• 제목/요약/키워드: Bridge during Construction

검색결과 285건 처리시간 0.03초

Buffeting response control of a long span cable-stayed bridge during construction using semi-active tuned liquid column dampers

  • Shum, K.M.;Xu, Y.L.;Guo, W.H.
    • Wind and Structures
    • /
    • 제9권4호
    • /
    • pp.271-296
    • /
    • 2006
  • The frequency of a traditional tuned liquid column damper (TLCD) depends solely on the length of liquid column, which imposes certain restrictions on its application to long span cable-stayed bridges during construction. The configuration of a cable-stayed bridge varies from different construction stages and so do its natural frequencies. It is thus difficult to apply TLCD with a fixed configuration to the bridge during construction or it is not economical to design a series of TLCD with different liquid lengths to suit for various construction stages. Semi-active tuned liquid column damper (SATLCD) with adaptive frequency tuning capacity is studied in this paper for buffeting response control of a long span cable-stayed bridge during construction. The frequency of SATLCD can be adjusted by active control of air pressures inside the air chamber at the two ends of the container. The performance of SATLCD for suppressing combined lateral and torsional vibration of a real long span cable-stayed bridge during construction stage is numerically investigated using a finite element-based approach. The finite element model of SATLCD is also developed and incorporated into the finite element model of the bridge for predicting buffeting response of the coupled SATLCD-bridge system in the time domain. The investigations show that with a fixed container configuration, the SATLCD with adaptive frequency tuning can effectively reduce buffeting response of the bridge during various construction stages.

낙동강교 ILM 가설에 따른 시공 중 계측 (Measurement during Construction of Nakdong Bridge by Incremental Launching Method)

  • 김형태;조남소;정지만;양성만
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.575-580
    • /
    • 2007
  • As the volume of traffic in southern part of the republic of Korea grew, expansion of transportation was required. In that purpose, the railway between Samnangjin and Gwangyang is being extended to a double-track line. This construction includes Nakdong bridge located across Nakdong river. This truss bridge is constructed in incremental launching method (ILM) and composed of two sections, straight line and curved one. Bridge construction in the method goes with the shift of roller supports which results in the change of structural system. To accomplish safe construction, the measurement during the whole launching stages. The locations of member in severe condition and the corresponding response values were estimated through the preliminary construction stage analysis. Based on the analysis, the measurement during construction was planned. Several sensors and measurement devices were installed at appropriate locations. During the whole launching stages, the measurement was performed and the corresponding data were monitored and stored in real time. The comparison of the responses from the analysis and the measurement showed no indication of yielding of the structural members. Consequently, the construction of Nakdong bridge was concluded to be relevant.

  • PDF

교량세굴 평가 기술매뉴얼 개발 (Development of Bridge Scour Manual)

  • 박재현;이주형;정문경;곽기석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.517-524
    • /
    • 2004
  • The leading cause of bridge failures is scouring bed material from around bridge foundations. Many advanced countries such as U.S.A., U.K., the Netherlands and New Zealand have developed and revised their own bridge scour manuals fit for their field conditions. In Korea, researches for reducing bridge failures during floods have concentrated on analysis, laboratory test and countermeasure of bridge scour during the last ten years. however no comprehensive manual for evaluating bridge scour and for identifying the conditions of bridge foundations has been provided yet. In this study, a new bridge scour manual is developed for the accurate evaluation of bridge scour, which reflects domestic field conditions with various streambed materials. The SRICOS method and the Erodibility Index Method are suggested for fine-grained soils and weathered rocks, respectively. In addition, bridge scour analysis algorithms are developed for field engineers to estimate bridge scour depth and to evaluate the susceptibility of bridge scour with ease.

  • PDF

일부타정식 케이블 시스템 장경간 사장교의 시공 중 동적 안전성 분석 (Structural Safety Analysis of a Long Span Cable-stayed Bridge with a Partially Earth Anchored Cable System on Dynamic Loads during Construction)

  • 원정훈;김경윤
    • 한국안전학회지
    • /
    • 제31권4호
    • /
    • pp.104-110
    • /
    • 2016
  • The effect of a partially earth anchored cable system on the structural safety of a long span cable-stayed bridge under seismic and wind loads are examined during construction process. By assuming the FCM (free cantilever method) construction stages with structural vulnerability, a multi-mode spectral analysis and a multi-mode buffeting analysis are performed for specific seismic load and wind load, respectively. Results show that the wind load dominates the structural safety of a cable-stayed bridge during construction. And, the application of a partially earth anchored cable system can enhance structural safety under wind load since the maximum pylon moment in the model with partially earth anchored cable system is reduced by 49% under wind load. In contrast, the maximum pylon moment occurred by seismic load is only decreased by 8%.

Design of aerodynamic stabilizing cables for a cable-stayed bridge during construction

  • Choi, Sung-Won;Kim, Ho-Kyung
    • Wind and Structures
    • /
    • 제11권5호
    • /
    • pp.391-411
    • /
    • 2008
  • A design procedure of stabilizing cable is proposed using buffeting analysis to stabilize the seesaw-like motion of the free cantilevered structure of a cable-stayed bridge during its construction. The bridge examined is a composite cable-stayed bridge having a main span length of 500 m. Based on the buffeting analysis, the stress in bare structure exceeded the allowable limit and a set of stabilizing cable was planned to mitigate the responses. The most efficient positions of the hold-down stabilizing cables were numerically investigated by means of an FE-based buffeting analysis and the required dimensions and pretension of the stabilizing cables were also calculated. The proposed stabilizing measure would be expected to secure the aerodynamic safety of a cantilevered structure under construction with considerable mitigation of buffeting responses.

강합성 2주형 사장교의 시공중 내풍 안정성 확보 방안 연구 (Temporary Stabilizing Measures during Construction of a Steel Composite 2-Edge Girder Cable Stayed Bridge)

  • 김영민;김대영
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2008년도 정기총회 및 학술발표대회
    • /
    • pp.63-66
    • /
    • 2008
  • The bridge deck section composed of a concrete slab resting on two I-beam girders are known to be susceptible to flutter instability and vortex shedding. Moreover, the cable stayed bridge in construction is more vulnerable to wind rather than in service when the free cantilever construction method is applied. This paper describes the effect of the dynamic wind loads on the bridge during construction and the effect of alternative temporary stabilizing measures. Therefore, a series of wind tunnel tests and numerical analysis were carried out to determine if any countermeasures were required.

  • PDF

PCCAP을 이용한 장대 사장교의 버페팅 해석 (Beffeting Analysis of Long Span Cable-stayed Bridge using PCCAP)

  • 유원진;이석용;남효승;이완수
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2003년도 가을 학술발표회 논문집
    • /
    • pp.202-208
    • /
    • 2003
  • In this study, a time domain analysis is presented for investigation on the buffeting response of cable-stayed bridge during both erection and completion stages. The main span length and width of deck are 520 m and 15.1m, each. Since the ratio of span over width is 34.44, aerodynamic stability of the bridge during erection is expected to dominate the safety of the bridge in construction stage. Several conclusions regarding different construction stages and temporary wind cables are obtained.

  • PDF

Improved bracing systems to prevent exterior girder rotation during bridge construction

  • Ashiquzzaman, Md;Ibrahim, Ahmed;Lindquist, Will;Hindi, Riyadh
    • Steel and Composite Structures
    • /
    • 제32권3호
    • /
    • pp.325-336
    • /
    • 2019
  • Concrete placement and temporary formwork of bridge deck overhangs result in unbalanced eccentric loads that cause exterior girders to rotate during construction. These construction loads affect the global and local stability of the girders and produce permanent girder rotation after construction. In addition to construction loads, the skew angle of the bridge also contributes to girder rotation. To prevent rotation (in both skewed and non-skewed bridges), a number of techniques have been suggested to temporarily brace the girders using transverse tie bars connecting the top flanges and embedded in the deck, temporary horizontal and diagonal steel pipes placed between the webs of the exterior and first interior girders, and permanent cross frames. This study includes a rigorous three-dimensional finite element analysis to evaluate the effectiveness of several bracing systems for non-skewed and several skewed bridges. In this paper, skew angles of $0^{\circ}$, $20^{\circ}$, $30^{\circ}$, and $45^{\circ}$ were considered for single- and three-span bridges. The results showed that permanent cross frames worked well for all bridges, whereas temporary measures have limited application depending on the skew angle of the bridge.

Impact of Bridge Construction on County Population in Georgia

  • Jeong, M. Myung;Kang, Mingon;Jung, Younghan E.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1017-1023
    • /
    • 2022
  • Past research shows that the construction of new infrastructure accelerates economic growth in the region by attracting more people and commodities. However, the previous studies only considered large-scale infrastructures such as sea-cross bridges and channel tunnels. There is a paucity of literature on regional infrastructure and its impact on socio-economic indicators. This paper explores the impact of new bridge construction on the human population, particularly focusing on regional bridges constructed during the 2000s in the state of Georgia. The human population at a county level was selected as a single socio-economic factor to be evaluated. A total of 124 cases were investigated as to whether the emergence of a new bridge affected the population change. The interrupted time series analysis was used to statistically examine the significance of population change due to the construction by treating each new bridge as an intervention event. The results show that, out of the 124 cases, the population of 67 cases significantly increased after the bridge construction, while the population of 57 cases was not affected by the construction at a significance level of 0.05. The 124 cases were also analyzed by route type, functional class, and traffic volume, but the results revealed, unlike large-scale infrastructure, that no clear evidence was found that a new bridge would bring an increase in the human population at a county level.

  • PDF

대블록시공법에 따른 강상판교의 시공단계별 거동 (Behavior Due to Construction Step in Steel Deck Bridge by Large Block Construction Method)

  • 이성행;김경남;함형길;정경섭
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제14권2호
    • /
    • pp.97-105
    • /
    • 2010
  • 시공단계에 따른 강상판교의 변위를 측정하였고, 이 결과와 비교하기 위하여 3차원 구조해석을 수행하였다. 검증된 모델을 사용하여 대블럭 시공법에 의한 시공단계에 따른 3차원 구조해석을 수행하여 다음과 같은 결론을 얻었다. 1. 설계에 사용된 Grid 해석과 3차원 해석에 의한 결과를 비교하면, Grid 해석의 결과는 곡선교의 변위를 모사하는데 한계가 있었으며, 두 가지 해석방법에 의한 변위의 차이는 약 10~20%정도였다. 2. 가설중에 일어날 수 있는 최대 처짐은 완료된 상태의 처짐에 비하여 1.7배까지 크게 발생하였다. 3. 시공단계 해석 결과, 블록시공법에 의하여 시공되는 교량의 거동은 전체 구조물이 일체로 되어 한 번에 거치되는 교량과는 다른 결과가 도출되며, 중간의 가설과정에서는 설계시 고려된 응답보다 더 큰 결과가 도출되고 있으므로, 설계시 시공단계를 고려한 해석을 통하여 합리적인 구조설계가 이루어져야 한다.