• Title/Summary/Keyword: Bridge length

Search Result 682, Processing Time 0.027 seconds

Nonlinear aerostatic analysis of long-span suspension bridge by Element free Galerkin method

  • Zamiria, Golriz;Sabbagh-Yazdi, Saeed-Reza
    • Wind and Structures
    • /
    • v.31 no.1
    • /
    • pp.75-84
    • /
    • 2020
  • The aerostatic stability analysis of a long-span suspension bridge by the Element-free Galerkin (EFG) method is presented in this paper. Nonlinear effects due to wind structure interactions should be taken into account in determining the aerostatic behavior of long-span suspension bridges. The EFG method is applied to investigate torsional divergence of suspension bridges, based on both the three components of wind loads and nonlinearities of structural geometric. Since EFG methods, which are based on moving least-square (MLS) interpolation, require only nodal data, the description of the geometry of bridge structure and boundaries consist of defining a set of nodes. A numerical example involving the three-dimensional EFG model of a suspension bridge with a span length of 888m is presented to illustrate the performance and potential of this method. The results indicate that presented method can effectively be applied for modeling suspension bridge structure and the computed results obtained using present modeling strategy for nonlinear suspension bridge structure under wind flow are encouragingly acceptable.

The Application Of F.C.M(Free Cantilever Method) Case Study Of The Railway Bridge (철도교량 F.C.M(Free Cantilever Method) 공법 시공사례 연구)

  • Kwon, Soon-Seob;Kim, Kyong-Yeon;Choi, Dong-Kee;Jeong, In-Choul;Shin, Sang-Chul
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.562-567
    • /
    • 2005
  • F.C.M applied from Jin Jung Li to Yang Su Li(660m) in Puk Han River Bridge(1,414m) construction part is a construction method on the double-track construction which is the third section part of work, called Chung Ang Railroad Line(Deok-So${\sim}$Won-Ju). This method is the beginning application on Railroad Bridge. After completing upper slab structure, there are several following works such as setting up ballast, sleepers and laying long rails. So it is important to consider the properties of Railroad Bridge while designing the length of bridge and its single span. After the physical process study the shrinkage and creep of concrete, bending up by prestressing in general PSM bridge, relaxation of tendons as time goes by after post-tension, the conclusion of such a study is applied to the Puk-Han River Bridge in this construction field.

  • PDF

Innovation of Bridge Structural Systems to Realize a Super Long-span Suspension Bridge (Gwangyang Bridge) (초장대현수교(광양대교)의 실현을 위한 교량구조시스템의 혁신)

  • Kim, Hong-Sik;Kwon, Ho-Chul;Song, Myung-Kwan;Paik, Jong-Gyun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.551-556
    • /
    • 2007
  • In this paper, the contents of numerical in the innovative tender design of the super long-span suspension bridge to be constructed between Myodo and are introduced. The total span length of the bridge, of which the main span is the third in the world so far, reaches 2,260km, and the has the floating type girder which has no vertical points at pylon. Judging from the condition of navigation, wind climate on, and construction cost, it is inevitable to make the central span 1,545m and to the technical level applied to the structural components in the existing suspension system. To realize the innovative super long-span suspension bridge, the close numerical investigations for the structural capacity, aerodynamic serviceability, and dynamic serviceability are carried out by various tools of computational mechanics.

  • PDF

Study of seismic performance of cable-stayed-suspension hybrid bridges

  • Zhang, Xin-Jun;Yu, Zhou-Jun
    • Structural Engineering and Mechanics
    • /
    • v.55 no.6
    • /
    • pp.1203-1221
    • /
    • 2015
  • By taking a cable-stayed-suspension hybrid bridge with main span of 1400 m as example, seismic response of the bridge under the horizontal and vertical seismic excitations is investigated numerically by response spectrum analysis and time history analysis, its seismic performance is discussed and compared to the cable-stayed bridge and suspension bridge with the same main span, and considering the aspect of seismic performance, the feasibility of using cable-stayed-suspension hybrid bridge in super long-span bridges is discussed. Under the horizontal seismic action, the effects of structural design parameters including the cable sag to span ratio, the suspension to span ratio, the side span length, the subsidiary piers in side spans, the girder supporting system and the deck form etc on the seismic performance of the bridge are investigated by response spectrum analysis, and the favorable values of these design parameters are proposed.

Development of Loss Model Based on Quantitative Risk Analysis of Infrastructure Construction Project: Focusing on Bridge Construction Project (인프라건설 프로젝트 리스크 분석에 따른 손실 정량화 모델 개발 연구: 교량프로젝트를 중심으로)

  • Oh, Gyu-Ho;Ahn, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.208-209
    • /
    • 2022
  • This study aims to analyze the risk factors caused by object damage and third-party damage loss in actual bridge construction based on past insurance premium payment data from major domestic insurers for bridge construction projects, and develop a quantitative loss prediction model. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, and the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: flood anf Typhoon, 3) Project information: total construction duration, total cost and ranking. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses, while superstructure, foundation, flood and ranking were shown to affect the ratio of the third-party losses.

  • PDF

Impact effect analysis for hangers of half-through arch bridge by vehicle-bridge coupling

  • Shao, Yuan;Sun, Zong-Guang;Chen, Yi-Fei;Li, Huan-Lan
    • Structural Monitoring and Maintenance
    • /
    • v.2 no.1
    • /
    • pp.65-75
    • /
    • 2015
  • Among the destruction instances of half-through arch bridges, the shorter hangers are more likely to be ruined. For a thorough investigation of the hanger system durability, we have studied vehicle impact effect on hangers with vehicle-bridge coupling method for a half-through concrete-filled-steel-tube arch bridge. A numerical method has been applied to simulate the variation of dynamic internal force (stress) in hangers under different vehicle speeds and road surface roughness. The characteristics and differences in impact effect among hangers with different length (position) are compared. The impact effect is further analyzed comprehensively based on the vehicle speed distribution model. Our results show that the dynamic internal force induced by moving vehicles inside the shorter hangers is significantly greater than that inside the longer ones. The largest difference of dynamic internal force among the hangers could be as high as 28%. Our results well explained a common phenomenon in several hanger damage accidents occurred in China. This work forms a basis for hanger system's fatigue analysis and service life evaluation. It also provides a reference to the design, management, maintenance, monitoring, and evaluation for this kind of bridge.

Shear Key Design of Concrete Track on Bridge (교량구간 콘크리트궤도의 전단키 설계)

  • Back, Hyo-Sun;Lee, Ho-Ryong;Bae, Sang-Hwan;Cho, Hyun-Cheol
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3251-3255
    • /
    • 2011
  • Being the concrete track laid on bridge, due to track-bridge temperature difference, traction and brake force, and nosing force, the horizontal force can be applied to the track slab. Therefore, shear key structures to resist this horizontal force should be installed. The shear key structures installed in the Kyeong-Bu high-speed line are consisted of four shear keys at every slab with the length of 6 to 8m. However, in the point of view of construction, it is more advantageous to curtail the numbers of shear keys, and thus, the numbers and spacing of the shear keys should be carefully determined. In this study, hence, the effects of slab length, the numbers and spacing of the shear keys on design of shear key and track slab are examined.

  • PDF

Study of Bridge Design of The Length-Depth Ratio is 34 (경간/형고비 34를 실현한 IPC 거더교의 연구)

  • 한만엽;곽창현
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.839-844
    • /
    • 2001
  • The length-depth ratio of the preflex and PSC girder is very important variable. But PSC girder is very difficult to reduce the depth. If the bridge that girder depth is most important variable, then generally the great part of engineers are use the preflex girder that more expensive method then PSC girder. This paper introduce the design example that replace the preflex girder with the IPC girder The bridge span is 44m, and depth is 1.15m. The depth is restrained in 1.15m by several conditions. And it is compare preflex with IPC girder in semi condition. These two girders are very different in economy and execution. So, this paper present more economic and easy construction method.

  • PDF

Design Bending Moments For Long-Span Slab On a Composite Two-Girder Bridge (2거더 강합성교를 위한 장지간 바닥판 설계 휨모멘트)

  • Yoon, Hye-Jin;Joh, Chang-Bin;Kim, Byung-Suk
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.754-757
    • /
    • 2004
  • This study was performed to propose design bending moment formula for long-span slab on a composite two-girder bridge. FEM models representing slab spaning between 4m and 12m were analyzed, and parameters such as girder flexibility and orthotropy of slab were considered. By regression of the parametric analyses results, the moment formula that can predict the design moment with reasonable margin of safety and correctness was developed. The research also showed that the design bending moment from Korean Bridge Design Code overestimated the design moment for the span length under gm, and underestimated for the span length over 9m.

  • PDF

Performance Improvement on Plate Girder Bridges Through Continuous Welded Rail (판형교 장대화에 따른 성능 개선)

  • Min, Kyung-Joo;Bahn, Gul-Yong;Ryu, Yeon-Jong
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1439-1449
    • /
    • 2007
  • The challenging aspect of CWR (continuous welded rail) is the additional axial forces in rails, mainly due to the thermal expansion of steel plate girder and rail itself. It has been found that these axial forces are proportional to girder length, total bridge length and bolt tightening forces. Also these forces are dependent to girder support conditions, types of bearings and their arrangements. With CWR, the authors' previous studies show that performance improvements like noise reduce, fatigue resistances and bearing durability increment can be expected. In addition to these effects, secondary effects due to the semi integral behavior between rail and bridge girder also can be expected. Special bearings which can reduce the absolute maximum axial forces have been developed, and applied to real 100m span bridge. The performance improvements were verified through site measurements and numerical analysis. The purpose of this study is to confirm the expected performance improvement aspects of steel plate girder bridges with CWR. To verify these aspects, girder stiffness changes, rail axial force changes, girder displacements and noise level were thoroughly measured and compared.

  • PDF