• Title/Summary/Keyword: Bridge Application

Search Result 1,015, Processing Time 0.026 seconds

A Study on Dynamic Behaviors of Steel Plate Girder bridge with Applying External Post-Tensioning Method (외부 후긴장 공법 적용에 따른 무도상 판형교의 동적거동 분석)

  • Choi, Dong-Ho;Choi, Jung-Youl;Choi, Jun-Hyeok;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.160-168
    • /
    • 2006
  • The major objective of this study is to investigate the effects and application of external post-tensioning method far steel plate girder bridge. It analyzed the mechanical behaviors of steel plate girder bridge with applying external post-tensioning on the finite element analysis, field test and laboratory test fur the lateral dynamic characteristics. As a result, the reinforcement of steel plate girder bridge the external post-tensioning method are obviously effective for the lateral dynamic response which is non-reinforced. The analytical and experimental study are carried out to investigate the post-tension force decrease lateral acceleration and deflection on steel plate girder bridge for serviceability. And the external post-tensioning method reduce dynamic maximum displacement(about $10{\sim}24%$), the increase of dynamic safety is predicted by adopting external post-tensioning method. From the dynamic test results of the servicing steel plate girder bridge, it is investigated that the change degree of natural frequency is very low with applying the external post-tensioning method The servicing steel plate girder bridge with external post-tensioning has need of the reasonable reinforcement measures which could be reducing the effect of lateral dynamic behavior that degradation phenomenon of structure by an unusual response characteristic and a drop durability.

The smart PFD with LRB for seismic protection of the horizontally curved bridge

  • Kataria, N.P.;Jangid, R.S.
    • Smart Structures and Systems
    • /
    • v.17 no.5
    • /
    • pp.691-708
    • /
    • 2016
  • Recently, number of smart material are investigated and widely used in civil construction and other industries. Present study investigates the application of smart semi-active piezoelectric friction damper (PFD) made with piezoelectric material for the seismic control of the horizontally curved bridge isolated with lead rubber bearing (LRB). The main aim of the study is to investigate the effectiveness of hybrid system and to find out the optimum parameters of PFD for seismic control of the curved bridge. The selected curved bridge is a continuous three-span concrete box girder supported on pier and rigid abutment. The PFD is located between the deck and abutments or piers in chord and radial directions. The bridge is excited with four different earthquake ground motions with all three components (i.e. two horizontal and a vertical) having different characteristics. It is observed that the use of semi-active PFD with LRB is quite effective in controlling the response of the curved bridge as compared with passive system. The incorporation of the smart damper requiring small amount of energy in addition with an isolation system can be used for effective control the curved bridge against the dynamic loading.

A study on application of high strength steel SM570 in bridge piers with stiffened box section under cyclic loading

  • Kang, Lan;Suzuki, Motoya;Ge, Hanbin
    • Steel and Composite Structures
    • /
    • v.26 no.5
    • /
    • pp.583-594
    • /
    • 2018
  • Although a lot of experimental and analytical investigations have been carried out for steel bridge piers made of SS400 and SM490, the formulas available for SS400 and SM490 are not suitable for evaluating ultimate load and deformation capacities of steel bridge piers made of high strength steel (HSS) SM570. The effect of various parameters is investigated in this paper, including plate width-to-thickness ratio, column slenderness ratio and axial compression force ratio, on the ultimate load and deformation capacities of steel bridge box piers made of SM570 steel subjected to cyclic loading. The elasto-plastic behavior of the steel bridge piers under cyclic loads is simulated through plastic large deformation finite element analysis, in which a modified two-surface model (M2SM) including cyclic hardening is employed to trace the material nonlinearity. An extensive parametric study is conducted to study the influences of structural parameters on the ultimate load and deformation capacities. Based on these analytical investigations, new formulas for predicting ultimate load and deformation capacities of steel bridge piers made of SM570 are proposed. This study extends the ultimate load and deformation capacities evaluation of steel bridge piers from SS400, SM490 steels to SM570 steel, and provides some useful suggestions.

Development of Advanced Robot System for Bridge Inspection and Monitoring (교량유지관리 자동화를 위한 첨단 로봇 시스템 개발)

  • Lee, Jong-Seh;Hwang, In-Ho;Kim, Dong-Woo;Lee, Hu-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.90-95
    • /
    • 2007
  • Conventional bridge inspection involves the physical positioning of an inspector by the hydraulic telescoping boom of a "snooper truck" thereby providing visual access to bridge components. The process is time consuming, hazardous, and may be affected by lighting conditions, Therefore, it is of great interest that an automated and/or teleoperated inspection robot be developed to replace the manual inspection procedure. This paper describes the advanced bridge inspection robot system under development and other related activities currently undergoing at the Bridge Inspection Robot Development Interface (BIRDI). BIRDI is a research consortium with its home in the Department of Civil and Environmental System Engineering at Hanyang University at Ansan. Its primary goal is to develop advanced robot systems for bridge inspection and monitoring for immediate field application and commercialization. The research program includes research areas such as advanced inspection robot and motion control system, sensing technologies for monitoring and assessment, and integrated system for bridge maintenance. The center embraces 12 institutions, which consist of 7 universities, 2 research institutes, and 3 private enterprises. Research projects are cross-disciplinary and include experts from structural engineering, mechanical engineering, electronic and control engineering. This research project will contribute to advancement of infrastructure maintenance technology, enhancement of construction industry competitiveness, and promotion of national capacity for technology innovation.

  • PDF

Study of Thermal Bridge Breaker to Prevent the Thermal Bridge Effect on Metal Panel Roofs (금속패널지붕의 열교 방지를 위한 열교차단장치 개발 및 적용효과 분석)

  • Kim, Sun Ho;Jung, Chae Bong;Lee, Chung Shik;Kim, Jong Min;Kim, Byung Chul
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.20 no.2
    • /
    • pp.32-37
    • /
    • 2021
  • To realize a zero-energy building, a technology that minimizes the energy loss due to thermal bridges by preventing their formation is emerging as an important design factor. In this study, we develop a thermal bridge breaker to prevent thermal bridging in a metal panel roof and attempt to analyze the effects of its application. To this end, we fabricated a thermal bridge breaker and analyzed it in terms of its strength and heat-transfer characteristics, in addition to conducting a load simulation. The thermal bridge prevention effect of the developed thermal bridge breaker improved the insulation performance of the metal panel roof, and the results of a cooling/heating peak load simulation performed by applying the heat transmission resistance test results to a building proved the existence of this effect.

Passive control system for seismic protection of a multi-tower cable-stayed bridge

  • Geng, Fangfang;Ding, Youliang;Song, Jianyong;Li, Wanheng;Li, Aiqun
    • Earthquakes and Structures
    • /
    • v.6 no.5
    • /
    • pp.495-514
    • /
    • 2014
  • The performance of passive control system for the seismic protection of a multi-tower cable-stayed bridge with the application of partially longitudinal constraint system is investigated. The seismic responses of the Jiashao Bridge, a six-tower cable-stayed bridge using the partially longitudinal constraint system are studied under real earthquake ground motions. The effects of the passive control devices including the viscous fluid dampers and elastic cables on the seismic responses of the bridge are examined by taking different values of parameters of the devices. Further, the optimization design principle of passive control system using viscous fluid dampers is presented to determine the optimized parameters of the viscous fluid dampers. The results of the investigations show that the control objective of the multi-tower cable-stayed bridge with the partially longitudinal constraint system is to reduce the base shears and moments of bridge towers longitudinally restricted with the bridge deck. The viscous fluid dampers are found to be more effective than elastic cables in controlling the seismic responses. The optimized parameters for the viscous fluid dampers are determined following the principle that the peak displacement at the end of bridge deck reaches to the maximum value, which can yield maximum reductions in the base shears and moments of bridge towers longitudinally restricted with the bridge deck, with slight increases in the base shears and moments of bridge towers longitudinally unrestricted with the bridge deck.

Application of Narrow Steel Box Girder Bridge of Light Rail Transit with HR Plate (HR Plate의 경량전철 협폭박스거더교 적용)

  • Park, Dae-Su;Hwang, Nak-Yuen;Jung, Kyoung-Sup;Lee, Seong-Haeng
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.365-375
    • /
    • 2006
  • The HR Plates made hot rolled coils is lower than general structural steel plates in price. No difference between general steel plates and HR Plates with thickness up to 22mm are found in most characters such as cutting operation, fabrication and even welding. It can be concluded that HR Plates with thickness up to 22mm can be applied to flanges and webs of any girders as well as longitudinal ribs, longitudinal and vertical stiffeners of steel bridges appropriately. To increase the demand of HR Plates with thickness up to 22mm, it is necessary that HR Plates is applicable to full member in steel bridge including main girder.In this study, availabilities of the narrow steel box girder of light railway transit with HR Plate width as a main member are discussed. For application of HR Plate to steel bridge with 50m span or more, new support systems in three types are presented. Computational analysis is performed in 15 bridge models of light railway transit with beam element and plate element. As a analysis results, three models in light railway transit are presented. We finally come to the conclusion that HR Plates can be apply to narrow steel box girder in the light railway transit.

  • PDF

Type Suggestion and Parameter Study for Long-Span Bridge of High-Speed Railway without the REJ considering CWR Axial Force (장대레일 축력을 고려한 REJ 미적용 고속철도 특수교량 형식 제시 및 변수별 분석)

  • Lee, Jong-Soon;Joo, Hwan-Joong;Shin, Jai-Yeoul;Yoon, Sung-Sun;Park, Sun-Hee;Nam, Hyoung-Mo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1254-1261
    • /
    • 2011
  • Application of long-span bridge, which is affected by parameters such as span length, shoe boundary condition, track property and stiffness of superstructure and substructure etc., can vary. Especially, by CWR aspects of the axial force, long-span high speed railway bridges are limited at type and span length. In this study, in terms of CWR axial force, the long-span high-speed railway bridges without REJ(Rail Expansion Joint) is to propose the bridge type. Various Parameters analysis performed for the proposed type(Arch bridge, Cable-stayed bridge).

  • PDF

A Study on the Failure Behavior and the Application of Yield-Line Theory on the Bridge Decks Strengthened by Directional Fiber Plastic (일방향 섬유로 성능향상된 교량 상판의 파괴거동 및 항복선 이론을 적용한 해석적 연구)

  • 심종성;오홍섭;류승무
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.81-86
    • /
    • 2001
  • The concrete bridge decks are in need of replacement and rehabilitation due to decreasing load carrying capacity. In this study, to propose a strengthening technique that improves usability and structural performance of the bridge deck and to propose an efficient strengthening design technique which satisfies both the strength End serviceability of the bridge deck, this paper shows the failure characteristics of the strengthened bridge decks and proposes an empirical yield criterion. Therefore, strengthening efficiency was proposed based on the experiment and yield line analysis result. The yield line theory which adopts the modified criteria of Johansen is considered to predict the ultimate strength about all strengthening material(Carbon Fiber Sheet, Carbon Fiber Rod, Grid Type Carbon Fiber).

  • PDF

The Application of TMP Method on Suk-San Highway Bridge (석산육교 공동충전을 위한 가소상 모르타르 충진(TMP)공법 적용)

  • Han, Bog-Kyu;Shin, Gaon-Su;Cheong, Hai-Moon;Lee, Jea-Do
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.626-629
    • /
    • 2006
  • Suk-San highway bridge, located on a soft ground environment, had been examined the current condition of settlement estimation throughout G.P.R(Ground Penetrating Radar), general observation and visual observation(video camera & scope). According to the above observations, the ground of this area has sunk about thirty centimeters since 1996. Also, currently, Suk-San highway bridge has been disjoining the gap between the structure and ground. Therefore, it is necessary to fill it up the gap. The purpose of this paper is to report the effects of Sunk-San highway bridge was observed by G.P.R. & general observation etc. and to present the results of repair of Suk-San highway bridge filling the gap up.

  • PDF