• Title/Summary/Keyword: Bridges Management

Search Result 327, Processing Time 0.037 seconds

Studies on the Optimal Location of Retail Store Considering the Obstacle and the Obstacle-Overcoming Point

  • Minagawa, Kentaro;Sumiyoshi, Kazushi
    • Industrial Engineering and Management Systems
    • /
    • v.3 no.2
    • /
    • pp.129-133
    • /
    • 2004
  • Studies on the optimal location of retail store have been made in case of no obstacle(Minagawa etal. 1999). This paper deals with the location problem of retail store considering obstacles (e.g. rivers, railways, highways, etc.) and obstacle-overcoming points (e.g. bridges, railway crossings, zebra crossings, overpasses, etc.). We assume that (1) commercial goods dealt here are typically convenience goods, (2) the population is granted as potential demand, (3) the apparent demand is a function of the maximum migration length and the distance from the store to customers, (4) the scale of a store is same in every place and (5) there is no competitor. First, we construct the basic model of customers' behavior considering obstacles and obstacle-overcoming points. Analyzing the two dimensional model, the arbitrary force attracting customers is represented as a height of a cone where the retail store is located on the center. Second, we formulate the total demand of customers and determine the optimal location that maximizes the total demand. Finally, the properties of the optimal location are investigated by simulation.

The Development of Visual Inspection System for National Road Facility Maintenance Management (국도 시설물 유지관리를 위한 현장점검시스템 개발)

  • 주기범;김태학;박상근
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.72-77
    • /
    • 2003
  • Visual inspection works are very important part of facility maintenance and management life cycle as a step of creating base data for decision making and maintenance and repair. But currently, visual inspection works have been performed unefficiently and unreliably as works on hand, duplication of works, decisions of defect state, unutilization of inspection history, lack of professional and so on. In this research, we developed visual inspection system that processes inspection work efficiently and provides reliability of inspection output, as a target of bridges, tunnels, underground roadway on national road. We defined problems through visual inspection work analysis, examined the solutions and reflected to functional design of system. We will plan to utilize this system in HMCS(Highway Maintenance and Construction Service).

  • PDF

Internal Company Factors as Determining Variables for Improving Bank Lending

  • PRAWITASARI, Dian;KADARNINGSIH, Ana;MACHMUDDAH, Zaky;UD-DIN, Maaz
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.8
    • /
    • pp.205-212
    • /
    • 2020
  • This study seeks to examine the main factors, external and internal to the bank, that enhance bank lending. Bank lending is one of the connecting bridges in sustaining society. Internal factors consist of ROA, DPK, and CAR. External factors are economic growth and interest rate of Bank Indonesia. The population of this research consists of traditional commercial banks listed on the IDX over the 2014-2017 period. Samples were chosen by purposive sampling method. This study uses secondary data with 56 samples; data analysis uses multiple linear regression. The findings of the study show that internal factors have a greater impact on increasing bank lending than external factors. The main variable among internal factors that influences increase in bank lending is ROA. DPK is the internal factor with the smallest impact on increasing bank lending. The implication of the study is that determining the bank lending should take more account of CAR, DPK, ROA, BI interest rates, and economic growth in making decisions about the amount of lending. These variables can only have a slight effect on increasing lending, though. Besides, internal factors such as NPL, LDR or non-economic factors also need to be considered in channeling bank credit.

Preliminary Analysis on Artificial Intelligence-based Methodology for Selecting Repair and Rehabilitation Methods of Bridges (인공지능 기반의 교량 보수공법 선정 기술 개발을 위한 선행 분석)

  • Kim, Jonghyeob;Jung, In-Su;Yun, Won-Gun;Kim, Jung-Yeol;Park, In-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.861-872
    • /
    • 2021
  • An efficient cost management is important for the domestic social overhead capital(SOC) based on a long lifecycle after 30 years since completion. Maintenance in South Korea have had the restrictions of consistency and suitability of decision-making by the establishment of a budget plan based on the company estimate and repair and reinforcement methods determined by the inspection and diagnosis engineers' subjective determination for each facility. To resolve this issue, the Korea Institute of Civil Engineering and Building Technology is currently in development of a methodology to propose an optimum maintenance method according to the damage of components by artificial intelligence. This study has deduced the primary factors by analyzing information generated during bridge maintenance and management as a prior step for the development of technologies, and conducted a preliminary analysis to select the optimum artificial intelligence technology.

DEVELOPMENT OF IDEA HIERARCHY MODEL FOR IDEA GENERATION OF CONSTRUCTION VE

  • Jinkook Yang;Sungwoo Moon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.504-509
    • /
    • 2011
  • Recently, construction projects are very complicated and diverse such as high-rise buildings and big bridges, etc. These complicated projects call for a system which can effectively generate productive ideas and activities. Value Engineering (V.E.) activity within construction projects is a necessity for systematic design management and to improve construction ability. This need in the construction industry has required a regular implementation of VE into construction projects. For this reason; America, South Korea, and some other nations have adopted VE applications which control the baseline investments of the construction projects. The process of VE activity is a preferred system and a reasonable alternative. In particular, idea generation within these projects is an important stage in the VE job plan. In this study, VE idea patterns are extracted through best practice analysis from VE cases of road construction projects. Next, we suggest an idea hierarchy model to be used in conjunction with VE idea patterns. This model is supported by reasonable idea generation in VE activity of construction projects. Finally, this model could possibly be the outcome of successful VE results.

  • PDF

A depth-based Multi-view Super-Resolution Method Using Image Fusion and Blind Deblurring

  • Fan, Jun;Zeng, Xiangrong;Huangpeng, Qizi;Liu, Yan;Long, Xin;Feng, Jing;Zhou, Jinglun
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.10
    • /
    • pp.5129-5152
    • /
    • 2016
  • Multi-view super-resolution (MVSR) aims to estimate a high-resolution (HR) image from a set of low-resolution (LR) images that are captured from different viewpoints (typically by different cameras). MVSR is usually applied in camera array imaging. Given that MVSR is an ill-posed problem and is typically computationally costly, we super-resolve multi-view LR images of the original scene via image fusion (IF) and blind deblurring (BD). First, we reformulate the MVSR problem into two easier problems: an IF problem and a BD problem. We further solve the IF problem on the premise of calculating the depth map of the desired image ahead, and then solve the BD problem, in which the optimization problems with respect to the desired image and with respect to the unknown blur are efficiently addressed by the alternating direction method of multipliers (ADMM). Our approach bridges the gap between MVSR and BD, taking advantages of existing BD methods to address MVSR. Thus, this approach is appropriate for camera array imaging because the blur kernel is typically unknown in practice. Corresponding experimental results using real and synthetic images demonstrate the effectiveness of the proposed method.

Designing and Developing the Agricultural Information Management System of North Korea

  • Tao, Song;Kim, Kye-Hyun
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.239-244
    • /
    • 2005
  • In North Korea, there has been the considerable loss of human lives every yew due to the deficiency of foods. Thus, in order to reduce such damages, a research project should be launched to provide various information for cooperation with North Korean government, and to develop proper agricultural management system. Furthermore, based on the water resources information map generated by KOWACO (Korea Water Resources Corporation) and the environmental information system developed by MOE (Ministry of Environment), an agricultural information infrastructure of North Korea and a management system need to be effectively performed. Therefore, this research is mainly to develop the Agricultural Information Management System of North Korea (NKAIMS), which can collect, manage and analyze agricultural information and water resources utilization status of North Korea, and further support to make relevant decisions and establish the agricultural land-use plans. This research has three phases. The major outcome of the first phase is collecting the agricultural and water resources utilization data such as soils, rivers, streams, collective farms, etc., designing and building database, and developing integrated management system considering the users' requirements. The main work of the second phase is improving and reinforcing database such as adding the information of dams, land-over data, bridges, tunnels, satellite images, etc., inspecting and renewing such as importing detail attribute information of reservoirs, and improving system for more conveniently using. The third phase will be to supplement more useful functions such as statistic analysis, continually inspecting and improving database, and developing web-based system. The product of this research supports collecting and analyzing relevant data to facilitate easier agricultural activities and support effective decision making for food production in the preparation of unification. Moreover, through designing database considering sharing information and system expendability, it can support systematic data usability of agricultural information and save cost for data management.

  • PDF

Development of Reasoning System and Database for Construction Safety Management (건설안전관리 데이터베이스 및 추론 시스템 구축)

  • Chung Byoung-Hwa;Chung Young-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.49-57
    • /
    • 2002
  • This paper describes the second stage of the work aiming at proposing a reasonable risk management response system for construction safety. By means of questionnaires/interviews and two sample t-tests, significant risk factors are identified for three different conditions. Then a Case-Based Reasoning System is built for use at construction sites to simulate possible accidents. This Construction Management Reasoning System(CMRS) nay be used by safety managers at sites every day (or education and training of workers to prevent accidents. The case base built so far is limited to the construction of expressway bridges. There is much need for further research since the simulation of possible accidents is to be a good means to enhance safety awareness of construction workers.

Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.