• Title/Summary/Keyword: Build Time

Search Result 1,855, Processing Time 0.03 seconds

Project Performance Comparison Based on Different Types of Project Delivery System (사례연구 분석을 통한 발주방식별 성과비교)

  • Lee, Soo-Kyong;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

Chloride Diffusion Coefficient from NT BUILD 443 (NT BUILD 443에 의한 염소이온 확산계수 고찰)

  • Kim, Ki-Hyun;Cha, Soo-Won;Jang, Sung-Yup
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.295-296
    • /
    • 2009
  • It is often the case with the durability design to use diffusion coefficient obtained from experimental test. From the analytic solution considering the starting time of exposure, it is confirmed that the diffusion coefficient from NT BUILD 443 underestimates real reference value.

  • PDF

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

Development of Build-up Printed Circuit Board Manufacturing Process Using Rapid Prototyping Technology and Screen Printing Technology (쾌속조형과 스크린 인쇄기술을 이용한 빌드업인쇄회로기판의 제조공정기술개발)

  • 조병희;정해도;정해원
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.17 no.2
    • /
    • pp.130-136
    • /
    • 2000
  • Generally, the build-up printed circuit board manufactured by the sequential process with etching, plating, drilling etc. requires many types of equipments and lead time. Etching process is suitable for mass production, however, it is not adequate for manufacturing prototype in the developing stage. In this study, we introduce a screen printing technology to prototyping a build-up printed circuit board. As for the material, photo/thermal curable resin and conductive paste are used for the formation of dielectric and conductor. The build-up structure is made by subsequent processes such as the formation of liquid resin thin layer, the solidification by UV/IR light, and via filling with conductive paste. By use of photo curable resin, productivity is greatly enhanced compared with thermal curable resin. Finally, the basic concept and the possibility of build-up printed circuit board prototyping are proposed in comparison with to the conventional process.

  • PDF

Selection of Build Orientation for Reducing Surface Roughness with Stereolithography Parts (광조형물의 표면 거칠기 저감을 위한 성형방향의 선정)

  • 안대건;김호찬;이석희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.137-140
    • /
    • 1997
  • In general, stereolithography parts is not suitable for master pattern. Because of its bad surface roughness. Therefore, To reduce roughness it requires post-process that is depending on user skill and takes long time to do. This study aims to develop an expert system which can select an optimal build orientation, reduce roughness and shorten post-processing time. Genetic Algorithm was introduced for optimization. A simplified computation model was developed for real-time response. For accurate roughness estimation, mterpolation of experimental data was implemented.

  • PDF

Minimization of Post-processing area for Stereolithography Parts by Selection of Part Orientation (부품방향의 선정을 통한 광조형물의 후가공면적 최소화)

  • Kim, Ho-Chan;Lee, Seok-Hee
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.26 no.11
    • /
    • pp.2409-2414
    • /
    • 2002
  • The surfaces of prototypes become rough due to the stair-stepping which is the inevitable phenomenon in the Rapid Prototypes are not used only for the verification of feature. The grinding, coating, or the composition of them is a main operation in post-processing in which lots of costs and long build time are needed. The solution is proposed to increase the efficiency of rapid prototyping by minimizing or removing the composition of them is a main operation in post-processing in which lots of costs and long build time are needed. the solution is proposed to increase the efficiency of rapid prototyping by minimizing or removing the regions for post-processing. the factors to cause the surface roughness and their effects are analyzed through the experiments. Software modules are developed to predict the surface roughness of each face in the prototyping with the result. An experimental compensation method is developed to apply the modules to various RP equipments, materials and build styles. The build direction is searched with use of genetic algorithm to maximize the total areas of the surface of which roughness is better than the user-defined value.

Build-up Phenomenon and Self-Cleaning Effect upon Wire Electrode Surface of an Electrolytic Ozone Generator in Tap Water (수 분해형 오존발생장치의 전극선 비대현상과 자기회복 현상)

  • Moon, Jae-Duk;Kim, Yong
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.40 no.6
    • /
    • pp.626-629
    • /
    • 1991
  • The negative wire of an electrolytic ozone generator, proposed by authors, has been contaminated by attaching the impurity particulate in tap water, which is called BUILD-UP phenomenon. The higher applied voltage and the larger wire diameter have shown the higher build-up rate, which makes the current reducing largely and concurrently the ozone production smaller. It is found that the positive electrode of the ozone generator has a strong SELF-CLEANING effect by detaching the impurity particulate from its surface, which, however, is used us a novel means of solving the build-up problem. As a result, the build-up problem can be solved effectively by applying an alternate square wave pulse voltage to the electrodes so as to get the self-cleaning ability on the both electrodes during each of the half pulse duration time.

  • PDF

Optimization of Build Parameters in SLS Process (SLS의 공정 파라미터 최적화에 관한 연구)

  • Heo, Seong-Min;O, Do-Geun;Choe, Gyeong-Hyeon;Lee, Seok-Hui
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.24 no.3 s.174
    • /
    • pp.769-776
    • /
    • 2000
  • RP(Rapid Prototyping) technology is gaining its popularity in building a prototype in all industries. SLS(Slective Laser Sintering) is one of RP technologies, which is focused on tooling processes as well as three dimension solid model. There are several factors, the length and the cross-sectional area of a part, that have an effect on build setup in SLS process. In this paper, the computation on geometrical relationship is used to slice STL file and to estimate these factors. Based on these values, the build setup parameters such as the heating temperature, the laser power, and the powder cartridge feed rate are determined by neural network approaches. The test results show that the computation time is saved and the neural network approach is able to apply to get the optimal parameters of build process within an acceptable error rate.

The Synchronization Method for Build Small World (Small World 구축을 위한 동기화 기법)

  • 배영철;구영덕
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2004.05b
    • /
    • pp.701-704
    • /
    • 2004
  • In this paper, we proposed that the synchronization method for build small world. In order to build a small world, we used Chua's oscillator which well represent the chaos dynamics and composed several stage with Chua's oscillator by using coupled synchronization method. This paper shows a synchronization result in the small world network using coupled synchronization method. Not only time series and phase plane are implemented but also degree of synchronization in the small world network is presented.

  • PDF

An Approach to Recommending of Solutions for Resolving Gradle Build Error (Gradle 빌드 오류 해결을 위한 솔루션 추천 방안)

  • Kang, Mingu;Kim, Taeyoung;Kim, Suntae;Ryu, Duksan
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.6
    • /
    • pp.33-39
    • /
    • 2020
  • Developers spend considerable time manually repairing code that was not built during project construction. If the build fails, it is necessary to understand the failed execution, identify the cause of the failure, and then implement the solution. Build tools such as Gradle have been developed to reduce this effort and automate project construction. However, build tools still do not solve many errors, requiring developers to try to solve build errors. In this study, we propose a solution recommendation method to increase the success rate of Gradle build and reduce the effort required to resolve errors. We provide a way to collect build errors and a way to transition from build error messages to successful builds. In particular, 296 build error messages collected from Github's Java project are classified as solutions, and 89% show that the solution can be applied.