element modelling, were applied in parallel with large-scale experimental programs to achieve an efficient and high-performance design taking into account the constructability and cost-effectiveness for a project of this scale.
The 6th International Conference on Construction Engineering and Project Management
/
pp.523-526
/
2015
In recent years, building commissioning has often been part of a standard delivery practice in construction, particularly in the high-performance green building market, to ensure the building is designed and constructed per owner's requirements. Commissioning, therefore, intends to provide quality assurance that buildings perform as intended by the design and often helps achieve energy savings. Commissioning, however, is not as widely adopted as its potential benefits are perceived. Owners are still skeptical of the cost-effectiveness claims by energy management and commissioning professionals. One of the issues in the current commissioning practice is that not every project is guaranteed to benefit from the commissioning services. This, coupled with its added cost, the commissioning service is not acquired with great acceptance and confidence by building owners. To overcome this issue, this paper presents a unique methodology to enhance owner's predicting capability of the degree of success of commissioning service using the Bayesian theorem. The paper analyzes a situation where a future building owner wants to use a pre-commissioning in an attempt to refine the success rate of the future commissioned building performance. The author proposes the Bayesian theorem based framework to improve the current commissioning practice where building owners are not given accurate information how much successful their projects are going to be in terms of energy savings from the commissioning service. What should be provided to the building owners who consider their buildings to be commissioned is that they need some indicators how likely their projects benefit from the commissioning process. Based on this, the owners can make better informed decisions whether or not they acquire a commissioning service.
현장의 안전사고율을 낮추려는 지속적인 노력에도 불구하고 여전히 건설산업은 치명적인 사고율이 높은 고위험군으로 분류된다. 건설 안전사고율을 낮추기 위한 방법 중 하나로 설계 단계에서 안전위해요소를 관리하는 DFS(Design for safety)를 적용하고 있다. 그러나 설계자의 제한된 지식 때문에 설계 결과가 건설, 운영 및 유지보수와 같은 project lifecycle 동안 어떤 위험을 초래하는지 설계자는 인식하지 못하는 경우가 많다. 만일 설계자가 건물의 형상이 안전사고율에 미치는 영향과 이에 대응하는 안전관리비에 미치는 영향을 이해한다면, 효과적인 DFS를 진행할 수 있다. 안전관리비중 가장 많은 비중을 차지하는 낙하방지 그물망, 안전 펜스와 같은 안전시설비는 동일 건축면적이라 하더라도 건물의 형상에 따라 달라질 것이다. 본 연구의 목적은 건물의 외주길이가 안전관리비에 미치는 영향을 분석하는 것이다. 아파트(apartment building)를 대상으로 건물의 외주길이가 안전관리비에 미치는 영향을 분석한다. 본 연구를 위해 21개의 프로젝트 데이터를 수집한 후 외주길이와 건물형상계수, 건축면적을 독립변수로 안전관리비를 종속변수로 분석한다. 그 결과 외주길이와 안전관리비의 상관관계는 R2가 0.876, 형상계수와 안전관리비의 상관관계는 R2가 0.801, 건축면적과 안전관리비의 상관관계는 R2가 0.792로 매우 밀접한 관계가 있는 것으로 분석되었다.
Journal of Construction Engineering and Project Management
/
제5권3호
/
pp.1-9
/
2015
Project cost is an important concern in any construction project. Although there has been a lot of studies on factors affecting the cost of construction projects, there seems no consensus as what cost factors have direct influence on the cost of civil engineering projects. This study therefore aims to bridge the current knowledge gap by examining quantity surveyors' perception of the factor structure among nineteen costing attributes identified based on literature review. Questionnaire was used to elicit responses from quantity surveyors working in the Hong Kong construction industry. Principal component analysis is conducted to extract the factor structure of the cost attributes and the attributes are grouped into three factor components, namely the contract management factor, the project management factor and the monetary value factor. Understanding these cost impact factors could be crucial in managing civil engineering projects, since it allows the project stakeholders and quantity surveyors to take precautionary steps to identify the cost management problems and areas for improvement and could even help to avoid cost deviations in engineering projects.
This paper discusses the estimation of construction cost of high fluidity concrete using segregation reducing type superplasicizer with 350kgf/cm2 of design strength and 60$\pm$5cm of slump flow in order to verify the cost down effect of high fluidity concrete compared with that of plain concrete with 350kgf/cm2 of design strength and 18cm of slump and with 210kgf/cm2 of design strength and 15cm of slump. According to research, under same strength levels, although material cost of high fluidity concrete is somewhat higher than that of plain concrete due to segregation reducing type superplasticizer, labor cost and equipment cost of high fluidity concrete is cheaper than that of plain concrete. However, based on the strength differences, high fluidity concrete shows lower material cost, labor cost and equipment cost than that of plain concrete due to decreasing in size of member and re-bar caused by high strength development of concrete.
건축공사의 공사비 절감은 시공단계보다 사업초기단계 및 설계단계에서 정확한 공사비 예측을 함으로써 더욱 효율적으로 절감될 수 있다. 하지만 현행 공공 건설공사의 공사비 산정 및 관리는 실시설계 이후로 집중되어 있어, 계산견적을 중심으로 실시되는 기획 및 기본설계단계에서의 사업비관리는 매우 취약하다고 볼 수 있다. 이에 본 연구에서는 현행 공사비 산정 방법의 문제점 및 실적공사비 사례정보 분석하여 기본설계단계에서 구체적 비용 계획을 세우고 이에 부합되는 설계가 진행되는지 검토 가능한 공사비 산정모델 개발을 위한 예비적 연구를 수행하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.