Browse > Article
http://dx.doi.org/10.21022/IJHRB.2016.5.4.49

Engineering of Guangzhou International Finance Centre  

Kwok, Michael (Arup, Huaihai Plaza)
Lee, Alexis (Arup, Huaihai Plaza)
Publication Information
International Journal of High-Rise Buildings / v.6, no.1, 2017 , pp. 49-72 More about this Journal
Abstract
The Guangzhou International Finance Centre (IFC) is a landmark building that symbolizes the emerging international strength of Guangzhou, China's third largest city. It is also one of the dual iconic towers along the main axis of Guangzhou Zhujiang New Town. Arup adopted a total engineering approach in embracing sustainability and aiming at high efficiency solutions based on performance-based design principles covering structures, building services, fire engineering, vertical transportation, and façade performance to constitute an efficient and cost-effective overall building design. Through dynamic integration of architectural and engineering principles, Guangzhou IFC represents a pioneering supertall building in China. It adopts a diagrid exoskeleton structural form that is clearly expressed through the building's façade and gives the building its distinctive character. The aerodynamic shape of the building not only presents the aesthetic quality of elegant simplicity, but also reduces the effects of wind, thereby reducing the size and weight of the structure. State-of-the-art advanced engineering methods, such as optimization techniques and nonlinear finite element modelling, were applied in parallel with large-scale experimental programs to achieve an efficient and high-performance design taking into account the constructability and cost-effectiveness for a project of this scale.
Keywords
Super-tall building; Diagrid; Sustainability; Optimisation; Nonlinear analysis;
Citations & Related Records
연도 인용수 순위
  • Reference
1 GB 50011:2010. (2010). Code for seismic design of buildings.
2 Moon, K. S. (2008). Sustainable structural engineering strategies for tall buildings. The Structural Design of Tall and Special Buildings, 17, pp. 895-914.   DOI
3 Shen, Z. Y., Wang, W., and Chen Y. Y. (2009). Recent development and applications of tubular structures in China. Proceedings of the 12th International Symposium on Tubular Structures, Shanghai, China, 8-10 October 2008, pp. 305-312.
4 Alostaz, Y. M. and Schneider, S. P. (1996). Connections to concrete-filled steel tubes. Structural Engineering Series 613. University of Illinois at Urbana-Champaign.
5 Fam, A., Qie, F. S., and Rizkalla, S. (2004). Concrete-filled steel tubes subjected to axial compression and lateral cyclic loads. ASCE Journal of Structural Engineering, 130(4), pp. 631-640.   DOI
6 Wilkinson, C. (2012). Guangzhou Finance Centre: An elegant simplicity of form. Proceedings of the CTBUH 9th World Congress, Shanghai, China, 19-21 September 2012, pp. 386-390.
7 Mele, E., Toreno, M., Brandonisio, G., and de Luca, A. (2014). Diagrid structures for tall buildings: case studies and design considerations. The Structural Design of Tall and Special Buildings, 23, pp. 124-145.   DOI