• 제목/요약/키워드: Breach time

검색결과 107건 처리시간 0.033초

댐 파괴형상에 따른 수문곡선 해석 (Analysis of Hydrograph by Dam Breach Shapes)

  • 박기범
    • 한국환경과학회지
    • /
    • 제16권4호
    • /
    • pp.487-493
    • /
    • 2007
  • In this study is analysis which dams breach shapes are effect on peak discharge of dam-failure. The dam breach shapes and failure time are important peak discharge when dam failure. When dam failure times are 1hr, 2hr and 3hr condition for the ECRD and 0.1hr and 0.2hr for the CG and CFRD that breach shapes changed base length $B_b=1Hd,\;B_b=2Hd\;and\;B_b=3Hd$. As the results from DAMBRK(Dam Break model) peak discharge are increase base widths lengthen. As failure time is longer then peak discharge is decrease. So peak discharge is increase more short of dam failure time. Also peak discharge is increase become larger dam breach shapes.

저수지 붕괴함수의 매개변수 결정이 유량과 침수범위에 미치는 영향 (Impact of Parameters of Nonlinear Breach Progression Curve on Outflow Rate)

  • 이길하
    • 한국환경과학회지
    • /
    • 제28권2호
    • /
    • pp.211-217
    • /
    • 2019
  • A Numerical modeling approach is usually applied to reproduce the physical phenomena of a fill dam-break. The accuracy of the dam-break model depends on the physical structure that defines input variables such as the storage volume, breach formation and progress, and the parameters of the model, which are subjective as they are prescribed by users. In this study, a sensitivity analysis was performed for the nonlinear breach progression curve that was already developed, which includes four parameters. The study focuses on the two of the parameters which control the breach forming time and peak discharge. The model is coupled with a two-dimensional flood simulation model (FLO-2D) to examine flood coverage and depth. It is generally observed that the parameter ${\beta}$ controls only the breach forming time, the parameter ${\gamma}$ is particularly sensitive to the peak flow.

국제물품매매계약에 관한 UN협약(CISG)상 근본적 계약위반과 이를 원용한 계약해제권과 대체품청구권에 관한 판례연구 (A Case Study on the Fundamental Breach of Contract and its Application for the Avoidance of Contract and Requiring Substitute Goods under the CISG)

  • 박은옥
    • 무역상무연구
    • /
    • 제66권
    • /
    • pp.47-73
    • /
    • 2015
  • This study primarily concerns the fundamental breach of contract by a seller and a buyer's two remedies that are entitled to under the CISG. Regarding the breach of contract, the CISG simply provides a list of each party's obligations and regulates that both parties should fulfill the obligations under the contract as well as the Convention. When the CISG specifies the remedies for both parties, it requires to divide the fundamental breach of contract from breach of contract. By doing so, it provides different remedies to both parties depending on whether it is the fundamental breach of contract or not. From the point of buyer's view, the buyer has two remedies when there is the fundamental breach of contract by the seller; they are the right to declare the avoidance of contract and to require the delivery of substitute goods. The fundamental breach of contract is a pre-requisite condition to be fulfilled in order to exercise these two remedies. Although the CISG provides the definition of fundamental breach of contract, its meaning is not clear enough, so it is interpreted and applied case by case. Therefore, this paper will analyze recent cases focusing on the most debated issues regarding the interpretation of fundamental breach of contract; first, who determines the substantial deprivation and when is the time for determination, second, when is the time for unpredictability of substantial deprivation, and last, who has a burden of proof.

  • PDF

국제해상운송계약상 정기용선계약의 조기반선계약위반으로 인한 손해배상액의 산정문제에 관한 연구 (Study on Assessment of Damage arising from Breach of Contract for Early Redelivering Vessel of Time Charterers under International Contract of Transport by Sea)

  • 주세환;한낙현
    • 무역학회지
    • /
    • 제45권1호
    • /
    • pp.119-135
    • /
    • 2020
  • It is well-known that if a claim for damage [Note: Damage can be singular or plural] is made based on a breach of contract, calculating the existence and magnitude of certain profits to be deducted based on the damage can be problematic. In the case of a time charter party, even if the early redelivering vessel by the time charterers constitutes a breach of contract, it is still not an exception. In particular, interest in the shipping business seems to be relatively high in terms of how claims for damage by ship owners have been adjusted. In the case of the New Flamenco, there is a debate over whether or not to deduct the difference between the sale price immediately after redelivering the ship and the sale price upon expiration of the contract from the damage based on the breach of contract for the early time charter redelivery vessel. This paper focuses on this case since it appears to be of practical importance and has implications on how to calculate the amount of damage in the case of cancellation for early redelivery vessel in a time charter party.

Volatility clustering in data breach counts

  • Shim, Hyunoo;Kim, Changki;Choi, Yang Ho
    • Communications for Statistical Applications and Methods
    • /
    • 제27권4호
    • /
    • pp.487-500
    • /
    • 2020
  • Insurers face increasing demands for cyber liability; entailed in part by a variety of new forms of risk of data breaches. As data breach occurrences develop, our understanding of the volatility in data breach counts has also become important as well as its expected occurrences. Volatility clustering, the tendency of large changes in a random variable to cluster together in time, are frequently observed in many financial asset prices, asset returns, and it is questioned whether the volatility of data breach occurrences are also clustered in time. We now present volatility analysis based on INGARCH models, i.e., integer-valued generalized autoregressive conditional heteroskedasticity time series model for frequency counts due to data breaches. Using the INGARCH(1, 1) model with data breach samples, we show evidence of temporal volatility clustering for data breaches. In addition, we present that the firms' volatilities are correlated between some they belong to and that such a clustering effect remains even after excluding the effect of financial covariates such as the VIX and the stock return of S&P500 that have their own volatility clustering.

댐붕괴시 홍수가 하천하류에 미치는 영향 (The Effect of Flood Discharge due to Dam Breach on Downstream Channel)

  • 안상진;이준근;연인성;유형규
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.1666-1670
    • /
    • 2006
  • The purpose of this study is to analyze how a downstream channel is affected in case of hypothetical dam failure. The object of it is Hwacheon dam basin within the basin of North Han river. This study has analyzed the influence on Pyeonghwa(Peace) dam and Hwacheon dam supposing that the Imnam dam in North Korea on the upper stream of North Han river is failed hypothetically at the MFWL(maximum flood water level) by a deluge of rain. The model applied at the main study is NWS(National Weather Service) FLDWAV(Flood Wave Routing Model). Dam breach characteristics data are analyzed by making nine hypothetical scenarios on the basis of other studies on the shape and size of dam breach, time of failure and so on. Expected peak discharge through the breach is verified to have the propriety in comparison with empirical function which is developed on the basis of the case of dam breach in the foreign countries and it is observed that peak discharge is more increasing, as the time of breach gets shorter and the breach width gets bigger. As a result of main study, even though the Imnam dam is hypothetically failed down, there has no influence on the Hwacheon dam of the downstream as the extended Pyeonghwa dam on the downstream controls the volume of discharge properly.

  • PDF

영국 2015년 보험법 상 담보(워런티)에 관한 연구 (A Study on Warranty in The Insurance Act 2015)

  • 신건훈;이병문
    • 무역상무연구
    • /
    • 제73권
    • /
    • pp.65-90
    • /
    • 2017
  • The rule of warranty in English insurance law was established in the second part of the $18^{th}$ century by Lord Mansfield, who laid the foundations of the modern English law of insurance contract and developed very different rule of insurance law, especially in the field of warranty. At the time of Lord Mansfield, warranty, that is, the promise given by the assured, played an important role for the insurer to assess the scope of the risk. Legal environments, however, have changed since the age of Lord Mansfield. English and Scottish Commissions proposed very dramatic reform of law in the field of warranty law to reflect the changes of legal environment through the Insurance Act 2016. This article intends to consider the legal implications through the comparative analysis between the new regime of warranty in the Insurance Act 2015 and MIA 1906. The major changes in the Insurance Act 2015 are summarized as following. First, Basis of the contract clauses in non-consumer insurance contracts should be of no effect and representations should not be capable of being converted into warranties by means of a policy term or statement on the proposal form. This requirement should not be capable of being avoided by the use of a contract term and the arrangement of contracting out by parties should be of no effect. Secondly, The existing remedy for breach of warranty, that is, automatic discharge of the insurer's liability, should be removed. Instead, the insurer's libility should be suspended from the point of breach of warranty and reattach if and when a breach of warranty has been remedies. Thirdly, A breach of warranty should genally be regarded as remedied where the insured ceases to be in breach of it. In the other hand, for time-specific warranties which apply at or by an ascertainable time, a breach should be regarded as remedies, if the risk to which the warranty relates later, becomes essentially the same as that originally contemplated by the parties. Fourthly, where a term of an insurance contract relates to a particular kind of loss, or loss at a particular location/time, the breach of that term should only give the remedy in relation to loss of that particular kind of loss, or at a particular location/time. Finally, whether a term of an insurance contrat relates to loss of a particular kind of at a particular location/time should be determined objectively, based on whether compliance with that ther would tend to reduce the risk of the occurrence of that category of loss.

  • PDF

국제물품매매에서 이행기전 계약위반에 대한 구제권 연구(사례를 중심으로) (A Study on the Remedial Cases of Anticipatory Breach in int'l Sales)

  • 하강헌
    • 무역상무연구
    • /
    • 제39권
    • /
    • pp.3-26
    • /
    • 2008
  • CISG provides the Convention's default provisions on anticipatory breach. Article 71 permits the aggrieved party to suspend the performance of his obligations if it becomes apparent that the other party will not perform a substantial part of his obligations after the conclusion of the contract. The aggrieved party must give notice of the suspension to the other party and if he provides adequate assurance of his performance, the party must continue with performance. Article 72 authorizes the aggrieved party to avoid the contract to the date of performance when it is clear that the other party will commit a fundamental breach. The aggrieved party is also required to give the other party notice of his intent to avoid the contract if time allows. The requirements for avoidance under Article 72 are more stringent than those for suspension under Article 71. Article 72 requires reasonable prior notice only if time allows, while article 71 requires immediate notice with no exceptions.

  • PDF

신소재 활용 제방의 월류 붕괴 경감 효과 분석 (Analysis of Breach Mitigation Effect on Levee made with New Substance by Overtopping)

  • 고동우;강준구
    • 한국산학기술학회논문지
    • /
    • 제19권2호
    • /
    • pp.1-8
    • /
    • 2018
  • 최근 전 세계적으로 이상기후에 따른 국지성 폭우로 인한 홍수 발생과 하천제방의 노후화로 인하여 제방이 소실되고 저지대에서의 엄청난 재산 피해 및 인명 피해가 발생되고 있다. 특히 월류에 의한 제방붕괴는 약 40%에 달하는 것으로 보고되고 있다. 본 연구는 월류에 의한 제방붕괴의 원인 및 메커니즘을 파악하기 위해 수리모형실험을 수행하였고 제방의 내구성 향상을 위한 친환경 신소재인 바이오폴리머를 이용하여 월류에 따른 제방사면의 안정성 및 붕괴지연효과 등을 평가하였다. 영상계측장치를 이용한 실험분석 결과, 제방사면에 신소재 적용 시 총 제방붕괴시간은 흙 제방과 비교했을 때 약 2.25배의 차이를 보였고 신소재가 적용되지 않은 흙 제방의 경우 초기 붕괴발달속도가 약 1.43배 빠르게 나타났으며 시간이 지날수록 제체가 급격하게 붕괴되는 것을 관찰할 수 있었다. 또한 신소재 적용 제방의 붕괴메커니즘은 흙 제방에 비해 확연히 다르게 나타났으며 월류 흐름에 저항하여 사면침식속도를 경감시킴으로써 급격한 제체붕괴 예방이 가능한 것으로 평가되었다.