• 제목/요약/키워드: BuilderHUB

검색결과 3건 처리시간 0.021초

BIM 모델 활용을 통한 초기설계단계에서의 효율적인 철근물량 산출 방안 연구 (A Study on the Effective Calculation of Rebar QTO in the Early Design Phase through the Application of BIM Model)

  • 이재철
    • 대한건축학회논문집:구조계
    • /
    • 제35권5호
    • /
    • pp.145-152
    • /
    • 2019
  • In this study, rebar QTO(Quantity Take-Off) was quickly produced from the BIM model prepared by Revit in the early design phase, and the available premium rates were quantitatively presented. For this purpose, the amount of rebar calculated using the BuilderHub, which specializes in calculating rebar QTO, was analyzed according to various factors such as member type, rebar diameter, building size, item type, and order length, and the effect of each factor on the rebar QTO was determined. In addition, the BIM model generated on Revit was used to establish parameters and processes required to produce rebar QTO, and proposed a rebar premium rate and a stirrup/hoop premium rate based on the BuilderHub output results. Through this study, it is expected that a rapid and efficient comparative evaluation of rebar QTO will be possible according to various structural design alternatives in the early design phase.

BIM기반 초기 설계 단계 철근 물량 산출 프로세스 구축 (Establishment of Rebar Quantity Estimation in BIM-based Initial Design Phase)

  • 송치호;김치경;이시은;최현철
    • 한국전산구조공학회논문집
    • /
    • 제29권5호
    • /
    • pp.447-454
    • /
    • 2016
  • 최근에 각광받고 있는 3D BIM기반 철근 물량 산출 현황을 살펴보면 상용 BIM 도구들이 철근 모델링 기능을 제공하지만 그 기능을 이용해서 철근을 모델링하려고 하면 방대한 양의 모델링 시간이 소요가 되어 현재 실용적으로 사용할 수 있는 BIM 소프트웨어는 없다. 본 연구에서는 BIM 기반 설계 현업에서 실용적인 철근 물량 산출 프로세스를 정리 및 제시하고, 초기설계단계의 단면 정보가 없는 상태에서 기존의 2D방식에 비하여 보다 정확하게 기동, 보, 슬래브, 벽체의 철근 단면 정보를 자동으로 배근해주는 프로그램인 Rebar Automatic Arrangement Program(이하 RAAP)을 개발하였다. 본 연구 결과는 건설프로젝트의 초기 설계단계에서 설계 진행상 구조 부재 단면 설계가 완료되지 않은 상태의 골조 물량 산출 시 적은 노력으로 기존의 2D기반 방식보다 신뢰성을 향상시킨 물량을 산출할 수 있는 기술로 발전시키는데 의미가 있으며, 합리적인 초기 설계단계의 물량 산출 프로그램을 구축할 수 있는 기초 연구로서 활용될 수 있을 것으로 기대된다.