• Title/Summary/Keyword: Bridge area

Search Result 748, Processing Time 0.03 seconds

Acquisition and Accuracy Assessment of topographic information of inaccessible areas (위성영상을 이용한 비접근지역의 지형정보 획득 및 정확도 평가)

  • 고종식;최윤수;김욱남;이상준
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.11a
    • /
    • pp.393-398
    • /
    • 2004
  • It is transformed map data of different coordinate system into unique system and We triedto make topographic map on non-accessible area. We transformed Russian map coordinates(Krassovsky, G-K projection) intoWGS-84, TM projection and assessed accuracy. The RMSE(in East and West bearings : ${\pm}$13.67m, in North and South bearings : ${\pm}$14.67m) using only SCP(Survey Control Point) is more accurate than that(in East and West bearings : ${\pm}$24.26m, in North and South bearings : ${\pm}$25.32m) using SCP, intersection of road, bridge. Exterior orientation parameters are estimated using rigorous modelling and GCPs are classified with SCP, intersection of road, bridge. Rigorous modelling is performed with each classified GCP. The modelling result usingonly SCP(in East and West bearings : ${\pm}$13.53m, in North and South bearings : ${\pm}$14.22m) is more accurate than that using intersection of road(in East and West bearings : ${\pm}$16.l1m, in North and South bearings: ${\pm}$23.85m), bridge(in East and West bearings : ${\pm}$17.21m, in North and South bearings : ${\pm}$21.82m). The results means that SCP is more accurate than intersection of road, bridge because of edit to generate map. therefore, SCP is suitable for object of GCP in paper map(1:50,000). Geographic information on non-accessible area and analysis is performed. The results of stereoscopic plotting is well matched old map data on road, railroad but, many objects are generally editted. It is possible to update on new objects(building, tributary ‥‥etc). Ability of description using SPOT-5(stereo) is more than features and items included in 1:50,000 topographic map. Therefore, it is possible to make large scale map than 1:50,000 topographic map using SPOT-5 imagery. But, there are many problems(accurate GCPs, obtain of high resolution stereoscopic satellite imagery in a period ‥‥ etc) to make topographic map on non-accessible area. It is actually difficult to solve these problems. therefore, it is possible to update 1:50,000 topographic map in part of topographic map generation.

  • PDF

A Numerical Analysis of Tolerable Settlement for Bridges (수치해석에 의한 중소형교량 교량기초의 허용침하량 평가)

  • Jung, Gyung-Ja;Jeon, Kyung-Soo;Cho, Jun-Sang;Lee, Sang-Heon;Byun, Hyung-Kyoon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.569-579
    • /
    • 2010
  • Tolerable vertical displacement of a bridge is dependent on the superstructure-type, slope, span, and etc.. In the design stage, however, resultant force of cross section is examined supposed that the settlement is 1 cm at the bearing point. And the 1cm is sometimes considered as if the criteria of allowable foundation settlement. It is needed to establish the criteria of the tolerable displacement for the small and middle bridges which are widely used in domestic area. The design data of domestic bridges including expressway bridges were collected and analyzed according to the types of superstructures and foundations. And numerical simulations were conducted for RC rigid frame bridges, PSC girder bridges, IPC girder bridges, PSC box girder bridges, and steel box girder bridges to examine the tolerable displacements.

  • PDF

Evaluation of Fatigue Performance of RC Deck Slabs by 80 MPa High-Strength Concrete (80 MPa급 고강도 콘크리트를 적용한 RC 바닥판의 피로 성능 평가)

  • Bae, Jae-Hyun;Hwang, Hoon-Hee;Yoo, Dong-Min;Park, Sung-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.4
    • /
    • pp.66-72
    • /
    • 2017
  • Recently, the use of high-strength concrete is increasing due to the trend of constructing high-rise and long span structures. The benefit of using the high-strength concrete is that it increases the durability and strength while it reduces the cross-sectional area of the bridge deck slabs. Moreover, it offers more safety as these bridge deck slabs applying high-strength requires strict structural performance verification. In this study, the fatigue performance of the bridge deck slabs applying 80 MPa high-strength concrete was verified through various experiments. The experimental results showed that the specimens satisfy the conditions of flexural strength, punching shear strength, deflection and cracking. In conclusion, the bridge deck slabs designed by 80 MPa high-strength concrete are enough safe despite of its low thickness.

Seismic performance of RC bridge piers reinforced with varying yield strength steel

  • Su, Junsheng;Dhakal, Rajesh Prasad;Wang, Junjie;Wang, Wenbiao
    • Earthquakes and Structures
    • /
    • v.12 no.2
    • /
    • pp.201-211
    • /
    • 2017
  • This paper experimentally investigates the effect of yield strength of reinforcing bars and stirrups on the seismic performance of reinforced concrete (RC) circular piers. Reversed cyclic loading tests of nine-large scale specimens with longitudinal and transverse reinforcement of different yield strengths (varying between HRB335, HRB500E and HRB600 rebars) were conducted. The test parameters include the yield strength and amount of longitudinal and transverse reinforcement. The results indicate that the adoption of high-strength steel (HSS) reinforcement HRB500E and HRB600 (to replace HRB335) as longitudinal bars without reducing the steel area (i.e., equal volume replacement) is found to increase the moment resistance (as expected) and the total deformation capacity while reducing the residual displacement, ductility and energy dissipation capacity to some extent. Higher strength stirrups enhance the ductility and energy dissipation capacity of RC bridge piers. While the product of steel yield strength and reinforcement ratio ($f_y{\rho}_s$) is kept constant (i.e., equal strength replacement), the piers with higher yield strength longitudinal bars are found to achieve as good seismic performance as when lower strength bars are used. When higher yield strength transverse reinforcement is to be used to maintain equal strength, reducing bar diameter is found to be a better approach than increasing the tie spacing.

Washoff Characteristics and Correlation of Nonpoint pollutants in a Bridge Storm Runoff (교량 강우유출수내 비점오염물질의 유출특성 및 상관성)

  • Wee, Seung-Kyung;Kim, Lee-Hyung;Jung, Yong-Jun;Gil, Kyung-Ikt
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.3
    • /
    • pp.378-382
    • /
    • 2008
  • During the dry periods, many types of pollutants are being accumulated on the paved surface by vehicle activities and the accumulated various pollutants are inflowing into the near watershed areas for the rainfall periods. Particularly, bridges are the centralized region to be the surface runoff of the stromwater due to the high ratio of the impermeable area. Also, the metals, toxic chemicals and sediments originated from bridges could be strongly influenced to the watershed areas during the runoff. Therefore, the present study is achieved to provide washoff characteristics and correlation from the bridge during rainfall periods. The result shows that the EMC ranges for 95% confidence intervals in a bridge land use are 10.12~128.09 mg/L for TSS, 6.07~21.15 mg/L for BOD, 2.10~6.70 mg/L for TN and 0.06~0.85 mg/L for TP.

Application of Geophysical Results to Designing Bridge over Large Fault (대규모 단층대를 통과하는 교량설계를 위한 물리탐사의 활용)

  • 정호준;김정호;박근필;최호식;김기석;김종수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.245-248
    • /
    • 2001
  • During the core drilling for the design of a railway bridge crossing over the inferred fault system along the river, fracture zone, extends vertically more than the bottom of borehole, filled with fault gouge was found. The safety of bridge could be threatened by the excessive subsidence or the reduced bearing capacity of bedrock, if a fault would be developed under or around the pier foundation. Thus, a close examination of the fault was required to rearrange pier locations away from the fault or to select a reinforcement method if necessary. Geophysical methods, seismic reflection method and electrical resistivity survey over the water covered area, were applied to delineate the weak zone associated with the fault system. The results of geophysical survey clearly showed a number of faults extending vertically more than 50m. Reinforcement was not desirable because of the high cost and the water contamination, etc. The pier locations were thus rearranged based on the results of geophysical surveys to avoid the undesirable situations, and additional core drillings on the rearranged pier locations were carried out. The bedrock conditions at the additional drilling sites turned out to be acceptable for the construction of piers.

  • PDF

Design analysis of the optimum configuration of self-anchored cable-stayed suspension bridges

  • Lonetti, Paolo;Pascuzzo, Arturo
    • Structural Engineering and Mechanics
    • /
    • v.51 no.5
    • /
    • pp.847-866
    • /
    • 2014
  • This paper describes a formulation to predict optimum post-tensioning forces and cable dimensioning for self-anchored cable-stayed suspension bridges. The analysis is developed with respect to both dead and live load configurations, taking into account design constrains concerning serviceability and ultimate limit states. In particular, under dead loads, the analysis is developed with the purpose to calculate the post-tensioning cable forces to achieve minimum deflections for both girder and pylons. Moreover, under live loads, for each cable elements, the lowest required cross-section area is determined, which verifies prescriptions, under ultimate or serviceability limit states, on maximum allowable stresses and bridge deflections. The final configuration is obtained by means of an iterative procedure, which leads to a progressive definition of the stay, hanger and main cable characteristics, concerning both post-tensioning cable stresses and cross-sections. The design procedure is developed in the framework of a FE modeling, by using a refined formulation of the bridge components, taking into account of geometric nonlinearities involved in the bridge components. The results demonstrate that the proposed method can be easily utilized to predict the cable dimensioning also in the framework of long span bridge structures, in which typically more complexities are expected in view of the large number of variables involved in the design analysis.

Development of Fragility Curves of Concrete Bridges (콘크리트 교량의 손상도 곡선 개발)

  • 김상훈;김두희;서형렬;김종인
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.09a
    • /
    • pp.319-325
    • /
    • 2003
  • The fragility curves of seismic retrofitted bridges by steel jacketing of bridge columns and restrainers at expansion joints after the 1994 Northridge earthquake are developed. Fragility curves are represented by lognormal distribution functions with two parameters(fragility parameters consisting of median and log-standard deviation) and developed as a function of peak ground acceleration (PGA). Two parameters in the lognormal distribution are estimated by the maximum likelihood method. The sixty ground acceleration time histories for Los Angeles area developed for FEMA SAC project are used for the dynamic analysis of the bridges and a computer code is developed to calculate hysterestic parameters of bridge columns before and after steel jacketing. The effect of retrofit is expressed in terms of the increase of the median value of the fragility curve for the retrofitted bridge from that of the bridge before retrofit. The comparison of fragility curves of the bridges before and after column retrofit demonstrates that the improvement of the bridges with steel jacketing on the seismic performance is excellent for the damage states defined in this study. The comparison of fragility curves of the bridges before and after restrainers at expansion joints also shows the improvement in the seismic performance of restrained bridges for the severe damage states.

  • PDF

An experimental study of the mechanical performance of different types of girdling beams used to elevate bridges

  • Fangyuan Li;Wenhao Li;Peifeng Wu
    • Structural Engineering and Mechanics
    • /
    • v.85 no.4
    • /
    • pp.563-571
    • /
    • 2023
  • Girdling underpinning joints are key areas of concern for the pier-cutting bridge-lifting process. In this study, five specimens of an underpinning joint were prepared by varying the cross-sectional shape of the respective column, the process used to treat the beam-column interface (BCI), and the casting process. These specimens were subsequently analyzed through static failure tests. The BCI was found to be the weakest area of the joint, and the specimens containing a BCI underwent punching shear failure. The top of the girdling beam (GB) was subjected to a circumferential tensile force during slippage failure. Compared to the specimens with a smooth BCI, the specimens subjected to chiseling exhibited more pronounced circumferential compression at the BCI, which in turn considerably increased the shear capacity of the BCI and the ductility of the structure. The GB for the specimens containing a column with a circular cross-section exhibited better shear mechanical properties than the GB of other specimens. The BCI in specimens containing a column with a circular cross-section was more ductile during failure than that in specimens containing a column with a square cross-section.

Arthroscopic Rotator Cuff Repair: Double Rows & Suture Bridge Technique (관절경적 회전근 개 봉합술: 이열 봉합술 및 교량형 봉합술식)

  • Shin, Sang-Jin
    • Clinics in Shoulder and Elbow
    • /
    • v.11 no.2
    • /
    • pp.82-89
    • /
    • 2008
  • Ideal rotator cuff repair is to maintain high fixation strength and minimize gap formation for optimizing the environment of biologic healing of tendon to bone. Among the current repair techniques, the suture bridge technique is superior to single- or double-row repair in ultimate load to failure, gap formation, restoring anatomical footprint and achieving pressurized contact area. The suture bridge technique also minimizes gap formation and has rotational and torsional resistances allowing early rehabilitation. However, despite superior biomechanical characteristics of the suture bridge technique, there is no evidence that these mechanical advantages result in better clinical outcomes. Furthermore, there is no difference in failure rates between the double-row repair and suture bridge techniques. An appropriate repair technique should be determined based on tear size and pattern and tendon quality.