• Title/Summary/Keyword: Breaking load

Search Result 139, Processing Time 0.032 seconds

Electromagnetic Transient Program Modeling for Analysis of Switching Over-Voltage on Shunt Reactor (분로리액터 개폐 과전압 해석을 위한 EMTP 모델링)

  • Oh, SeungRyle;Jun, InYoung;Han, KiSun;Kang, JiWon
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.6 no.4
    • /
    • pp.393-397
    • /
    • 2020
  • Shunt reactor, a facility for reactive power compensation, is switched several times a day depending on the load pattern. When the circuitbreaker opens the shunt reactor over-voltage is generated by several factors which degrade the insulating performance of internal parts of the circuit-breaker and cause severe voltage stress on the equipment in the power system. Transient phenomenon occurring during the switching of shunt reactor are available in laboratories that verify the performance of the circuit-breaker by simulating the power system. However, it is difficult to measure the transient phenomenon that occurs during actual operation in actual power system due to many limitations. Therefore, this paper deals with the modeling using EMTP to analyze the reignition and current chopping which causes more severe transient recovery voltage in the small inductive current breaking in actual power systems. In addition, this paper analyzes the main phenomenon that cause circuit-breaker failure in opening shunt reactor using EMTP model.

A Study on the Strength Evaluation Method of Submersible Mooring Pulleys for Detachable Mooring Systems (탈착계류시스템 반잠수식 무어링 풀리의 구조강도평가법에 관한 연구)

  • Kangsu Lee;Byoungjae Park
    • Journal of Wind Energy
    • /
    • v.15 no.1
    • /
    • pp.91-102
    • /
    • 2024
  • Rapid progress is being made in foundational technology research and engineering for the construction of floating offshore wind farms. There is active development of technology for detachable mooring systems, which have strengths in addressing maintenance issues that arise in floating offshore wind farms and enhance their economic viability. Conventional detachable mooring systems use Kenter links inserted into the middle of mooring chains, which require excessive time for retrieval by Anchor Handling Tug Supply (AHTS) vessels during detachment operations. Moreover, these operations pose risks of link damage and accidents. Therefore, there is a demand for the development of a new concept of detachable mooring systems. The proposed detachable mooring system in this study simultaneously integrates a fairlead chain stoppers (FCS) and submersible mooring pulleys (SMP), which enables all operations to be conducted on the AHTS vessel without underwater tasks. This study detailed the design and safety evaluation of the SMP, a core component of the detachable mooring system, based on the minimum breaking load (MBL) of selected mooring lines according to the capacity of the floating platform. It referenced international codes (AISC Specification for Structural Steel Buildings D5, Pin-Connected Members) for design verification and performed finite element analysis to evaluate the strength of major components in installation and operation scenarios. Additionally, procedures and techniques for evaluating the structural strength of components under uncertain boundary conditions were proposed.

A Study on the Properties comparison of the PVC Net and Expanded Metal Using Rockfall Protection Net Pullout Test Equipment (낙석방지망 인발시험을 이용한 PVC망과 Expanded Metal 특성비교에 관한 연구)

  • Cheon, Seongyeol;Lee, Seungho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.4
    • /
    • pp.49-57
    • /
    • 2009
  • The governmental investment to SOC facilities currently has increasedthe construction of new roads and the consistent extension of already-existing roads or the line-shape revision of those roads. As a result, the road cut slopes have been increasingrapidly. Unfortunately, human-life damages and property damages frequently occur due to the rockfall and the landslide every year. To reduce those damages, many studies have been performed. The present regulation regarding rockfall protection facilities follows the "Guide for Installation and Management of Road Safety Facilities" issued by MLTM (the Ministry of Land, Transport, and Maritime Affairs) that indicates the standard size of facilities and energy absorbing efficiencies. Most domestic road slopes use standardized rockfall protection facilities based on the regulation. However, there have been doubted about the effectiveness of rockfall protection facilities and the damages caused by rockfalls havebeen increasedevery year. Thus, it seems that relevant studies are necessary on the rockfall protection net being capable of supporting rockfall energies. Accordingly, this study reviews previous literature to investigate the function and the feature of rockfall protection nets and analyzetheir limitations by each type. After that, by using the pullout test device for a rockfall protection net, an experiment on the PVC coating net and the expanded metal is performed under the exact same condition. Finally, the features of the Expended metal is explained with the comparison analysises of load-variation and the confirmation of damaged forms. As a result, there have been founded the problemsof net breaking down and not being able to support due to PVC coating net's material property of disintegration. On the other hand, the Expanded Metal might be expected as a substituteof rockfall protection net according to its capability of support and integration.

  • PDF

Development of 115K Tanker Design Adopted Ice Class 1A (Baltic Ice Class IA를 적용한 115K Ice Tanker 개발)

  • Kim, Hyun-Soo;Ha, Mun-Keun;Baek, Myeong-Chul;Kim, Soo-Young;Park, Jong-Woo;Chun, Ho-Hwan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.41 no.6
    • /
    • pp.120-125
    • /
    • 2004
  • There are very few numbers of 115K FPP (Fixed Pitch Propulsion) Tankers for the Baltic ice class IA because the minimum power requirement of FMA (Finish- Swedish Maritime Association) needs quite large engine power and the 40 m Beam is out of calculation range of FMA minimum power requirements. The shipyard has no choice except to increase the engine power to satisfy FMA minimum power requirement Rule. And the operation cost, efficiency of hullform and its building cost are not good from the ship owners' point of view To solve this problem, the experience of ice breaking tanker development and the ice tank test results were adopted. The main idea to reduce the ice resistance is by reducing waterline angle at design load waterline. The reason behind the main idea is to reduce the ice-clearing force. Two hull forms were developed to satisfy Baltic Ice class IA. Two ice tank tests and one towing tank test was performed at MARC (Kvaener-Masa Arctic Research Center) and SSMB (Samsung Ship Model Basin) facilities, respectively. The purpose of these tests was to verify the performance in ice and open water respectively The hull form 2 shows less speed loss compared to Hull form 1 in open water operation but hull form 2 shows very good ice clearing ability. finally the Hull Form 2 satisfying Baltic ice class IA. The merit of this hull form is to use the same engine capacity and no major design changes in hull form and other related designs But the hull structure has to be changed according to the ice class grade. The difference in two hull form development methods, ice model test methods and analysis methods of ice model test will be described in this paper.

In vitro study of compressive fracture strength of Empress 2 crowns cemented with various luting agents

  • Kim Min-Ho;Yang Jae-Ho;Lee Sun-Hyung;Chung Hun-Young;Chang Ik-Tae
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.39 no.3
    • /
    • pp.260-272
    • /
    • 2001
  • All-ceramic restorations have had a more limited life expectancy than metal ceramic restorations because of their low strength. Their relatively lower strength and resistance to fracture have restricted the use of all-ceramic crowns to anterior applications where occlusal loads are lower. But there has been increasing interest in all-ceramic restorations because patients are primarily concerned with improved esthetics. Many efforts have been made to in prove the mechanical properties of dental ceramics. This study was designed to elucidate the influence of the luting agent on the strength of the Empress 2 crown (staining technique) cemented on human teeth. Seventy extracted human permanent molar teeth were chosen. Teeth were prepared for Empress 2 crowns with milling machine on a surveyor. A dental bur was placed in the mandrel that was positioned so that the long axis of the bur was perpendicular to the surveyor base. Dimensions of the Empress 2 crown preparation were $6^{\circ}$ taper on each side, $1.5{\pm}0.1mm$ shoulder margin, and 4mm crown height. The luting cements used in this study were as follow: 1. Uncemented 2. Zinc phosphate cements (Confi-Dental) 3. Conventional glass ionomer cement : Fuji 1 (GC) 4. Resin-modified glass ionomer cements : Fuji plus (GC) 5. Adhesive cements : Panavia F (Kuralay), Variolink II (Vivadent), Choice (Bisco). Fracture test using Instron. The crowns were loaded in compressive force to evaluate the effect of these cements on the breaking strength of these all-ceramic crowns. A steel ball with a diameter of 4mm was placed on the occlusal surface and load was applied to the steel ball by a cylindrical bolt with a crosshead speed of 0.5mm per minute until fracture occurred. The fractured surface was examined using Scanning Electron Microscopic Image (SEM) to discover the correlation between fracture strength and bonding capacity. Within the limitation of this in vitro study design, the results were as follows : 1. fomentations significantly increased the fracture resistance of Empress ceramic crowns compared to control. Uncemented (206.9 N): ZPC (812.9 N): Fuji 1 (879.5 N): Fuji Plus (937.7 N): Choice (1105.4 N): Variolink II (1221.1 N): Panavia F (1445.2 N). 2. Resin luting agent, treated by a silane bond enhancing agents, yielded a significant increase in fracture resistance. In some of the Panavia F group, a fracture extended into dentin. 3. According to SEM images of fractured Empress crowns, the stronger the bond at both interfaces(crown and die), the more fracture strength was acquired.

  • PDF

The Safety and Usefulness of Synthetic Absorbable Monofilament, Glycoside-$\varepsilon$-caprolactonetrimethylene Carbonate Interpolymer, in Gastrointestinal Anastomosis and Closure (위장관문합 및 봉합 시 인공 흡수성 단사인 Glycoside-$\varepsilon$- caprolactone-trimethylene Carbonate 혼성중합체의 안정성 및 유용성)

  • Lee Hyuk-Joon;Kim Yoon Ho;Yang Han-Kwang;Lee Kuhn Uk;Choe Kuk Jin
    • Journal of Gastric Cancer
    • /
    • v.3 no.2
    • /
    • pp.93-96
    • /
    • 2003
  • Purpose: Synthetic absorbable monofilaments offer excellent glide characteristics and cause minimal tissue trauma as a result of their smooth monofilament structure and gradual absorption within the healing tissues. For these reasons, these suture materials are commonly used in various surgical fields such as gastroenterology, urology, gynecology, and plastic surgery. The aim of this study was to evaluate the safety and usefulness of a new synthetic absorbable monofilament, Glycoside-..-caprolactone-trimethylene carbonate interpolymer (GCT), in gastrointestinal anastomosis and closure. Materials and Methods: We evaluated 55 gastrointestinal anastomoses and closures using GCT $MONOSYN^{R}$, B. Braun, Germany) in 47 patients who underwent gastric surgery between December 2001 and May 2002 at Seoul National University Hospital. Patient's characteristics, operative procedure, surgeon's opinion of handling properties of GCT, and suture-related complications were analyzed. Results: There were 34 males and 13 females (M:F= 2.6:1) with an average age of 54.2 years old. Forty-five cases of gastrointestinal anastomosis (20 gastrojejunostomies and 25 jejunojejunostomies) and 10 cases of intestinal closure (7 gastrostomy closures and 3 duodenal stump closures) were performed in 41 cases of stomach cancer, three of peptic ulcer disease, two of GIST, and one MALToma. The handling properties of GCT according to the criteria of knot breaking load, knot security, and placing property were always scored with 7 to 9 points (10=excellent, 1=very poor). Two cases of postoperative complications ($3.6\%$) were noted. One was a leak of the gastrojejunostomy site which was successfully managed conservatively, and the other was a stricture of the gastrojejunostomy site which was managed by reoperation (side-to-side jejunojejunostomy). Conclusion: GCT seems to be an applicable suture material for various gastrointestinal anastomoses and closures.

  • PDF

Development of Robotic Inspection System over Bridge Superstructure (교량 상판 하부 안전점검 로봇개발)

  • Nam Soon-Sung;Jang Jung-Whan;Yang Kyung-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.180-185
    • /
    • 2003
  • The increase of traffic over a bridge has been emerged as one of the most severe problems in view of bridge maintenance, since the load effect caused by the vehicle passage over the bridge has brought out a long-term damage to bridge structure, and it is nearly impossible to maintain operational serviceability of bridge to user's satisfactory level without any concern on bridge maintenance at the phase of completion. Moreover, bridge maintenance operation should be performed by regular inspection over the bridge to prevent structural malfunction or unexpected accidents front breaking out by monitoring on cracks or deformations during service. Therefore, technical breakthrough related to this uninterested field of bridge maintenance leading the public to the turning point of recognition is desperately needed. This study has the aim of development on automated inspection system to lower surface of bridge superstructures to replace the conventional system of bridge inspection with the naked eye, where the monitoring staff is directly on board to refractive or other type of maintenance .vehicles, with which it is expected that we can solve the problems essentially where the results of inspection are varied to change with subjective manlier from monitoring staff, increase stabilities in safety during the inspection, and make contribution to construct data base by providing objective and quantitative data and materials through image processing method over data captured by cameras. By this system it is also expected that objective estimation over the right time of maintenance and reinforcement work will lead enormous decrease in maintenance cost.

  • PDF

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

Numerical Simulation of Nonlinear Interaction between Composite Breakwater and Seabed under Irregular Wave Action by olaFlow Model (olaFlow 모델에 의한 불규칙파 작용하 혼성방파제-해저지반의 비선형상호작용에 관한 수치시뮬레이션)

  • Lee, Kwang-Ho;Bae, Ju-Hyun;Jung, Uk Jin;Choi, Goon-Ho;Kim, Do-Sam
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.31 no.3
    • /
    • pp.129-145
    • /
    • 2019
  • For the design of composite breakwater as representative one of the coastal and harbor structures, it has been widely discussed by the researchers about the relation between the behavior of excess-pore-water pressure inside the rubble mound and seabed caused by the wave load and its structural failure. Recently, the researchers have tried to verify its relation through the numerical simulation technique. The above researches through numerical simulation have been mostly applied by the linear and nonlinear analytic methods, but there have been no researches through the numerical simulation by the strongly nonlinear mutiphase flow analytical method considering wave-breaking phenomena by VOF method and turbulence model by LES method yet. In the preceding research of this study, olaFlow model based on the mutiphase flow analytical method was applied to the nonlinear interaction analysis of regular wave-composite breakwater-seabed. Also, the same numerical techniques as preceding research are utilized for the analysis of irregular wave-composite breakwater-seabed in this study. Through this paper, it is investigated about the horizontal wave pressures, the time variations of excess-pore-water pressure and their frequency spectra, mean flow velocities, mean vorticities, mean turbulent kinetic energies and etc. around the caisson, rubble mound of the composite breakwater and seabed according to the changes of significant wave height and period. From these results, it was found that maximum nondimensional excess-pore water pressure, mean turbulent kinetic energy and mean vorticity come to be large equally on the horizontal plane in front of rubble mound, circulation of inflow around still water level and outflow around seabed is formed in front of rubble caisson.