• Title/Summary/Keyword: Boring investigation

Search Result 82, Processing Time 0.03 seconds

A Study on the Optimal Setting of Large Uncharged Hole Boring Machine for Reducing Blast-induced Vibration Using Deep Learning (터널 발파 진동 저감을 위한 대구경 무장약공 천공 장비의 최적 세팅조건 산정을 위한 딥러닝 적용에 관한 연구)

  • Kim, Min-Seong;Lee, Je-Kyum;Choi, Yo-Hyun;Kim, Seon-Hong;Jeong, Keon-Woong;Kim, Ki-Lim;Lee, Sean Seungwon
    • Explosives and Blasting
    • /
    • v.38 no.4
    • /
    • pp.16-25
    • /
    • 2020
  • Multi-setting smart-investigation of the ground and large uncharged hole boring (MSP) method to reduce the blast-induced vibration in a tunnel excavation is carried out over 50m of long-distance boring in a horizontal direction and thus has been accompanied by deviations in boring alignment because of the heavy and one-directional rotation of the rod. Therefore, the deviation has been adjusted through the boring machine's variable setting rely on the previous construction records and expert's experience. However, the geological characteristics, machine conditions, and inexperienced workers have caused significant deviation from the target alignment. The excessive deviation from the boring target may cause a delay in the construction schedule and economic losses. A deep learning-based prediction model has been developed to discover an ideal initial setting of the MSP machine. Dropout, early stopping, pre-training techniques have been employed to prevent overfitting in the training phase and, significantly improved the prediction results. These results showed the high possibility of developing the model to suggest the boring machine's optimum initial setting. We expect that optimized setting guidelines can be further developed through the continuous addition of the data and the additional consideration of the other factors.

S-wave Velocity Analysis and Each Survey Comparison of Soft Ground in HoNam High-Speed Railway (호남고속철도 연약지반구간의 전단파 속도분석과 탐사법 비교)

  • Min, Kyong-Nam;Lee, Il-Hwa;Jung, Dae-Ho;An, Tae-Bong;Jung, Chan-Mook
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.387-394
    • /
    • 2007
  • This study area located in HoNam High-Speed railway soft ground section. So it carried out the boring survey, field survey and test of laboratory. It collected the engineering data of ground and the data for the establishment arrangement. The investigation did a soil investigation in Nonsan. The investigation item excuted seismic piezocone penetration test, s-wave seismic refraction survey, ps logging test, density logging test which is a physical exploration and boring. Eventually, results of geotechnical and shear-wave survey are useful for ground information in soft ground that has identified the characteristics of geological responses and elastic modulus.

  • PDF

Improvement on the estimation of workable-quantity per unit time for boring machine (기초공사 천공기계 시간당작업량 산정 개선방안)

  • Ahn, Bang-Ryul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.138-139
    • /
    • 2015
  • Human productivity of Boring Machine for stack is provided but not its hourly workable quantity(Q-value) in the Equipment ownership cost and expenses section of the Poom-Same that is used for construction cost estimation of public sectors in Korea, which leads to less realistic and subjective estimation for the works. The optimized Q-value of the machine is proposed as a result of thorough investigation into many of its operations.

  • PDF

A case study of large-scale slope failure in Granite - Andesite contact area (화강암-안산암 접촉부 대규모 사면의 붕괴 사례 연구)

  • 이수곤;양홍석;황의성
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.503-508
    • /
    • 2003
  • In this study, we peformed ahead a field geological investigation, boring investigation for slope stability analysis in large scale slope failure area. But the geological stratum was not clearly grasped, because ground was very disturbed by large scale Granite intrusion. Furthermore, the existing test data was not pertinent to the large scale Granite intrusion site like here. Therefore, various kind of field test were performed to grasp clearly for geological stratum. And the results of back analysis, various kind tests used to slope stability analysis.

  • PDF

Investigation of Physical and Mechanical Properties for a Central Core Rockfill Dam (중심코아형 록필댐 제체의 물리적 및 역학적 특성 조사)

  • 신동훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.345-350
    • /
    • 1999
  • In this study the results of investigation on the physical and mechanical properties of a rockfill dam body were provided. On the crest of the old Namgang dam to be excavated partially, various in-situ tests(boring with SPT, sampling of undisturbed sample, field density test, field permeability test) and geophysical investigation works were performed Rock materials, i.e., shale and sandstone, were collected, and their slake durability was evaluated using slaking durability testing method which is suggested by ISRM.

  • PDF

Boring Insects of the Pinus densiflora S. et Z. in Korea (소나무를 가해(加害)하는 천공성해충(穿孔性害蟲)에 관(關)한 연구(硏究))

  • Lee, Chan-Young;Lee, Sang-Bae
    • Journal of Korean Society of Forest Science
    • /
    • v.89 no.5
    • /
    • pp.609-617
    • /
    • 2000
  • To inverstigate the boring insects in Pinus densiflora forests, bait logs were set up in healthy-looking forests of Chunchon Hongchon and in damaged forests(gall formation rate 70----) by Thecodiplosis japonensis of Pyongchang Jeongsun. The period of investigation was from April to August in 1999. Boring insects investigated were 35 species of 12 families. Five species of them were unrecorded species from Korea. Natural enemies investigated were 5 species of 2 families. The prefered parts of tree according to species of boring insects were lower trunk in Siphalinus gigas and 3 other species, middle-stem in Monochamus sutor and 7 other species, and top stem in Orthotomicus suturalis and 1 other species. Hylurgops interstitialis were found in all parts of tree. Sap wood was attacked by Xyleborus validus Cerambycidae, heart wood by Hylobitelus haroldi Siphalinus gigas, and cambium region by Pissodes nitidus P. obscurus Shirahoshizo insidiosus Scolytidae.

  • PDF

A Case Study on Penetrating Hard Rock with Alternative Methods of Shield TBM for Weathered Layer in Subway Construction (지하철공사에서 풍화대용 쉴드 TBM의 경암 구간 굴진 시 대체공법에 대한 사례연구)

  • Park, Hyung-Keun;Ko, Won Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.623-629
    • /
    • 2010
  • Recently, the Shield TBM (Tunnel Boring Machine) construction method is used gradually to increase at the Tunnel Constructin site. However the design and application of the Shield TBM were carried out without sufficient investigation of the ground conditions in the construction site. Due to insufficient understanding to the corresponding equipment is frequently occurring unexpected construction cost and extension of a construction period. The most suitable alternative construction method was determined by analyzing tunneling rate, duration, construction cost of shield machine and tunneling data of alternative method. The result of the case study is suggested as follows. First, the accurate soil exploration on the construction site should be preceded to prevent from tunneling stoppage and schedule delay. Second, the most suitable selection of the shield machine to the ground conditions of the construction site should be executed based on the investigation. Third, the best alternative method for boring of hard rock section is 'hard rock blasting after open cut and cover method'.

Comparison of Accuracy according to Interpolation for Geotechnical Information using GIS (지형공간정보체계를 이용한 지반정보의 보간 방법 정확도 비교)

  • 이종출;강인준;김희규;노태호
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.04a
    • /
    • pp.407-412
    • /
    • 2004
  • As develop of civilization many structure and facilities will constructed forever scientifically and systematically. The prerequisite of those construction have been behaved with plan and investigation of field. When investigation method that ground of distribution and character for many structure are various, many parts of various method have been conducted by the boring method in order to condition, distribution and character for ground. And indirected method of ground investigation data have been interpolated, various methods have been conducted in method of interpolation. Therefore, in this study, we would estimate efficiency that accuracy according to interpolation using the data of ground information by comparable unique density.

  • PDF

A Study on the Reinforcement Case of Bridge Foundation in the Limestone Cavity with CGS Method (CGS 공법 적용 석회암 공동지역의 교량기초보강 사례 연구)

  • Park, Sungsu;Hong, Jongouk;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.12
    • /
    • pp.43-52
    • /
    • 2013
  • Limestone typically forms large caverns such as reticular caverns or limestone caves, and also forms sinkhole and doline. These caverns cause different settlement when constructing roads, dams, etc. because the foundation cannot sustain the upper structures. So it is necessary to reinforce foundation such as cavern filling method, etc. In this study, ground reinforcement for structure foundation was carried out using CGS method in limestone cavity area and evaluation of reinforcement effect from engineering viewpoint was conducted through the field test. Among others, boring test was carried out to identify the ground structure and engineering characteristics. After CGS reinforcement, boring test was conducted for supplementary verification, and with reinforcement core taken during boring test, rock test was carried out to identify the physical properties of reinforcement material. After applying CGS method, rock test of the typical specimen, among reinforcement cores, taken from boring test was carried out and physical properties of the reinforcement was identified. As a result of compressive test of core sample, material inside the cavity was filled properly, indicating compressive strength of 12.2~19.2(MPa) which was evaluated acceptable. Thus the limestone cavity proved to have been reinforced successfully.

Analysis on the efficiency of underwater SPT module and stability for seabed type geotechnical investigation equipment (무인 착저식 지반조사 장비의 안정성 검토 및 수중 SPT효율 분석)

  • Kim, Woo-Tae;Jang, In-Sung;Ko, Jin-Hwan;Shin, Chang-Joo;Kwon, O-Soon;Lee, Seung-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.3
    • /
    • pp.1778-1785
    • /
    • 2014
  • In order to construct offshore structures safely, geotechnical investigation should be carried out with high accuracy. Up to now, onshore geotechnical investigation equipments installed on the barge are used for offshore geotechnical investigation. In this case, many limitations can be confronted such as deep water depth, high wave, strong current, severe wind and so on. For the safe and economic offshore geotechnical investigation with high precision, a seabed type unmanned automated site investigation equipment is developed. It can be operated remotely underwater conditions with 100m water depth and can explore the ground depth of 50m. Also, the standard penetration test (SPT), soil boring, soil sampling and rock coring can be possible using the equipment. Numerical analysis was conducted to secure the stability of the equipment against current of 4 knot. Energy efficiency of SPT apparatus which is attached to the equipment shows 78% in average.