Improvement Factors of Promoter Selection Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 평가기준 개선 요인 분석)

  • Shin, Hyun-In;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.310-316
    • /
    • 2006
  • Since 'Act on Private Participation in Infrastructure' were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation in Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of Promoter. However, score for cost is likely to influence selecting Promoter to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for selecting Promoter in BTL projects, and proposed improvement factors by doing questionnaire over specialists of each field.

  • PDF

How to Fiscally Manage the BTL Type Project (BTL(Build Transfer Lease) 사업의 재정관리 방향 -국가부채 여부에 대한 판단기준 및 재정 측면에서의 관리방안을 중심으로-)

  • Choi, Seok Joon
    • KDI Journal of Economic Policy
    • /
    • v.29 no.1
    • /
    • pp.137-175
    • /
    • 2007
  • This paper studies the fiscal issues with regard to BTL (Build Transfer Lease) scheme projects, a newly introduced type of PPPs (Public Private Partnerships) in 2005 and tries to provide some policy options. More specifically, we make suggestions to work out the issues such as how to account for BTL transactions and whether to introduce annual budget ceiling system for BTL payment, while we introduce and analyze the experiences of some other advanced countries and international institutes.

On Analysis of Undertaking Accomplishment Process for the BTL Project (BTL사업의 사업수행 절차 분석에 관한 연구)

  • Chun, Jin-Ku;Lim, Jong-Ah;Park, Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.917-920
    • /
    • 2007
  • Private companies will get back their investment by leasing facilities to the government, Since act on private participation in infrastructure were changed in January 2005, BTL(Build Transfer Lease) project of introduced in the domestic construction market for the purpose of providing public facilities with the public. BTL projects is for with approximately project life cycle form plan to maintenance the success of the project totally depends on the capability and role of concessionaire. Accordingly, this study is aimed to improve in order to proceed with BTL project efficiently, a clear standard for the item of evaluation was presented.

  • PDF

Improvement of Concessionaire Designation Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 선정 평가기준개선에 관한 연구)

  • Shin, Hyun-In;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.121-131
    • /
    • 2006
  • Since "Act on Private Participation in Infrastructure" were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation In Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of concessionaire. However, score for cost is likely to influence designating concessionaire to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for designating concessionaire in BTL projects, and proposed improvement program by doing questionnaire over specialists of each field.

AN EFFECT ANLYSIS OF RISK FACTORS FOR BUILD TRANSFER LEASE PROJECTS

  • Yang-Woo Lee;Soo-Yong Kim; Jung-Man Jung;Dae-Young Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.498-508
    • /
    • 2007
  • The Build-Transfer-Lease (BTL) projects have rapidly increased under the Government support during recent years. This paper presents the risk analysis of factors affecting BTL projects in the initial phase. This study resulted in 10 significant risk factors influencing on each phase of BTL projects and then factors were grouped into each phase. The sensitivity analysis was also performed to identify risk factors with more significant influence on BTL projects. The results may useful to practitioners in order to cope with risks in initial phase of BTL projects. The paper resulted in the distribution of risks to project parties, thus it can be used as standards for risk assignment to competent authorities and private enterprises of BTL projects.

  • PDF

Promotion of the Private Investments in the Military Facilities through Integration of BTL and BTO Methods (BTL방식과 BTO방식을 혼합한 군시설 민간 투자사업의 활성화 방안의 연구)

  • Kwak, Soo-Nam;Park, Sang-Hyuk;Han, Seung-Heon;Kim, Hyoung-Kwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.278-283
    • /
    • 2006
  • Koran Government introduced BTL(Build-Transfer-Lease) to provide convenience through early supplying infrastructure and plans to invest 8,315million dollar to 84 projects of 15 BTL type involving official residence and railroad. But some of construction company hates to invest BTL projects because of its low earning rate. In addition if we correctively apply project which partly has profitability to BTL, the earnning rate declines more seriously. So this paper presents BTL+BTO model which operates BTL in the non-profitable parts to improve convenience of users and BTO in the profitable parts to improve earning rate. BTL+BTO model based on operate period was presented and its suitability was confirmed by applting 00 region official residence project.

  • PDF

A Risk Quantification of Public Sector Comparator in the Financial Analysis of the BTL (Build-Transfer-Lease) Scheme of Railway Projects: a Case Study of the Haman-Jinju Link (철도 BTL 민자적격성조사의 위험계량화방안 연구)

  • Jang, Su-Eun;Gang, Ji-Hye
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.5 s.91
    • /
    • pp.67-74
    • /
    • 2006
  • This paper proposes a way to a risk quantification of public sector comparator in the value-for-money test of the BTL (Build-Transfer-Lease) scheme in rail investment projects. Two principal risks that are project delay and budget increasing costs are identified and are empirically quantified with a case study of the Haman-Jinju link. The methodology suggested is expected to be a good reference for the similar research afterwards and also to help in settling down the scheme that is only an early stage.

An Improvement Method through Build-Transfer-Lease (BTL) Problem Analysis from the Special Purpose Company (SPC) Perspective (SPC 관점에서의 BTL사업 문제점 분석을 통한 개선방법)

  • Kim, Soo-Yong;Son, Myung-Chan;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.167-175
    • /
    • 2013
  • In 2005, the government introduced BTL(Build-Transfer-Lease) projects as one of the methods of private investment in infrastructure. In a BTL project, a private company builds a public facility and leases it to the government to withdraw its invested capital. But there appear several problems with it due to a short period of preparation and lack of experiences. Specifically, private companies that plan to participate in this project have to take a risk since serious problems are likely to take place because of unrealistic estimation of construction costs, etc., and they finally avoid participating in this project. A case study was made over advanced countries, Japan and the United Kingdom, to find out how to resolve the problems, and rational 7 improvement method were presented from a perspective of Special Purpose Company (SPC), which could be accepted by both of SPC and government agencies. The findings of the study are expected to provide workable solutions to BTL projects from a standpoint of private companies to facilitate the rational improvement of BTL projects, and this study is ultimately expected to stimulate the active participation of SPC to make a contribution to the vitalization of domestic BTL projects.

The Evaluation of Value at Risk in Build Transfer Lease Project (민간투자사업의 위험가치 평가 - 임대형 민간투자사업(BTL)의 위험가치 평가 제도를 중심으로 -)

  • Choi, Seok-Joon;Kim, Sang-Sin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2907-2916
    • /
    • 2009
  • PPPs(Public Private Partnerships) in Korea was introduced in 1990s, which mainly used for providing transportation facilities such as railroad and high-way. Since 2005, a service delivery type PPPs, in other words BTL(Build Transfer Lease) has been implemented, which focused on social infra-structure including school, military housing, and sewage facilities. According to previous literature, efficient risk evaluation and management is the key factor for successful PPPs in the UK and Australia. However, Korea doesn't have proper risk evaluation system for PPP type project. In this paper, we explore and analyze risk evaluation system of PPPs in Korea and other countries. Also, we apply empirical methodology used in the UK to a BTL project and set up a new PSC(Public Sector Comparator) with risk evaluation.

Efficient Evaluation Method of Operation Cost for Wastewater Treatment Plant by BTL Contract Type (하수처리시설 BTL사업의 합리적인 운영비 산정방안)

  • Kang, Leen Seok;Yoon, Sun MI;Kwon, Joong Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.627-634
    • /
    • 2009
  • The BTL (Build-Transfer-Lease) contract of construction project serves as a part for early establishment of industrial foundation for social overhead capital. However, project cost of BTL contract is focused on initial construction cost. Accordingly, operation cost is lowly evaluated because there is no standard criterion for estimating maintenance cost for the facility. The low operation cost can be a factor that reduces service quality of facility operation. This study suggests a resonable method for estimating cost and manpower in the operation phase by using the existing practical data for wastewater treatment plant by BTL contract. The results of the study can be used for evaluating rough operation cost and manpower of similar plant project by facility size.