• 제목/요약/키워드: Budget execution

검색결과 99건 처리시간 0.028초

국방핵심기술 연구개발 사업의 평가 시스템 개선에 관한 연구 (The Study on Improvement of Evaluation System for National Defense Core Technology R&D Projects)

  • 김찬수;조규갑
    • 기술혁신연구
    • /
    • 제15권1호
    • /
    • pp.87-113
    • /
    • 2007
  • For the realization of the national self-defense, the trend of the defense R&D projects becomes global and diverse with the increase of their budget. Thus, for the effective execution of the budget and the successful performance of the projects, the importance of selection, management and evaluation of the R&D projects is emphasized. This study suggests the applicability of a meta-evaluation model for the realization of the successful defense R&D project evaluation system. This study focused on the development of the meta-evaluation model design which can be applicable to the national defense R&D projects. Using the proposed meta-evaluation model, we propose a technique to enhance the fairness and the reliability of the national defense R&D projects evaluation system.

  • PDF

아산시 재정.설계 심사제도 도입과 성과 (A Study of the operation and performance on the execution of Budgeting & Planning Examination Program)

  • 유선종;김성규
    • 한국디지털정책학회:학술대회논문집
    • /
    • 한국디지털정책학회 2007년도 춘계학술대회
    • /
    • pp.69-78
    • /
    • 2007
  • Since 2005, Asan city government have executed the "Budgeting & Planning Examination Program". A construction contract more than two hundred thousand dollars, service contract more than fifty thousand dollars and purchasing goods contract more than five thousand dollars must be examined about their propriety by office of audit. Asan city government have saved its budget about fifteen million and five hundred twenty thousand dollars for the institution. Moreover, Asan citizens' trust and social capital about their local government have been increased through it Asan city government will reinforce a speed and effectiveness of it.

  • PDF

전력구 설치 공사의 안전관리비 계상 기준에 관한 연구 (Safety Management Cost Accounting for Underground Electric Power Transmission Facility Construction)

  • 김민호;신성우
    • 한국안전학회지
    • /
    • 제37권6호
    • /
    • pp.50-59
    • /
    • 2022
  • In the Construction Technology Promotion Act (CTPA) of the Republic of Korea, safety management cost is enforced as a statutory cost that must be included in the budget of construction projects. However, the construction of underground electric power transmission facilities (UEPTFs) is not included in the category of construction works defined in the CTPA. Consequently, the statutory safety management cost does not apply to the construction of UEPTFs. To overcome this limitation, the clients of UEPTF construction projects generally provide internal guidelines enabling the addition of the safety management cost in the project budget. Nevertheless, even after the execution of the internal guidelines, some important cost items are omitted from the budget owing to the incompleteness of the guidelines. In this context, this paper proposes a complete set of accounting items and their calculation methods for appropriate budgeting of the safety management cost of UEPTF construction projects. To this end, the current budgeting method of the safety management cost of UEPTF construction projects is analyzed, and a questionnaire study is performed to confirm the necessary cost items and their appropriate calculation methods. Based on the results of the questionnaire study, a set of accounting items and their calculation criteria for the budgeting of the safety management cost of UEPTF construction projects are proposed.

PMO 대가 산정모형의 개발 (A Study on the Development of PMO Cost Estimation Model)

  • 서용원;이덕희
    • 한국IT서비스학회지
    • /
    • 제13권4호
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

컴퓨터${\cdot}$소프트웨어 개발시의 완성시간에 관한 연구 (A Study on the Completion Time of Computer Software Development)

  • 김중환;김성식
    • 한국국방경영분석학회지
    • /
    • 제9권1호
    • /
    • pp.63-68
    • /
    • 1983
  • The ideal way of eliminating errors in a large scale software system is to test the software with all possible inputs, providing sufficiently large amount of execution time. However, in practice, the test must be performed within given budget and time limits. Therefore, to perform the test under given constraints, we have to properly select inputs and determine the execution time for each selected inputs. This paper studies the distribution of number of errors at a given time as well as the distribution of time required to reduce the number of errors to a certain level. We assumed that error occurrence times are distributed exponentially (not necessarily identical) and the number of errors at the initial stage is known or estimable.

  • PDF

친환경양식어업육성 민간보조사업의 활성화 방안 (A Study on the Revitalization of the Private Subsidy for Environmentally Friendly Aquaculture)

  • 김국주
    • 수산경영론집
    • /
    • 제50권4호
    • /
    • pp.45-57
    • /
    • 2019
  • Effective implementation of private subsidy projects requires comprehensive expertise in the aquaculture and construction sectors to be provided to private subsidy operators, local government officials and others involved in budget execution and settlement. Due to the strengthening of laws and systems related to the execution of state subsidies since 2015, the efficient implementation of private-sector grant projects has been difficult for delays in projects, cancellations, and conflicts with local governments from lack of prior awareness and understanding of related regulations. It is expected that the government will be able to activate the project by analyzing the current status and problems of each phase of project implementation for improving quality internalization of the project effects, as well as quantitative growth of the private sector subsidy project for environmentally friendly aquaculture development projects.

프로세스 마이닝을 이용한 군수품 계약업무 분석 : 공군 군수사 계약업무를 중심으로 (Analysis of Munitions Contract Work Using Process Mining)

  • 주용선;김수환
    • 지능정보연구
    • /
    • 제28권4호
    • /
    • pp.41-59
    • /
    • 2022
  • 군수물자의 적기 조달은 군의 작전능력 유지를 위해서 필수적이며, 계약업무는 적기 조달을 위한 첫 단추라고 할 수 있다. 또한 신속한 계약체결은 수요자의 여유로운 납기설정을 가능케 하며, 예산 집행의 가능성을 높여주기 때문에 예산의 조기집행과 이·불용 방지를 위해서도 계약 프로세스 개선이 필수적이다. 최근 빅데이터를 이용한 연구가 여러 분야에서 활발히 진행되고 있으며, 빅데이터를 이용한 프로세스 분석 및 개선 기법인 프로세스 마이닝 역시 민간에서 널리 활용되고 있다. 하지만 군 내 계약업무에 대한 분석은 업무 담당자의 경험과 단편적인 정보를 활용한 이·불용 문제사례별 원인 파악 및 대응적 모색과 같은 개별적 분석수준에 그치고 있다. 본 연구는 계약 프로세스 개선을 위해 공군 군수사령부 재정처가 2019년 11월부터 약 1년간 직접 계약한 총 560건의 계약업무에 관한 데이터를 가지고 프로세스 마이닝 기법을 이용하여 분석하였다. 분산된 데이터를 종합하여 프로세스 맵을 도출하고, 프로세스의 흐름, 수행시간 분석, 병목 분석 및 추가 세부분석을 실시했다. 분석결과 다수 계약 건에서 의뢰 후 재검토/수정이 반복 발생하고 있음을 발견할 수 있었다. 반복적인 재검토/수정은 원가계산 완료까지의 소요일수 지연에 크게 영향을 미치고 있으며, 이는 병목 지점 시각화를 통해서도 명확하게 드러났다. 재검토/수정은 계약의뢰가 많은 상위 5개 부서에서 60% 이상 발생하고, 의뢰가 집중되는 상반기에 주로 발생하는데 이는 소요부서의 계약의뢰 전 면밀한 사전검토가 필요함을 의미한다. 그리고 재정처의 계약업무는 법령에 따른 절차대로 수행되고 있었으나, 일부 업무의 순서조정이 필요함을 알 수 있었다. 본 연구는 군 내 계약업무 분석에 프로세스 마이닝을 이용한 첫 사례이다. 이를 기반으로 프로세스 마이닝을 군대 내 다양한 업무에 적용하기 위한 연구가 더욱 수행된다면, 각종 업무의 효율화를 이끌어 낼 수 있을 것으로 기대한다.

대학 평가개선을 위한 예산 최적화 배분 Model 연구 (A Study of Model on the Optimal Allocation of Budget for the Efficiency of the University Evaluation)

  • 최범순;임왕규
    • 한국컴퓨터정보학회논문지
    • /
    • 제18권7호
    • /
    • pp.165-174
    • /
    • 2013
  • 최근 대학 위기론은 실로 엄청나게 사회적 파장까지 불러 일으켜 등록금 반값시대, 입학생 감소, 대학간 M&A 등 심각한 상태에 직면해 있다. 설마 교육의 상아탑인 대학이 이렇게 까지 오리라고는 아무도 상상도 하지 못했다. 이러한 대내외적인 환경의 위기극복을 위해 대학은 사회적 요구 부응과 교육의 질과 내실 있는 향상을 통하여 교육 수준을 고양시키는 대학 교육의 혁신을 꾀하고 있다. 이 혁신을 위해 대학에서는 예산절감을 꾀하고 동시에 대학간 우위를 점하고자 평가를 매년 실시하고 있다. 그리나 이러한 대학의 혁신은 교육 재정 확보 없이는 한계를 가질 수밖에 없다. 또한 대학 평가에 소요되는 예산은 재정구조의 개선과 대학의 발전에 직 간접적으로 지대하게 작용하고 있다. 대학평가와 예산의 상호 관련성을 분석하여 최적화 예산배분이 되도록 예산 절감과 평가 개선에 효과적인 모델로 의사결정방법을 모색하고자 한다. 따라서 본 논문에서는 이러한 대학 평가와 소요예산 배분의 최적화 의사결정을 수리모형인 선형계획법을 통하여 평가 및 예산배분 모형개발을 구현해 보고자 한다.

Static Worst-Case Energy and Lifetime Estimation of Wireless Sensor Networks

  • Liu, Yu;Zhang, Wei;Akkaya, Kemal
    • Journal of Computing Science and Engineering
    • /
    • 제4권2호
    • /
    • pp.128-152
    • /
    • 2010
  • With the advance of computer and communication technologies, wireless sensor networks (WSNs) are increasingly used in many aspects of our daily life. However, since the battery lifetime of WSN nodes is restricted, the WSN lifetime is also limited. Therefore, it is crucial to determine this limited lifetime in advance for preventing service interruptions in critical applications. This paper proposes a feasible static analysis approach to estimating the worstcase lifetime of a WSN. Assuming known routes with a given sensor network topology and SMAC as the underlying MAC protocol, we statically estimate the lifetime of each sensor node with a fixed initial energy budget. These estimations are then compared with the results obtained through simulation which run with the same energy budget on each node. Experimental results of our research on TinyOS applications indicate that our approach can safely and accurately estimate worst-case lifetime of the WSN. To the best of our knowledge, our work is the first one to estimate the worst-case lifetime of WSNs through a static analysis method.

대학병원 예산시스템의 특성이 예산슬랙에 미치는 영향 (The Effect of University Hospital Budgeting System Characteristics on Budgetary Slack)

  • 정태영;이서준;한재훈
    • 한국산학기술학회논문지
    • /
    • 제19권2호
    • /
    • pp.405-412
    • /
    • 2018
  • 예산은 조직성과의 체계적 관리와 조직상황을 진단하는데 중요한 관리도구이다. 병원은 비영리 조직으로서, 효율적인 예산집행이 중요하지만 현재 국내에는 병원의 예산슬랙에 관한 연구가 부족한 실정이다. 이에 본 연구가 수행되었다. 본 연구의 목적은 병원 예산시스템의 특성이 예산슬랙에 미치는 영향을 규명하는 것이다. 본 연구의 자료는 서울 소재 일개 대학병원의 예산 담당자 118명을 대상으로 자기기입식 설문조사를 시행하였다. 본 자료수집 기간은 2015년 7월 14일부터 7월 22일까지이다. 설문에 응답한 데이터는 STATA 14.0을 이용하여 빈도분석, 상관분석 및 회귀분석을 시행하였다. 연구결과 예산시스템의 특성 중 정보비대칭은 예산슬랙을 유의하게 증가시켰다. 반면에 예산 피드백과 예산 동기부여는 예산슬랙을 유의하게 감소시키는 것으로 나타났다. 본 연구결과 병원 직원 간 예산관련 정보의 원활한 공유가 효율적인 병원경영을 위해 중요하며, 예산슬랙을 체계적으로 관리하기 위해 예산행위에 있어서 예산피드백과 동기부여를 강화하는 것이 필요한 것으로 나타났다. 본 연구는 병원 예산슬랙 영향요인에 관한 연구가 부족한 상황에서, 예산슬랙 연구에 대한 관심을 환기시키고 국내 의료기관들의 경영 효율성을 향상시키는데 실증적인 기초자료를 제공해 줄 수 있을 것으로 사료된다.