• Title/Summary/Keyword: Boring

Search Result 596, Processing Time 0.022 seconds

Shell Necrosis of Haliotis discus hannai by Mastigocoleus sp. (Cyanophyta) in Korea (남조류, Mastigocoleus sp.에 의한 한국산 참전보의 패각 괴사증)

  • 최상덕;윤장택;조용철
    • Journal of Aquaculture
    • /
    • v.11 no.4
    • /
    • pp.465-474
    • /
    • 1998
  • Shell necrosis, which is found in the juvenile stage of Haliotis discus hannai in th culture process, was examine in this study. In the necrosis shell, bacteria of rod type and a blue green algal species with heterocyst were observed. However, it appears to be caused by a boring blue green alga, Mastigocoleus sp., as based on SEM data. At the time of its infection, the shell was discolored from green into bright-grey, and then began to be brittle at the 4th to 6th breathing hole. After 60 days of culture, necrosis occurred in the breathing holes with many brown tiny colony, and continued to 3 years after culture. This shell necrosis was found in the tank culture system in land rather than in the cage culture system in sea, and greatly affected to the growth of Haliotis discus hannai, resulting in very small size of 16mm in 3 year old shell.

  • PDF

Natural Enemies of Wood Borers and Seasonal Occurrence of Major Natural Enemies of Monochamus saltuarius on Pine Trees (소나무류 천공충의 천적종류 및 북방수염하늘소 주요천적의 발생소장)

  • Kim, Jong-Kuk;Won, Dae-Sung;Park, Yong-Chul;Koh, Sang-Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.99 no.3
    • /
    • pp.439-445
    • /
    • 2010
  • Wood boring insects collected around bait logs of Pinus densiflora and Pinus koraiensis were 45 species from 4 families, which were composed of 21 species of Cerambycidae, 9 species of Curculionidae, 2 species of Rhynchophoridae, and 13 species of Scolytidae. Parasitic or predatory insects were 35 species from 15 families in 6 orders. Among the natural enemies, 2 parasitoids of Dolochomitus nakamurai and Echthus reluctator, and 2 predators of Trogossita japonica and Thanassimus lewisi, were observed frequently attacking a vector insect, Monochamus saltuarius, which has been known to transmit pine wood nematode. Bursaphelenchus xylophilus. Adults of D. nakamurai and E. reluctator emerged during early April and early May. Both parasitoids laid eggs on M. saltuarius prepupa and papa, which passed winter inside the pupal chamber. The general predators, T. japonica and T. lewisi, preyed actively during April and October, and attacted almost all of developmental stages of wood borers.

Improvement Plan of Excavation Performance Based on Shield TBM Performance Prediction Models and Field Data (쉴드 TBM 성능예측모델과 굴진자료 분석을 통한 굴진성능 개선방안)

  • Jung, Hyuksang;Kang, Hyoungnam;Choi, Jungmyung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.2
    • /
    • pp.43-52
    • /
    • 2010
  • Shield method is the tunnel boring method that propels a steel cylinder in the ground and excavates tunnels at once. After Marc Isambard Brunel started using the method for the Thames Riverbed Tunnel excavation in London, many kinds of TBM (Tunnel Boring Machine) developed and applied for the construction of road, railway, electricity channel, pipeline, etc. In comparison with NATM concept that allows to observe ground condition and copes with difficulty. The machine selected before starting construction is not able to be changed during construction in shield TBM. Therefore the machine should be designed based on the ground survey result and experiment, so that the tunnel might be excavated effectively by controlling penetration speed, excavation depth and cutter head speed according to the ground condition change. This research was conducted to estimate penetration depth, excavate speed, wear of disc cutter on Boondang Railway of the Han Riverbed Tunnel ground condition by TBM performance prediction models such as NTNU, $Q_{TBM}$, Total Hardness, KICT-SNU and compare the estimated value with the field data. The estimation method is also used to analyze the reason of poor excavation efficiency at south bound tunnel.

Analysis of Early Revegetation Effect in Rock Slopes using Vegetation-Plant (식생플랜트를 이용한 암반비탈면의 조기녹화 효과분석)

  • Ma, Ho-Seop;Kang, Won-Seok;Park, Jin-Won
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.5
    • /
    • pp.81-89
    • /
    • 2010
  • This study was conducted to evaluate the effects of early revegetation by analyzing the characteristics of germination and growth of Chrysanthemum zawadskii using vegetation-plant in rock slopes. After making up a growing basis of approximately 20-cm depth and 10-cm diameter by using a boring machine, the surface of rock slopes was planted with vegetation-plant. The number of germinating populations by soil media was 41 in H.s, 4 in T.s, 3 in M.s, and 0 in M.g.s. The germination rate (%) by soil media was 20.0% in H.s, 3.3% in T.s, 2.5% in M.s and 0% in M.g.s. In monthly changes of growth rate, the aspect was northwest direction, the soil media was H.s, and the treatment was microorganism plot. The main factors affecting survivorship and growth of population were soil media and treatment plot. The interaction between each factor had a good effects in bearing x treatment plot, soil media x treatment plot. but, it is recommended that the mulching of vegetation plant is highly needed to help the germination of seed and growth of vegetation because of loss of seed and soil media occurred due to rainfall. Therefore, The result suggests that the revegetation technique using boring in rock slope was very efficient in respect of the early revegetation and the landscape.

Recovery of Pseudoterranova decipiens (Anisakidae) larvae from codfish of the Antarctic Ocean (남극해산 대구에서 물개회충(Pseudoterranova decipiens) 유충의 검출)

  • 채종일;국상미
    • Parasites, Hosts and Diseases
    • /
    • v.33 no.3
    • /
    • pp.231-234
    • /
    • 1995
  • Anisakid larvae were found from the liver and stomach of the codfish (Notothenia negzecta) caught from the Antarctic Ocean, South Pole, where the Polar Research Center of The Korea Ocean Research and Development Institute is operating- Through observations by scanning electron (SEM) and light microscopy (LM), they were identified as the third stage larvae of Pseunotewnnovo necipiens, a potential agent of human codworm anisakiasis. They measured 25.0-28.5 mm in length, and 0.6-0.8 mm in width. The SEM revealed a prominent boring tooth, three lips, and excretory pore at the anterior end, and a small but prominent mucron at the posterior end. From whole mounts and cross sections of the larvae the ventriculus, intestinal cecum and a Renette cell were found characteristically at the same plane. Raw eating of the codfish caught from the Antarctic Ocean near the South Pole should be avoided so as to prevent human codworm anisakiasis in this area.

  • PDF

Effect of the lateral earth pressure coefficient on settlements during mechanized tunneling

  • Golpasand, Mohammad-Reza B.;Do, Ngoc Anh;Dias, Daniel;Nikudel, Mohammad-Reza
    • Geomechanics and Engineering
    • /
    • v.16 no.6
    • /
    • pp.643-654
    • /
    • 2018
  • Tunnel excavation leads to a disturbance on the initial stress balance of surrounding soils, which causes convergences around the tunnel and settlements at the ground surface. Considering the effective impact of settlements on the structures at the surface, it is necessary to estimate them, especially in urban areas. In the present study, ground settlements due to the excavation of East-West Line 7 of the Tehran Metro (EWL7) and the Abuzar tunnels are evaluated and the effect of the lateral earth pressure coefficient ($K_0$) on their extension is investigated. The excavation of the tunnels was performed by TBMs (Tunnel Boring Machines). The coefficient of lateral earth pressure ($K_0$) is one of the most important geotechnical parameters for tunnel design and is greatly influenced by the geological characteristics of the surrounding soil mass along the tunnel route. The real (in-situ) settlements of the ground surface were measured experimentally using leveling methods along the studied tunnels and the results were compared with evaluated settlements obtained from both semi-empirical and numerical methods (using the finite difference software FLAC3D). The comparisons permitted to show that the adopted numerical models can effectively be used to predict settlements induced by a tunnel excavation. Then a numerical parametric study was conducted to show the influence of the $K_0$ values on the ground settlements. Numerical investigations also showed that the shapes of settlement trough of the studied tunnels, in a transverse section, are not similar because of their different diameters and depths of the tunnels.

Fumigant Activity of Phosphine Against Three Wood Boring Beetles, Platypus koryoensis, Cryphalus fulvus, and Xyleborus mutilatus (광릉긴나무좀, 왕녹나무좀, 노랑애나무좀 성충에 대한 포스핀의 훈증활성)

  • Cho, Sung Woo;Kim, Sung Il;Kim, Hyun Kyung;Kim, Gil-Hah
    • Korean journal of applied entomology
    • /
    • v.58 no.1
    • /
    • pp.31-35
    • /
    • 2019
  • Many forest pests have caused problems for wood quarantine. The fumigation activity of phosphine ($PH_3$) was examined for the adults of three wood-boring insect pests. The $LCT_{99}$ values for Platypus koryoensis, Cryphalus fulvus, and Xyleborus mutilates were 3.192, 0.994, and $0.501mg{\cdot}h/L$ at $20^{\circ}C$, respectively. The effectiveness of $PH_3$ was increasingly time dependent for all doses tested in all three species. In particular, P. koryoensis showed 100% mortality at doses higher than 0.4 mg/L 7 days after fumigation. These results indicate that methyl bromide could be substituted for $PH_3$ for adults of these three species of wood pest.

Waterproofing performance evaluation according to each waterproofing material due to segment construction error (세그먼트 시공오차에 따른 이음부 지수재별 방수성능 평가)

  • Heo, Seung-Mu;Jung, Hoon;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1023-1037
    • /
    • 2018
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic rubber waterstop and gasket, respectively by the construction error and excessive displacement of segment was studied. The test results show that hydrophilic rubber waterstop has favorable on the offset, however unfavorable on the gap. On the other hand, gasket has unfavorable on the offset, however favorable on the gap.

Prediction of replacement period of shield TBM disc cutter using SVM (SVM 기법을 이용한 쉴드 TBM 디스크 커터 교환 주기 예측)

  • La, You-Sung;Kim, Myung-In;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.5
    • /
    • pp.641-656
    • /
    • 2019
  • In this study, a machine learning method was proposed to use in predicting optimal replacement period of shield TBM (Tunnel Boring Machine) disc cutter. To do this, a large dataset of ground condition, disc cutter replacement records and TBM excavation-related data, collected from a shield TBM tunnel site in Korea, was built and they were used to construct a disc cutter replacement period prediction model using a machine learning algorithm, SVM (Support Vector Machine) and to assess the performance of the model. The results showed that the performance of RBF (Radial Basis Function) SVM is the best among a total of three SVM classification functions (80% accuracy and 10% error rate on average). When compared between ground types, the more disc cutter replacement data existed, the better prediction results were obtained. From this results, it is expected that machine learning methods become very popularly used in practice in near future as more data is accumulated and the machine learning models continue to be fine-tuned.

A Study on the Stability of Shield TBM Thrust Jack in the Behavior of Operating Fluid According to Thrust Force (추력에 따른 동작 유체의 거동에 있어 쉴드 TBM 추진잭의 안정성에 대한 연구)

  • Lee, Hyun-seok;Na, Yeong-min;Jang, Hyun-su;Suk, Ik-hyun;Kang, Sin-hyun;Kim, Hun-tae;Park, Jong-kyu
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.18 no.1
    • /
    • pp.38-45
    • /
    • 2019
  • In this paper, the stability of the tunnel boring machine (TBM), used in tunnel excavation, according to the thrust force of the thrust jack was investigated. The existing hydraulic cylinder analysis method is fluid-structure interaction (FSI) analysis, where all of the flow setting and dynamic characteristics should be considered. Therefore, there is a need for a method to solve this problem simply and quickly. To facilitate this, the theoretical pressure in the hydraulic cylinder was calculated and compared with the analytical and experimental results. In the case of the analysis, the pressure generated inside the cylinder was analyzed statically, considering the operating characteristics of the shield TBM, and the stress and pressure were calculated. This method simplifies the analysis environment and shortens the analysis time compared to the existing analysis method. The obtained theoretical and analytical data were compared with the measured data during actual tunneling, and the analysis and experimental data showed a relative error of approximately 23.89%.