• Title/Summary/Keyword: Bridge area

Search Result 748, Processing Time 0.028 seconds

Vibrational energy flow in steel box girders: Dominant modes and components, and effective vibration reduction measures

  • Derui Kong;Xun Zhang;Cong Li;Keer Cui
    • Steel and Composite Structures
    • /
    • v.50 no.3
    • /
    • pp.347-362
    • /
    • 2024
  • Controlling vibrations and noise in steel box girders is important for reducing noise pollution and avoiding discomfort to residents of dwellings along bridges. The fundamental approach to solving this problem involves first identifying the main path of transmission of the vibration energy and then cutting it off by using targeted measures. However, this requires an investigation of the characteristics of flow of vibration energy in the steel box girder, whereas most studies in the area have focused on analyzing its single-point frequency response and overall vibrations. To solve this problem, this study examines the transmission of vibrations through the segments of a steel box girder when it is subjected to harmonic loads through structural intensity analysis based on standard finite element software and a post-processing code created by the authors. We identified several frequencies that dominated the vibrations of the steel box girder as well as the factors that influenced their emergence. We also assessed the contributions of a variety of vibrational waves to power flow, and the results showed that bending waves were dominant in the top plate and in-plane waves in the vertical plate of the girder. Finally, we analyzed the effects of commonly used stiffened structures and steel-concrete composite structures on the flow of vibration energy in the girder, and verified their positive impacts on energy regionalization. In addition to providing an efficient tool for the relevant analyses, the work here informs research on optimizing steel box girders to reduce vibrations and noise in them.

Evaluation of Static Behaviour of Orthotropic Steel Deck Considering the Loading Patterns (하중재하 패턴을 고려한 강바닥판의 정적거동 평가)

  • Kim, Seok Tae;Huh, Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.2
    • /
    • pp.98-106
    • /
    • 2011
  • The deck of steel box girder bridges is composed of deck plate, longitudinal rib, and transverse ribs. The orthotropic steel decks have high possibility to fatigue damage due to numbers of welded connection part, the heavy contact loadings, and the increase of repeated loadings. Generally, the local stress by the repeated loadings of heavy vehicles causes the orthotropic steel deck bridge to fatigue cracks. The increase of traffic volume and heavy vehicle loadings are promoted the possibility of fatigue cracks. Thus, it is important to exactly evaluate the structural behavior of bridge considering the contact loading area of heavy vehicles and real load patterns of heavy trucks which have effects on the bridge. This study estimated the effect of contact area of design loads and real traffic vehicles through the finite element analysis considering the real loading conditions. The finite element analysis carried out 4 cases of loading patterns in the orthotropic steel deck bridge. Also, analysis estimated the influence of contact area of real truck loadings by the existence of diaphragm plate. The result of finite element analysis indicated that single tire loadings of real trucks occurred higher local stress than one of design loadings, and especially the deck plate got the most influence by the single tire loading. It was found that the diaphragm attachment at joint part of longitudinal ribs and transverse ribs had no effects on the improvement of structural performance against fatigue resistance in elastic analysis.

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • v.32 no.1
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.

A Study on the Improvement Measures for the Safe Maneuvering of Passenger Ships in Port Area through Analysis of Marine Accidents (여객선 해양사고 분석을 통한 안전한 항내조선 개선방안에 관한연구)

  • Chong, Dae-Yul
    • Journal of Navigation and Port Research
    • /
    • v.46 no.1
    • /
    • pp.18-25
    • /
    • 2022
  • MOF strengthen the law and institutions for safety management after the capsize accident of passenger ship "Sewol" on April 16, 2014. Nevertheless, about 13 cases of marine accidents such as collisions, contact, and stranding have occurred in coastal passenger ships over the past 5 years. Particularly, according to the judgment of KMST, most of the main causes of passenger ship accidents occurred within harbor areas because of the master's improper ship-handling or inattention. And so, this study analyzed four cases of marine accidents on passenger ships that occurred in the port areas and examined the environmental, institutional, material, and human factors that contributed to the master's improper ship-handling and behavior, and the results are as follows. First, as an environmental factor, the size of the turning basin was not enough. Second, as an institutional factor, the VTS control was not properly supported, the master lacked sufficient training for safe ship-handling in the port area and up-to-date charts were not provided. Third, as a material factor, the digital type speed log capable of the ship's speed in real-time was not installed on the ship's wing bridge. Lastly, as a human factor, the master could not take proper bridge resources and the passage plan was not proper. Therefore, it is suggested in this paper that the size of the turning basin should be adjusted to meet the prescribed standards, the master of passenger ships should receive the ship-handling simulation training among other safety training to ensure safe ship-handling of the master in the port area as improvement measures.

Improvement Effect of Water Quality along the Water Discharged Area by Water Dispersion from the Sewage Disposal Plant (하수처리장 분산방류에 의한 방류수역의 수질개선효과)

  • Kim, Dong-Soo;Park, Jong-Tae;Kim, Yong-Gu;Park, Sung-Chun
    • Journal of Environmental Science International
    • /
    • v.17 no.1
    • /
    • pp.113-118
    • /
    • 2008
  • [ $6{\sim}13mg/L$ ] base water concentration on monthly BOD has been kept at the Geukrak bridge point for this research target and it indicates the water quality under the existed rank. Due to this present condition of water quality, the demage of ecology from the upper stream to the lower one of the bridge could be conjectured. Moreover, nonstructural extinction of the ecology seems to have gotten worse between both the streams of Yeoungsan River. On this research, eco-corridor between the upper stream and the lower stream of the river should be ensured, the ecological demage needs to be cut off, a dispersed discharge method which the existed method of the 1st sewage plant in Gwangju was enhanced to should be inducted for the procuring of various water ecosystem, and the conditions by the scenario suggested from this research could be applied to a water quality model. then, analysis the improvement effect of the water quality adjacent the river. From the test result, Case3-Type1 scenario is thought to be the best one. From the test result with Case3-Type1 when the concentrated discharge was never done, 0.07 mg/L of BOD concentration was increased at the lower stream where Yeoungbon B point (Haksan Bridge) is but the water improvement effect of $0.24{\sim}2.87mg/L$ is thought to have been done at the area of water deterioration.

Design Procedure of Stress Ribbon Pedestrian Bridges (스트레스 리본 보도교의 설계절차)

  • Han, Ki-Jang;Choi, Young-Goo;Park, Kyoung-Yong;Kim, Kee-Dong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.5
    • /
    • pp.2474-2480
    • /
    • 2013
  • A stress ribbon pedestrian bridge is the structure in which the axial force of prestressed deck, which is developed by introducing prestressed force into the thin deck with the very low value of span to deck-depth ratio which is installed on bearing cables with the specified sag, resists most of external loadings. Since the design of stress ribbon pedestrian bridges should be conducted by assuming the cross-section of deck, the area of bearing cables and post-tensioning cables, and the prestressed force of post-tensioning cables, it requires much more iterative processes than the design of general bridges. In this research, to minimize such iteration processes, regression equations which can reasonably assume the area of bearing cables and post-tensioning cables, and the prestressed force of post-tensioning cables, are suggested for the bridge length of 80m with the sag-span ratios of 1/30, 1/40, and 1/50.

A Study on Taehwa River Red Tide Solution through Stream Flow (유수소통을 통한 태화강 적조해결 방안 연구)

  • Cho, Hong-Je;Yoon, Sung-Kyu
    • Journal of Wetlands Research
    • /
    • v.13 no.2
    • /
    • pp.363-375
    • /
    • 2011
  • Recently, Water quiality of urban river largely have gotten better by virtue of sewer pipe laying and sewage treatment plants construction. or the various contaminants which is flowed in into river have generated underwater ecosystem disturbance and red tide by lack of sewage and waste water disposal facilities. With tidal river, taehwa river of ulsan metropolitan city has large river width and gradual stream bed gradient at the dry and storage period. Moreover, the flow is paralyzed due to the bridge pier protection work, consist of the mat foundation which is about 1.2km from two bridge and the contaminant is accumulated. it is caused by of the red tide generated from the several years or it activates. In this study, When flow area is largest by changing independent footing of bridge pier of two bridges and using RMA2 model, we hydraulically analyzed a variable breadth of velocity and discharge. Consequently, flow rate increased the maximum 103%, discharge was exposed to increase the maximum 61%. Directly this cannot extinguish the red tide but suppresses the red tide occurrence or can reduce. And it is determined to prevent the depositioning of the contaminant and can control fundamentally the red tide occurrence cause.

A Study on the Thermal Bridge Reduced Stiffeners for the Reduction of Window Overall Hear Transfer Coefficient (창문 열관류율 저감을 위한 열교 저감형 보강재 연구)

  • Jang, Hyok-Soo;Kim, Young-Il;Chung, Kwang-Seop
    • Journal of Energy Engineering
    • /
    • v.24 no.4
    • /
    • pp.71-80
    • /
    • 2015
  • Steel stiffener is required for reinforcing the structure of the window frame made of versatile but weak PVC material. Steel stiffener however becomes a source of greater heat loss and frequently plays a role of thermal bridge due to its high thermal conductivity. To maintain thermal resistance similar to PVC frame, steel stiffener is perforated to reduce the effective heat transfer area. To compensate the structural strength of the steel stiffener which is weakened by the perforation, the thickness is increased. Increase in thickness will also increase the thermal heat resistance. Five samples which are PVC frame, PVC frame + original steel stiffener, PVC frame + 30% perforated steel stiffener, PVC frame + 50% perforated steel stiffener, PVC frame + 65% perforated steel stiffener are modeled and simulated for 2nd moment of area and thermal resistance. Therm/window version 6.3 is used for thermal analysis. The results show that among the five samples analyzed, PVC frame + 65% perforated steel stiffener best satisfies both structural strength and thermal resistance.

Study on shear fracture behavior of soft filling in concrete specimens: Experimental tests and numerical simulation

  • Lei, Zhou;Vahab, Sarfarazi;Hadi, Haeri;Amir Aslan, Naderi;Mohammad Fatehi, Marji;Fei, Wu
    • Structural Engineering and Mechanics
    • /
    • v.85 no.3
    • /
    • pp.337-351
    • /
    • 2023
  • In this paper, the shear behavior of soft filling in rectangular-hollow concrete specimens was simulated using the 2D particle flow code (PFC2D). The laboratory-measured properties were used to calibrate some PFC2D micro-properties for modeling the behavior of geo-materials. The dimensions of prepared and modeled samples were 100 mm×100 mm. Some disc type narrow bands were removed from the central part of the model and different lengths of bridge areas (i.e., the distance between internal tips of two joints) with lengths of 30 mm, 50 mm, and 70 mm were produced. Then, the middle of the rectangular hollow was filled with cement material. Three filling sizes with dimensions of 5 mm×5 mm, 10 mm×5 mm, and 15 mm×5 mm were provided for different modeled samples. The parallel bond model was used to calibrate and re-produce these modeled specimens. Therefore, totally, 9 different types of samples were designed for the shear tests in PFC2D. The shear load was gradually applied to the model under a constant loading condition of 3 MPa (σc/3). The loading was continued till shear failure occur in the modeled concrete specimens. It has been shown that both tensile and shear cracks may occur in the fillings. The shear cracks mainly initiated from the crack (joint) tips and coalesced with another one. The shear displacements and shear strengths were both increased as the filling dimensions increased (for the case of a bridge area with a particular fixed length).

Determination of Effective Flange Width in Single Plane Cable-Stayed Concrete Bridge (1면 케이블 콘크리트 사장교의 유효플랜지폭 결정에 관한 연구)

  • Lee, Hwan-Woo;Kim, Kwang-Soo;Kang, Ho-Jun
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.4
    • /
    • pp.343-351
    • /
    • 2010
  • Bending and axial compressive stresses are distributed across the whole upper flange of a box girder bridge which has the span-to-depth ratio (B/L) of below 0.5, according to Korea Bridge Design Specifications (Minister of Land, Transport and Maritime Affairs, 2005). Shear lag phenomenon, however, can take place in the construction phase of cable-stayed bridge, in which stresses combining bending moment due to dead weight and cable vertical compression are induced. This study aims to analyze the effective width of flange over which composite stresses are given, which should be calculated during the construction phase of stiffening girder of single plane cable-stayed box girder bridge. The study results indicate that the full width of stiffening girder can be regarded as the effective flange width when the span-to-depth ratio for the deck is below 0.38. In other words, the area, where shear lag is taken into consideration, is larger than the width of box girder in single plane cable-stayed box girder bridges. Therefore, the current practice of considering the full width as the effective flange width regardless of changes of the span-to-depth ratio during the construction stage can produce an unsafe bridge. If the effective flange width is determined according to the single span structural system in the early stage of construction when the span-to depth ratio for the deck is high and composite stresses of every part expect each end of the bridge are calculated, it can result in a safe structural design. Since the span-to-depth ratio gradually decreases, however, it is appropriate to determine the effective width of flange on the basis of the full width and the cantilever structural system.