• Title/Summary/Keyword: Buckling Stability

Search Result 505, Processing Time 0.025 seconds

Structural Stability of Temporary Facility System using High-Strength Steel Pipes Based on Abnormal Behavior Parameters (이상거동 변수 기반 고강도 강관 가시설 시스템의 구조 안정성)

  • Lee, Jin-Woo;Noh, Myung-Hyun;Lee, Sang-Youl
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.1
    • /
    • pp.1-12
    • /
    • 2019
  • This study defined abnormal behaviors such as bending deformations or buckling behaviors occurred in high strength steel pipe strut system, and carried out a full-scale bending test for different connection types. A parametric study was carried out to gain an insight about structural performances considering abnormal behavior effects in high strength steel pipe strut system. Five abnormal behaviors were considered as undesirable deflections of strut structures, which are basic load combination, excessive excavation situations, impact loading effects, additional overburden loads, load combinations, and strut lengths. Subsequent simulation results present various influences of parameters on structural performances of the strut system. Based on the results, we propose methods to prevent unusual behaviors of pipe-type strut structures made of high strength steels.

The Evaluation of Axial Stress in Continuous Welded Rails via Three-Dimensional Bridge-Track Interaction

  • Manovachirasan, Anaphat;Suthasupradit, Songsak;Choi, Jun-Hyeok;Kim, Bum-Joon;Kim, Ki-Du
    • International journal of steel structures
    • /
    • v.18 no.5
    • /
    • pp.1617-1630
    • /
    • 2018
  • The crucial differences between conventional rail with split-type connectors and continuous welded rails are axial stress in the longitudinal direction and stability, as well as other issues generated under the influence of loading effects. Longitudinal stresses generated in continuously welded rails on railway bridges are strongly influenced by the nonlinear behavior of the supporting system comprising sleepers and ballasts. Thus, the track structure interaction cannot be neglected. The rail-support system mentioned above has properties of non-uniform material distribution and uncertainty of construction quality. The linear elastic hypothesis therefore cannot correctly evaluate the stress distribution within the rails. The aim of this study is to apply the nonlinear finite element method using the nonlinear coupling interface between the track and structural model and to illustrate the welded rail behavior under the loading effect and uncertain factors of the ballast. Numerical results of nonlinear finite analysis with a three-dimensional solid and frame element model are presented for a typical track-bridge system. A composite plate girder, modeled by solid and shell elements, is also analyzed to consider the behavior of the welded rail. The analysis result showed buckling under the independent calculations of load cases, including 'temperature change', 'bending of the supporting structure', and 'braking' of the railway vehicle. A parametric study of the load combination method and the loading sequence is also included in this analysis.

Compressive Strength and Residual Stress Evaluation of Stub Columns Fabricated of High Strength Steel (고강도강재 단주의 압축강도 및 잔류응력 평가)

  • Lee, Cheol-Ho;Kim, Dae-Kyung;Han, Kyu-Hong;Kim, Jin-Ho;Lee, Seung-Eun;Ha, Tae-Hyu
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.1
    • /
    • pp.23-34
    • /
    • 2012
  • In this study, stub columns subjected to concentrical and eccentrical loads were tested to check the applicability of the current local stability criteria (KBC2009, AISC2005) to 800MPa high-strength steel (HSA800). The key test variables in the concentrically loaded tests included the plate-edge restraints and the width-to-thickness ratio normalized by the yield strength of steel. Specimens made of ordinary steel (SM490) were also tested for comparative purposes. Eccentrically loaded stub column tests were conducted for a range of the P-M combinations by controlling the loading eccentricity. All the concentrically loaded specimens with non-compact and slender sections developed sufficient strengths according to the current local stability criteria. All the eccentrically loaded specimens with non-compact H sections also exhibited a sufficient P-M interaction strength that was even higher than that of compact H- section counterparts. Residual stresses were also measured by using the non-destructive indentation method to demonstrate their dependency or independency on the steel material's yield strength. The measured results of this study also indicated that the magnitude of residual stresses bears no strong relation to the yield strength of the steel material.

Seismic Performance Enhancement of Exposed Column-base Plate Weak-axis Connections for Small-Sized Steel Buildings (소규모 철골조건축물을 위한 약축방향 노출형 주각부의 내진성능 향상)

  • You, Young-Chan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.5
    • /
    • pp.1-12
    • /
    • 2019
  • The purpose of this study is to enhance the seismic performance of exposed column-base plate weak-axis connections for small-sized steel buildings. According to the site inspection for the small-sized building construction, the arbitrary connection details in steel buildings have been applied at the job site, which is considered to be insufficient to guarantee structural safety and stability considering the increased seismic risk in Korea. Therefore, a series of test programs had been done to develop enhanced connection details in order to ensue the adequate seismic stability and safety of small-sized steel buildings. From the test results, It was found that the exposed column-base plate weak-axis connections commonly used in Korea shows very poor seismic behavior due to the "Rocking" phenomena caused by the residual plastic deformation of anchor bolts between anchor plate and concrete. A series of hysteretic tests for finding that solution were conducted to reduce the "Rocking" phenomena of the column-base plate connections, and local buckling of webs in H-column. Finally the enhanced stable seismic behavior was obtained by reinforcing at least 8 anchor bolts with good bonding strength and stiffeners to the webs in H-column.

A Study on Efficient Deconstruction of Supporters with Response Ratio (응답비를 고려한 효율적인 버팀보 해체방안에 관한연구)

  • Choi, Jung-Youl;Park, Sang-Wook;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.5
    • /
    • pp.469-475
    • /
    • 2022
  • As the recent structure construction is constructed as a large-scale and deep underground excavation in close proximity to the building, the installation of retaining wall and supporters (Struts) has become complicated, and the number of supporters to avoid interference of the structural slab has increased. This construction process becomes a factor that causes an increase in construction joints of a structure, leakage and an increase in wall cracks. In addition, this reduced the durability and workability of the structure and led to an increase in the construction period. This study planned to dismantle the two struts simultaneously as a plan to reduce the construction joints, and corrected the earth pressure by assuming the reaction force value by the initial earth pressure and the measured data as the response ratio. After recalculating the corrected earth pressure through the iterative trial method, it was verified by numerical analysis that simultaneous disassembly of the two struts was possible. As a result of numerical analysis applying the final corrected earth pressure, the measured value for the design reaction force was found to be up to 197%. It was analyzed that this was due to the effect of grouting on the ground and some underestimation of the ground characteristics during design. Based on the result of calculating the corrected earth pressure in consideration of the response ratio performed in this study, it was proved analytically that the improvement of the brace dismantling process is possible. In addition, it was considered that the overall construction period could be shortened by reducing cracks due to leakage and improving workability by reducing construction joints. However, to apply the proposed method of this study, it is judged that sufficient estimations are necessary as there are differences in ground conditions, temporary facilities, and reinforcement methods for each site.