• Title/Summary/Keyword: Building Automation

Search Result 495, Processing Time 0.025 seconds

Development of Automation Technology for Structural Members Quantity Calculation through 2D Drawing Recognition (2D 도면 인식을 통한 부재 물량 산출 자동화 기술 개발)

  • Sunwoo, Hyo-Bin;Choi, Go-Hoon;Heo, Seok-Jae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.227-228
    • /
    • 2022
  • In order to achieve the goal of cost management, which is one of the three major management goals of building production, this paper introduces an approximate cost estimating automation technology in the design stage as the importance of predicting construction costs increases. BIM is used for accurate estimating, and the quantity of structural members and finishing materials is calculated by creating a 3D model of the actual building. However, only 2D basic design drawings are provided when making an estimating. Therefore, for accurate quantity calculation, digitization of 2D drawings is required. Therefore, this research calculates the quantity of concrete structural members by calculating the area for the recognition area through 2D drawing recognition technology incorporating computer vision. It is judged that the development technology of this research can be used as an important decision-making tool when predicting the construction cost in the design stage. In addition, it is expected that 3D modeling automation and 3D structural analysis will be possible through the digitization of 2D drawings.

  • PDF

Propose to Modeling standard for automation quantity take-off of BIM-based (BIM 기반 물량산출 자동화를 위한 모델링의 기준제시)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.143-144
    • /
    • 2011
  • Recently the construction project is intricately linked to the between participants. it is because construction informations are not integrate. This study suggests 3D modeling standard for integrated construction information. These suggestions can be useful to automation quantity take-off.

  • PDF

A Technical Analysis of Real Time Location System for Automation in Construction (건설작업 자동화를 위한 실시간위치추적시스템 분석)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.15-18
    • /
    • 2009
  • Due to its high dependency of manpower, construction work has several difficulties in terms of quality control, imbalance of supply and demand of qualified manpower, safety management for them and improvement of production. Such problems related to the management can be at some degree solved by introducing an automation facility. Since the unique environment of a construction site in the past was not structured, it is very hard to introduce a facility to automate construction work from operation of the equipment to assignment of where to work. This is a preliminary research for automation of construction work. In this study, the trend of development of a cutting-edge technology, RTLS, was researched and analyzed in order to review the possibility of utilizing RTLS in construction work and present a control mechanism for construction equipment. Although the presented mechanism is at the concept stage, which still has lots of restrictions to be solved, the application of the RTLS will be very much feasible. That is, if linkage of the study between the RTLS and the automation of construction is built, it will be expected to contribute to many fields such as cost reduction through efficient and systemic management, the reduction of construction period and precise construction as well as raising the level of the automation of domestic construction work.

  • PDF

A Study on Grounding Technology for the Reduction of Electric Surge in IBS Building (IBS 빌딩에서의 서어지 저감을 위한 접지방안 연구)

  • 박중양;김학련;최규형
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.87-92
    • /
    • 2003
  • According to the realization of highly information dependent society, the recent building system is developed into the concept of suitable for management of intellegent work, which is demanded to unify of IBS(Intelligent Building System), IC(information communication), OA(office automation), BA(building automation) system and computer technology. However inspite of the presence arrester, cable shielding, insulated TR, filter, earth etc., in the IBS building for the cope with several surge and noise has several problems from the wrong operation of the equipment which caused from several surge, damage of equipment, and noise etc. And the miss operation caused by wrong earth works, which must be considered at first during the building construction. In order to minimize these problems, it's necessary that various earth project are performed effectively, and bonding methods between the mutual wiring of earth system and the equipments in the building should be improved sucessively. So in this paper, we analyze present domestic conditions of the earth technology in IBS building, and propose minimization method for the various surge and noise problem, and examine and analyze through the applied works.

  • PDF

A Novel Design of the Distributed Fire Alarm Control System by Developing Intelligent Control Modules with LonTalk Protocol (지능형제어기를 이용한 분산 방계시스템에 관한 연구)

  • 홍원표;이승학
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2001.11a
    • /
    • pp.157-162
    • /
    • 2001
  • There are many economic and operational reasons to integrate fire alarm signaling system with other building automation system. Integration of this requires communication standard and careful design practices. The important point for this is also the development of intelligent control modules for replacing the conventional zone adapter in fire system. Therefore, this paper proposes an new conceptual design of the distributed fire alarm signaling system and a new intelligent control modules with LonTalk protocol. Newly proposed additions to LonWorks network make it very well suited for integrating fire systems with other building automation systems. Additionally, it is very important that best design practices, test procedures and building codes need to be modernized to accommodate Integrated building systems.

  • PDF

Application of the Robot for Curtain Wall Installation in a High Building (고층 빌딩 커튼월 시공 작업에서의 로봇 활용에 관한 연구)

  • Lee, Soung-Yel;Ko, Bong-Soo;Lee, Kye-Young;Lee, Sang-Heon;Ohk, Young-Mu;Han, Chang-Soo
    • Proceedings of the KSME Conference
    • /
    • 2003.11a
    • /
    • pp.1488-1493
    • /
    • 2003
  • Recently, higher and bigger building is trend of the construction. Accordingly the building material is getting bigger and construction equipments are developed. But operation is still depends on human resource. Therefore there have several problems that are safety, laborious operation, and shortage of worker. In the various construction sites, the automation in construction is introduced to solve these problems. This paper proposed the automation system in construction that installs curtain wall in a high building. The system is expected effects that are reduction of a construction period, retrenchment of the cost and assurance of safety.

  • PDF

An automaticity indicator computation and a factory automation procedure (자동화 지표 계산 및 공장자동화 순서 결정을 위한 방법)

  • Cho, Hyun-Bo;Jeong, Ki-Yong;Lee, In-Bom;Joo, Jae-Koo;Lee, Joo-Kang;Jeon, Jong-Hag
    • IE interfaces
    • /
    • v.10 no.1
    • /
    • pp.209-222
    • /
    • 1997
  • The paper provides a methodology to obtain the automaticity indicator of a factory and the sequence of enabling technologies of factory automation. The automaticity indicator is the measure of the current automation status of a factory and can be used as a crucial criteria for the future automation schedule and investment. Although most industries have their own computation methods which usually consider the number of workers in the shop floor, this research covers five evaluation items of automation, such as, production facility, material transfer system, inspection and test system, information system, and flexibility. The detailed evaluation models are developed for each item. Automation sequencing prioritizes the enabling technologies of factory automation on the basis of several criteria which consist of two phases. The first phase includes the automation indicator and the second phase includes six sub-criteria such as production rate, quality, number of workers, capital investment, development duration, development difficulty. For this evaluation, AHP(Analytical Hierarchy Process) is introduced to prevent the decision maker's subject intention. As results of the automaticity indicator and automation sequence, the manager can save time and cost in building constructive and transparent automation plans.

  • PDF