• Title/Summary/Keyword: Budget calculation

Search Result 88, Processing Time 0.02 seconds

Improved Initial Costs Expectation Model based on FPA for Internet Banking System (인터넷 뱅킹 시스템을 위한 개선된 FP 기반 초기 규모 예측 모델)

  • Yun, Gwang Yeul;Yoo, Hae Young
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.4
    • /
    • pp.139-148
    • /
    • 2014
  • With the development of IT, the financial sector has grown dramatically in Non face-to-face channel. However, because the initial costs calculation model which reflects the characteristics of the financial system does not exist, deteriorating reliability of budget establishment and low-price booking competition appeared. This negative situation leads to degradation of Internet Banking systems and customers who use these financial products have many troubles. Therefore, this paper improves the Initial Costs Expectation Model based on FPA & Expert Judgement Model. And it verified the effectiveness of this model through the regression analysis. As a result, we developed the Initial Costs Expectation Model for Internet Banking systems based on FPA, which is increased in accuracy than existing Cost Expectation Models.

Proper Estimating Method for Environmental Preservation Cost in Road Projects (도로공사 환경보전비의 적정 산출 방안)

  • Park, Ji-Sun;Lee, Sea-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.3-10
    • /
    • 2012
  • The current enforcement regulation of "Construction Technology Management Act" prescribes calculation standard of environmental preservation cost in construction site. According to this standard, environmental preservation cost is calculated by using the quantity-per-unit costing method or applied fixed rate on direct cost. However, when calculated by using the quantity-per-unit costing method it is few items to put in the budget according to standard of construction estimate and in the case of using the fixed rate on direct cost it is not considering various characteristics of the construction site. Therefore, it is needed a improvement plan of estimating method and management system for environmental preservation cost. In this study, it surveyed the actual state of the environmental preservation cost according to magnitude of project, site location, anti-pollution facilities and etc. over 38 road projects. The research reported in this paper environmental preservation cost was variously distributed over construction sites. Thus it needs to estimating method and management system to consider characteristics of construction site for environmental preservation cost.

Analysis of C/N Variation of Ku Band Satellite Beacon Receiver According to Rain Attenuation (강우 감쇠에 따른 Ku 대역 위성 비콘 수신기 C/N 변화 해석)

  • Park, Dae-Kil;Lee, Kyung-Soon;Koo, Kyung Heon
    • Journal of Advanced Navigation Technology
    • /
    • v.22 no.5
    • /
    • pp.415-419
    • /
    • 2018
  • This paper predicts and measures the C/N ratio of a beacon signal transmitted from geostationary orbit satellite KorSat 5A ($113^{\circ}E$) at a ground station located in Kimpo. Based on the ground stations, we compared the rain attenuation of the zone K of ITU-R and the rain attenuation which analyzed the domestic weather information. In ITU-R, the Korean rainfall characteristics are classified into zone K, but forecasting the rainfall intensity and attenuation of three adjacent cities based on the cumulative rainfall data per minute from 2013 to 2017. The calculation of rainfall path and attenuation is based on ITU-R recommendations. The change of the C/N according to the rainfall amount was confirmed through the 2 week satellite beacon signal C/N measurement. The predicted critical C/N was decreased to 12 dB at $A_{0.3}$. During the experiment, it was confirmed that it decreased up to 8 dB according to the concentrated rainfall.

Analysis of the Hydraulic Behaviour in the Nearshore Zone by a Numerical Model (수치모형에 의한 연안해역 해수운동의 분석)

  • Lee, Hee-Young;Jeoung, Sun-Kil
    • Water for future
    • /
    • v.27 no.2
    • /
    • pp.73-83
    • /
    • 1994
  • The unproper development of the nearshore zone can enhance the diffusion of pollutant in the nearshore zone resulting in unbalanced sediment budget of beach which causes alteration of beach topography. Therefore, it is required to predict the effects of the envirnmental change quantitatively. In this paper, the depth-averaged and time-averaged energy balance equation is selected to acount for the wave transformation such as refraction, shoaling effect, the surf zone energy disipation, wave breaking index and bore, due to wave breaking in the shore region.(Numerical solutions are obtained by a finite difference method, ADI and Upwind. For the calculation of the wave-induced current, the unsteady nonlinear depth-averaged and time-averaged governing equation is derived based on the continuity and momentum equation for imcompressible fluid.) Numerical solutions are obtained by finite difference method considering influences of factors such as lateral mixing coefficient, bed shear stress, wave direction angle, wave steepness, wave period and bottom slope. The model is applied to the computation of wave transformation, wave-induced current and variation of mean water leel on a uniformly sloping beach.

  • PDF

Analysis of Priority Investments for Preventing Roadside Slope Failures (도로비탈면 투자우선순위 결정에 관한 연구)

  • Kim, Seung-Hyun;Kim, Hong-Gyun;Oak, Young-Suk;Lee, Jong-Hyun;Koo, Ho-Bon
    • The Journal of Engineering Geology
    • /
    • v.23 no.3
    • /
    • pp.257-269
    • /
    • 2013
  • Prevention plans for landslide and slope disasters should be appropriate for a country's budget when considering a systematic investment plan. The systematic management of slopes adjacent to national highways should incorporate reasonable investment risk and the expected degree of damage should be calculated by considering the investment priorities. In terms of priority of investment, the major factors used to determine the degree of hazard are gradient, soil characteristics, RMR (Rock Mass Rating), stability interpretation, type of discontinuities, and history of collapse, among others. The likely consequences of slope failure can be determined by considering traffic volume, the number of lanes, and average vehicle risk. We performed such calculations regarding the priority of investment and performed a regression analysis for 392 slopes located in Yeongseo region, Gangwon province. The calculation results show that collapsed slopes have a higher priority for investment, as do slopes with a high proportion of dangerous sections and locations in valleys.

Analysis on Characteristic of Construction Cost for Steel Box Bridge (강박스교량 공사비 특성 분석)

  • Sun, Chang Won;Kyung, Kab Soo;Kang, Shin Hwa;Kwon, Soon Cheol
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.1
    • /
    • pp.1-14
    • /
    • 2009
  • Estimating appropriate construction cost at the design phase is judged with one important issue to the efficient security and the execution of budget. Therefore, in this paper, to build fundamental data of appropriate construction cost for steel box bridges, the existing calculated document such as the quantity, unit price document and detail items etc.. was analyzed and the basic specification of the bridges was investigated. Also, by estimating the relationship between predetermined cost and construction items on the bridges, the paper is intended to produce basic data for the calculation of appropriate construction cost in planning phase. From the result, it was calculated ratio of construction item in the total construction cost and unit cost. And then it was deduced effect factor of construction cost in steel box bridge.

Improving Transmission in Association with the Distance for Military Microwave Communications (군 MicroWave 통신 환경에서의 링크 거리를 고려한 전송 성능 향상 기법)

  • Youn, Jong Taek;Lim, Young Gap;Kim, Young Ho
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.39C no.11
    • /
    • pp.1042-1049
    • /
    • 2014
  • In Military MicroWave communication, the distance of link, availability, transmission capacity is the important point in order to design the circuit. Currently, operated by fixed modulation, in the future it will be evolved to the modulation techniques enabled to increase the transmission capacity. It would be hard to consistently guarantee the transmission quality of the high-availability because the occurrence probability of fading increase in terms of the link distance for the case of the long distance. In the case of the modulation techniques for the transmission of high-capacity, as the distance is long, a falling-off in the fade margin from the link budget analysis cause the decrease in the availability. It is difficult to provide QoS guaranteed connection. In this paper, we propose the performance improvement technique of transmission by the variable allocation of the bandwidth and the higher priority transmission technique using setting the ratio of the higher priority capacity in association with the distance of link. Also we suggest the alternative of the calculation for channel transmission capacity to design the circuit.

A Study on the Causes and Cost analysis of Maintenance and Repair work in the University Facilities (대학시설(大學施設)의 유지보수공사(維持補修工事) 발생요인(發生要因)과 비용분석(費用分析) 연구(硏究))

  • Lee, Gyoo-Joo;Lee, Soo-Yong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.9 no.3
    • /
    • pp.5-12
    • /
    • 2002
  • This study attempts to suggest a standard for maintenance and repair cost per each unit area, by analyzing the causes and cost of various maintenance and repair work in the university facilities. The result of my study on the data of maintenance and repair work for 12 years between 1990 and 2001 in the two campuses of the university that I selected for my case study is the following. (1) The yearly average for maintenance and repair cost in the facilities of the university with 67 old and new buildings for the past 12 years was $W4,422/m^2$. In addition, the repair cost based on the calculation of the degree of decrepitude of the buildings was $W10,291/m^2$. (2) The number of causes of maintenance and repair work increase steadily every year, due to the development of universities and changes in the educational environment. A special case like a university merger also appears, which also demands maintenance and repair work of university facilities. (3) It is important that a budget for interior maintenance is increased or added to an extent, in order to minimize the maintenance and repair cost of the university facilities, and to cope with changing educational environments flexibly. (4) The publication of a white paper that includes the planning of a building, construction process, and changes in design, seems to be required for the sake of users' convenience and efficient maintenance and repair work.

An Experience Type Virtual Reality Training System for CT(Computerized Tomography) Operations (컴퓨터 단층 촬영기(CT)의 가상 실습을 위한 3차원 체험형 교육 시스템)

  • Shin, Yong-Min;Kim, Young-Ho;Kim, Byung-Ki
    • The KIPS Transactions:PartD
    • /
    • v.14D no.5
    • /
    • pp.501-508
    • /
    • 2007
  • Simulation system was introduced and used a lot in the fields of aviation, vessel, and medical treatment. 3D Simulation system has been used quite insufficiently as it requires a lot of system resource and huge amount of computer calculation. As the graphic card performance and simulation function developed, however, PC based simulation has been activated and is verified of its possibility as an educational software. However, educational institutions need to invest huge amount of budget and manpower to purchase and maintain CT Equipment. For such a reason, educational institutions entrust their students to hospitals for indirect experience of operation or for mere observation. This study, therefore, developed a CT Virtual reality education system with which medical CT Equipment can be directly operated in PC based 3D Virtual environment.

Improvement Plan for Calculation of Financial Contributions to Treatment of Waste Electrical and Electronic Equipments (폐전기·전자제품 처리에 대한 분담금 산정의 개선방안)

  • Kim, Han-Soo;Kim, Dae-Bong
    • Resources Recycling
    • /
    • v.29 no.4
    • /
    • pp.45-50
    • /
    • 2020
  • Producer and distributor of electrical and electronic equipment may directly collect waste electrical and electronic equipment that falls under the class to which the equipment they distributed belongs, or may join KERC(Korea Electronic Recycling Cooperative) and have KERC fulfill the duty to collect on behalf. In this study, the system of calculating the financial contributions is reviewed, and then the defined problems and improvement plan are proposed. First, the standard operation and time should be set for collection and transportation costs, taking into account the operation by collection type. Second, since there is a difference in the screening method of the recycling center, the standard cost for the allocation factor should be set by reflecting the difference in these methods and the characteristics of the product line being processed. Third, it is necessary to secure a budget of sufficient size by determining the median or average value rather than the minimum value in the forecast model for visit collection. This study is suggesting in that it examines the problems of the allotted contributions paid by the mutual aid members to KERC and suggests ways to improve them.