• Title/Summary/Keyword: Building Block Costing

Search Result 4, Processing Time 0.018 seconds

Hospital Costing Applied to Building Block Costing Methods Research (Building Block Costing 방법을 적용한 종합병원 원가계산 적용 방안 연구)

  • Kim, Young-Cheol;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.4
    • /
    • pp.91-97
    • /
    • 2016
  • Hospital costing has generally been using ABC costing method. However, based on increase of expensive equipment, the fixed cost is increased in the hospital industry. The most common equipment industry are using building block costing method for depreciation and equipment management costing elements. Additionally it presents three options that may be considered to be supported by the IT system to find the most appropriate alternative.

Methodology to Estimate the Cost of Network Facilities with ABC and its Application (ABC를 활용한 통신 설비 원가 산정 방법론 및 활용 방안)

  • Yoon, Bong-Kyoo;Yang, Won-Seok
    • IE interfaces
    • /
    • v.20 no.3
    • /
    • pp.395-406
    • /
    • 2007
  • In the telecommunication industry, estimation of the cost of network facilities is very important since depreciation cost of the facilities accounts for a large portion of the product cost. Moreover, cost estimation in the industry becomes more difficult because of increasing indirect cost upon digital convergence, expanding multi-purpose facilities, complexity of service product, etc. Nevertheless, not much seem to have been done in improving estimation methodology of the cost of network facilities. As a result, the quality of cost information on network facilities has deteriorated, and now even decision-makers in the industry dismiss the information. Recently, two major telecommunication companies adopted a new network cost estimation method to deal with the issue. In this paper, we study the concept of new cost estimation method and the procedure to develop and apply it. We also suggest the method to carry out the cost allocation using Matlab which is more efficient and time-saving than other commercial cost calculation packages.

A Case Study on Telco ERP Costing Module Implementation for Network Costing and Cost Reduction (통신기업 ERP 원가모듈 구축 사례: 네트워크 원가계산 및 원가절감을 중심으로)

  • Park, Joon-Ho;Kang, Byung-Min;Kim, Bum-Joon
    • Information Systems Review
    • /
    • v.11 no.2
    • /
    • pp.169-182
    • /
    • 2009
  • Due to natural oligopolistic industry characteristics and huge influences on national and home economy, Telco Industry is regarded as a regulated industry. Thus, telco companies, including CATV, prepare not only management accounting reports for internal use but also regulatory accounting reports to be submitted to the regulatory agency. For telco companies, smooth integration of these financial, managerial and regulatory reporting requirements with legacies such as billing system, network operating systems is important to achieve operational efficiency and overall competency. This research studies telco ERP cost module implementation in order to provide theoretical and practical guidance for integrated information system. Especially, case analysis focuses on cost reduction and network costing implementation that involves Building Block Costing methodologies.

A Study on the Welding Amount Estimation System combined with 3D CAD Tool (3차원 CAD 통합형 용접물량 산출 시스템에 관한 연구)

  • Ruy, Won-Sun;Kim, Ho-Kyeong;Ko, Dae-Eun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.7
    • /
    • pp.3184-3190
    • /
    • 2013
  • These days, the great part of design processes in the field of ship or offshore manufacturing are planed and implemented using the customized CAD system for each ship-building companies. It means that all information for design and production could be extracted and reused at the useful other area cost considerable time and efforts. The representative example is the estimation of welding length and material amount which is demanded during the construction of ship or offshore structures. The proper estimation of welding material to be used and the usage of them at the stage of schedule planning is mostly important to achieve the seamless process of production and expect the costing in advance. This study is related to the calculation of welding length and needed material amount at the stage of design complete utilizing the CAD system. The calculated amount are classified according to welding position, stage, block, bevel and welding type. Moreover it is possible to predict the working time for welding operation and could be used efficiently for the cost management using the results of this research.