• Title/Summary/Keyword: Boring

Search Result 584, Processing Time 0.027 seconds

Slope Stability Assessment for Colluvial Soil Slumps of the Danyang Region (단양지역 붕적토 붕괴사면의 안정평가)

  • Bae, Woo-Seok;Lee, Bong-Jik;Jang, Kwang-Tak
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.3 s.81
    • /
    • pp.74-80
    • /
    • 2007
  • In this study, a documentary survey, face mapping, and stability analysis were performed on the collapsed colluvial soil slope. The purpose of this paper is to identify the cause of slope failure and determine slope stability for similar areas. Boring samples were extracted from the slump and laboratory tests were performed to find out the cause of slope failure. In addition, the limit equilibrium method was used in order to determine the stability of the slope. As a result of this investigation and the analysis of data, the type of collapse and cause of slope failure have been shown to have a strong correlation with the natural geographical and geological features which make up the collapse profile of the study area. These results will help to develop guidelines for formulating countermeasure methods.

기술현황분석 : 고속 터널굴착과 터널보링머신 동향

  • Jang, Su-Ho;Lee, Yong-Beom
    • 기계와재료
    • /
    • v.21 no.4
    • /
    • pp.96-105
    • /
    • 2010
  • 도로 및 철도는 차량의 고속화와 신속한 물류의 유통을 위해 직선 및 수평화가 절실하게 요구되며, 국내 건설구간의 약 50~70%가 산악지형으로서 터널공사가 필수적으로 요구된다. 국내터널굴착은 주로 발파에 의한 NATM(New Austrian Tunneling Method)으로 공사가 이루어지고 있으나, 굴착효율이 낮으며 안전사고의 위험성이 높다. 해외에서는 급속한 시공을 위하여 TBM(Tunnel Boring Machine)의 적용 사례가 증가하고 있다. 그러나 국내에는 TBM에 대한 연구가 전무한 상태이고, TBM 터널의 설계 시공 기술과 경험이 미흡하다. 최근 대도시의 지하터널과 장대터널의 수요가 증대되어 TBM터널시공 기술과 TBM장비의 국산화가 절실하게 요구되고 있다. 본고에서는 국내외 주요 TBM 시공현황과 전망을 정리하여 TBM 터널 기술의 확보가 매우 시급함을 상기시키고자 하였다.

  • PDF

TBM 터널과 NATM 터널의 초 근접시공 사례

  • 이인기
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.1 no.2
    • /
    • pp.161-170
    • /
    • 1999
  • 본고에서는 $1986.8\~1988.7$월중에 시공된 부산지하철 1호선 3단계 건설구간 중 서대신동 로타리에서 괴정국민학교 앞까지 연${\cdot}$경암지역에서의 TBM(Tunnel Boring Machine)으로 시행된 단선터널(7.0m)과 NATM으로 시행한 복선터널의 근접시공에 따른 간벽부 보강설계 내용과 근접부 시공시 계측결과 분석, 지보 Pattern조정 및 시공 실적 등을 제시하였다. 원설계 내용 분석 결과 지보 Pattern이 현장 지반조건에 비해 과다하였고 TBM 굴진시 Thrust 2500kN(본 기계 기준) 이상인 연암이상의 지반에서는 TBM 굴착으로의 효율성이 있었고, 경암구간에서 병행터널의 간섭영향을 배제하려면 터널간의 중심거리가 터널직경의 2배 이상이 되어야 하며, TBM 단선터널(7.0m)의 일 평균 굴진 길이는 4.6m로 분석되었다. 앞으로 이와 유사한 암층에서의 터널근접 시공 및 TBM 굴착시 본 분석내용이 참고가 되기를 기대하여 본고를 작성하였다.

  • PDF

Influence of TBM operational parameters on optimized penetration rate in schistose rocks, a case study: Golab tunnel Lot-1, Iran

  • Eftekhari, A.;Aalianvari, A.;Rostami, J.
    • Computers and Concrete
    • /
    • v.22 no.2
    • /
    • pp.239-248
    • /
    • 2018
  • TBM penetration rate is a function of intact rock properties, rock mass conditions and TBM operational parameters. Machine rate of penetrationcan be predicted by knowledge of the ground conditions and its effects on machine performance. The variation of TBM operational parameters such as penetration rate and thrust plays an important role in its performance. This study presents the results of the analysis on the TBM penetration rates in schistose rock types present along the alignment of Golab tunnel based on the analysis of a TBM performance database established for every stroke through different schistose rock types. The results of the analysis are compared to the results of some empirical and theoretical predictive models such as NTH and QTBM. Additional analysis was performed to find the optimum thrust and revolution per minute values for different schistose rock types.

The Job Analysis of milling in the Local Skill Contest in 1996 (96 지방 기능 경기대회 밀링 과제 분석)

  • 이광재
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 1996.03a
    • /
    • pp.18-23
    • /
    • 1996
  • The Job of Milling in the Local Skill Contest in 1996 was to assemble parts into a complete whole of the parts number 1, 3, 4 worded by Milling Machine and the parts number 2 worked by Machining Center. In the parts of Milling Machine, the Job was to work 45$^{\circ}$angle working, T-slot, dovetail, the correct position drilling, rimming, boring, etc. In the Machining Center, there were the way of calculation of point of contact of 'R' contour curved line and lots of working elements. So, it was possible to work the parts and assemble them within the time limit only through the program to be made out in the way to shorten working hours.

  • PDF

A study on the 3-dimensional behavior of shaft by the RBM reaming (RBM 굴착에 따른 수직구의 3차원적 거동 연구)

  • 조만섭;이석원;마상준
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.717-724
    • /
    • 2002
  • To investigate the behavior of air-shaft and existing tunnel by excavating the small-diameter shaft into the existing tunnel, prototype air-shaft was constructed and analyzed in this study. Geotechnical characterization was conducted by boring and rock cores obtained were tested in the laboratory. Field monitoring including radial and tangential stresses and displacements was conducted with the 3-dimensional numerical analysis of prototype air-shaft. Results of field monitoring were compared with the numerical results. The results showed that maximum displacement of 2.11mm and maximum tangential stress of 54.0 kg/$\textrm{cm}^2$ were obtained during shaft excavation near the right shoulder of the existing tunnel. The comparison of these field measurements with 3-dimensional numerical analysis showed that much more higher stress was measured during excavation compared to the numerical results even though the trends of stress and displacement were similar.

  • PDF

한강 하저터널에서의 암반분류 및 평가사례

  • 박남서;이치문;김은섭
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06b
    • /
    • pp.165-193
    • /
    • 2003
  • The Han River tunnel connecting Yoido and Mapo was constructed as a part of the Seoul subway line No.5, which is 52 km long, to improve the traffic conditions of Seoul. It is constructed 15.6∼30m below the river floor. It Is the first under-river tunnel in Korea with the length of 1,288m. Geological conditions of the ground under the Han River were more complex and irregular than expected at the design stage, because there were several faults, fracture zones and slickensided joints coated with graphite. It was thus indispensable to estimate the ground condition of the tunnel face to apply proper excavation and reinforcement methods. Advance borings and face mappings were performed before excavation to improve constructional efficiency and excavation stability.

  • PDF

A Study on the Characteristics of BTA Deep Drilling for Marine Part Carbon and Alloy Steels

  • Sim, Sung-Bo;Kim, Chi-Ok
    • International Journal of Ocean Engineering and Technology Speciallssue:Selected Papers
    • /
    • v.3 no.1
    • /
    • pp.40-48
    • /
    • 2000
  • The term "deep holes" is used to describe the machining of holes with a relatively large length to diameter ratio. The main feature of BTA deep hole drilling is the stabilization of cutting force necessary for the self guidance of the drill head. An additional feature is the cutting tool edges that are unsymmetrically placed on the drill head. There is an increasing necessity to predict the hole geometry and other dynamic stability behavior of deep hole drilling guidance. In this study, the effects of BTA deep hole drilling conditions on the hole profile machined piece are analyzed using domain analysis technique. The profile of deep hole drilled work piece is related to cutting speed, feed rate, chip flow, tool wear, and so on. This study deals with the experimental results obtained during the BTA drilling on SM45C, SM55C carbon steels and SCM440 steels under various cutting conditions, and these results are compared with analytical evaluations.aluations.

  • PDF

A Study on the Deep Hole Drilling for Refractory Metals - STS type BTA drilling for SKD11 high alloy tool steel (난삭재의 심공가공에 관한 연구 (SKD11고합금공구강에 대한 STS타입 BTA드릴 가공))

  • Sim, Sung-Bo;Kim, Chi-Ok;Kim, Cheol-Kyu
    • Journal of Ocean Engineering and Technology
    • /
    • v.13 no.1 s.31
    • /
    • pp.70-78
    • /
    • 1999
  • 오늘날 기계공업 현장에서 심공드릴가공은 광범위한 응용과 양호한 생산성으로 인하여 그 요구가 증가 되고 있다. 그러므로, 본 연구는 난삭재인 SKD11고합금공구강을 여러가지 절삭조건하에서 BTA드릴가공하여 얻은 실험결과(표면조도, 진직도, 진원도, 원통도, 구멍확대량, 등)를 다루었으며 이들의 이론적 배경과 실험을 비교 분석하였다. 프레스금형 부품과 기계부품으로 사용되고 있는 SKD11고합금공구강은 기계가공이 힘든 난삭재료로서 그 어려움이 크므로 본 연구는 생산현장에 보다 나은 심공드릴가공결과와 관련 지식을 제공 할수 있다고 사료된다.

  • PDF

Stability Evaluation for a riverbed tunnel in the Han River at the Fault Zone Crossing (한강 단층대를 통과하는 하저터널의 안정성 확보에 관한 연구)

  • Woo, Jong-Tae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.225-231
    • /
    • 2001
  • When building tunnels beneath riverbeds where very large quantities of groundwater inflow exist, added to high water head the soil supporting conditions are very poor because the soil consists of sand and silt, etc. It is necessary to have grouting and mini pipe roof installed in the region for ground reinforcement to decrease permeability. According to this result of horizontal boring and laboratory soil testing, ground reinforcement was achieved by L.W grouting for range of 3.0 times the tunnel radius, to increase stability of the tunnel we used the ling-cut method, 0.8m for one step excavation, shotcrete with 25cm thick, steel lib with H-$125{\times}125$. and a temporary shotcrete invert 20cm thick was installed to prevent deformation of the tunnel.

  • PDF