• Title/Summary/Keyword: Bridge Maintenance Cost

Search Result 170, Processing Time 0.029 seconds

A Study on the Improvement of Bridge Maintenance and Operation Level Using Life-Cycle Cost Analysis (LCC분석을 통한 교량 유지관리수준의 개선에 관한 연구)

  • Chun yong-Hyun;Lee Young-Dae;Park Hyeok;Kim Sung-Hwan;Kim Sa-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.266-269
    • /
    • 2003
  • This study predicts the maintenance and operation level of the bridge based on the LCC concept. In order to predict the LCC of the given case, suggested the maintenance and operation level after reviewing other related materials. Apply the real information of the maintenance and operation to the three casesof the maintenance and operation level (real, current, and prevented maintenance and operation level). And based on such analytical measures, maintenance and operation costs and LCC in maintenance and operation level, have been predicted: therefore, suggests the basic information about maintenance and operation level for the bridge. With a result of this study, we could obtain (1)the LCC of PSC-bridge and RC-bridge is more economy than Steel-bridge and (2)more active maintenance and operation of a bridge is absolutely necessary.

  • PDF

The Preventive Maintenance Strategy in Operation Stage of Bridge using Bayesian Inference (베이지안 추론법을 이용한 교량 운영단계에서의 예방적 유지관리 전략)

  • Lee, Jin Hyuk;Choi, Yang Rock;Ann, Hojune;Kong, Jung Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.1
    • /
    • pp.135-146
    • /
    • 2019
  • In this paper, the preventive maintenance strategy in operation stage of a bridge using Bayesian inference is proposed. The proposed technique can be used to predict the variation in the performance (or condition) of the bridge with higher accuracy, considering the uncertainty of monitoring. The applicability of the proposed method to the existing bridges is verified and analyzed that have an advantage in terms of maintenance cost efficiency compared to the conventional periodic maintenance system, which establishes maintenance after damage. It is expected that the proposed preventive maintenance method can be used to overcome the limitation of the conventional periodic maintenance method and to make practical bridge maintenance decision.

A Study on Life Cycle Cost According to Bridge Condition (교량 상태에 따른 생애주기비용 영향 분석)

  • Park, Jun-Yong;Lee, Keesei
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.2
    • /
    • pp.802-809
    • /
    • 2021
  • To cope with the increasing maintenance costs due to aging, the maintenance cost was evaluated from the perspective of asset management. The maintenance cost can be predicted based on the condition of the bridge, and the life cycle cost is used as an index. In general, the condition of a bridge has a wide distribution characteristic depending on the deterioration, load, and material characteristics. In this paper, to evaluate the effect of the bridge conditions on the life cycle cost, condition prediction models were constructed considering the service life, deterioration rate, and inspection error, which are the main variables of the bridge condition and life cycle cost calculation. In addition, condition prediction models were constructed based on the distribution of the health index to estimate the upper and lower bounds of the life cycle costs that can occur in individual bridges. Life cycle cost analysis showed that the life cycle cost differed significantly according to the condition of the bridge. Accordingly, research will be needed to increase the reliability of predicting the life cycle cost of individual bridges.

The Parameter Study of Serviceability Review of End Track on Railway Bridge installed Concrete Slab Track (콘크리트궤도 부설 교량의 단부 사용성 검토를 위한 매개변수 연구)

  • Sung, Deok-Yong;Kim, Young-Ha;Park, Yong-Gul;Kim, Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.117-124
    • /
    • 2008
  • Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. However, in case of railway bridge installed concrete slab track, the serviceability review of end deck should be performed for reducing the maintenance cost of track. The serviceability review of track contains that the compression force which is occurred on fastener of end bridge should be smaller than the compression force causing the deformation limit of elastic pad and the uplift force which is occurred on fastener of end abutment should be smaller than initial fastening force. Therefore, this study calculated the deflection and end rotation of the railway bridge according to the span length and stiffness of railway bridge and estimated the compression force and uplift force which are occurred on the track of end bridge using the finite element method. This study indicated the several diagrams that are contained the correlation between the behaviour of the track and the behaviour of the railway bridge. As a result, to reduce the end rotation of the railway bridge is very efficient to increase the height of railway deck.

  • PDF

Basic Study for Development of Risk Based Bridge Maintenance Priority Decision Model (위험도기반 교량 유지관리 우선순위 선정 모델 개발을 위한 기초연구)

  • Kim, Dongiin;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.108-116
    • /
    • 2017
  • It is expected that the maintenance cost of domestic bridges will increase considerably due to the increase of bridge service time. In response to this situation, the government and relevant ministries are focusing on developing ways to efficiently allocate limited budgets and to rationally select maintenance bridge. In this study, to develop a risk - based bridge maintenance priority decision model, 14 common risk factors causing damage to bridges were extracted and AHP analysis was performed to select 5 important factors. Based on the existing literature review and expert consultation, we derive the evaluation criteria and the impact weights of the selected factors, and based on this, I presented risk based bridge maintenance priority model. Using this model in combination with existing maintenance priority methods will lead to more reasonable bridge maintenance priorities.

The Analysis of User Cost according to Timing of National Highway Pavement Maintenance-Focusing on the Maesang Bidge Section in Korea

  • Kim, Yunsik;Lee, Minjae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.606-607
    • /
    • 2015
  • The traffic volume on the road shows various trends reflecting regional characteristics for monthly and hourly, and economic loss affecting users varies according to the selected period for the maintenance of road pavements. Therefore, in this study, the user cost (or delay cost) for monthly and hourly on the work zone near the Maesang Bridge Section on Poseung-Gu, Pyeongtaek-si, Gyeonggi-do was calculated using the time series models and VISSIM, and based on the result, the effect of user cost reduction according to the selection of best maintenance period was examined. The analysis result showed that the month of the lowest user cost occurred due to the maintenance of target section was January (10,293,258 KRW/Day×1km) and the month of the greatest user cost occurred was November (13,337,495 KRW/Day×1km).

  • PDF

Study about the Evaluation of Bridge Asset Valuation for Maintenance (유지관리를 위한 교량 시설물 자산 평가 방법에 대한 연구)

  • Lee, Dong Hyun;Kim, Joo Yeub;Ji, Seung-Gu;Lee, Sang Soon;Kim, Ji-won
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.13-23
    • /
    • 2012
  • PURPOSES : This study is to improve the highway management and rehabilitation efficiently by method for asset management. METHODS : Based on the literature review, The concept of this paper is to investigate the use of asset values from a Bridge management system to improvement of maintenance system more efficiently. This study is suggested for an evaluation method based on the current bridge condition by Written-down replacement cost of the assets. RESULTS : We suggests the optimization methodology of road asset valuation for budge distribution and performance measure. CONCLUSIONS : We evaluate all of national highway's bridge by the optimization methodology of road asset valuation, and suggest application methods of asset result.

The Methodology of Determination of the Allotment Ratio in Maintenance Cost on the Multi-Purpose Steel Bridge (복합이용 강교량의 유지관리비 분담비율 결정을 위한 방법)

  • Kim, Kyoung Nam;Lee, Seong Haeng;Jung, Kyoung Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.6
    • /
    • pp.747-758
    • /
    • 2006
  • With the growth of economy, the esthetic values of bridges become significant points in the decision process of a type of new bridges. So, it is common that a long-span bridge or a multi-purpose bridge are selected as the type of new bridges. Also, the economic growth derives increase in traffic and then the increased traffic derives multi purpose bridges from the decision process of bridge types. In the multi-purpose bridges with private fund, the construction cost is simply alloted to several organizations according to the percentage of participation and usage. But the allotment of the maintenance cost is not simple. Because the loads and safety factors in design are different between the criterion of design of highway bridges and that of railway bridges. In this study, we verify the possible problems in case of allotment method of maintenance cost in foreign examples as well as domestic example. As one of the method of determination of allotment ratio in maintenance cost, the method based on the stress of structural analysis is presented and it can be an example in the similar problem later.

The Model to Generate Optimum Maintenance Scenario for Steel Bridges considering Life-Cycle Cost and Performance (강교량의 최적 유지관리 시나리오 선정 모델)

  • Park, Kyung Hoon;Lee, Sang Yoon;Kim, Jung Ho;Cho, Hyo Nam;Kong, Jung Sik
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.6
    • /
    • pp.677-686
    • /
    • 2006
  • In this paper, a more practical and realistic method is proposed to establish the lifetime optimum maintenance strategies of the deteriorating bridges considering the life-cycle performance as well as life-cycle cost. The genetic algorithm is applied to generate the set of maintenance scenarios that is the multi-objective combinatorial optimization problem related to lifetime performance and cost as separate objective functions, and the technique to select optimum tradeoff maintenance scenario is presented. Optimum maintenance scenarios could be generated not only at the individual member level but also at the system level of the bridge. Through the analytical results of applying the proposed methodology to the existing bridge, it is expected that the methodology will be effectively used to determine the optimum maintenance strategy for introducing a real preventive maintenance system and overcoming the limits of existing maintenance methods.

Load Rating of Bridges and Load Test of Agricultural Slab Bridge (교량의 내하력 평가 및 농로교의 하중시험)

  • Yang, Seung-Ie;Kim, Han-Joong;Kim, Jin-Sung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.1
    • /
    • pp.239-249
    • /
    • 2003
  • The bridges, which were built between 20 and 30 years ago in rural area, have to support unexpected overload caused by excessive amount of transportation. For these rural bridges, repairs and replacements are needed. To avoid the high cost of rehabilitation, the bridge rating must correctly report the present load-carrying capacity. Rating engineers use Allowable Stress Design (ASD), Load Factor Design (LFD), and Load Resistance Factor Design (LRFD) to evaluate the bridge load carrying capacity. In this paper, the load rating methods are introduced, and it is illustrated how to use the load test data from literature survey. Load test is conducted to the bridge that was built 30 years ago in rural area. From load test results, new maintenance strategy is suggested instead of the bridge replacement.