• Title/Summary/Keyword: Block turn-over simulation

Search Result 4, Processing Time 0.023 seconds

A collaborative simulation in shipbuilding and the offshore installation based on the integration of the dynamic analysis, virtual reality, and control devices

  • Li, Xing;Roh, Myung-Il;Ham, Seung-Ho
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.11 no.2
    • /
    • pp.699-722
    • /
    • 2019
  • It is difficult to observe the potential risks of lifting or turn-over operations in the early stages before a real operation. Therefore, many dynamic simulations have been designed to predict the risks and to reduce the possibility of accidents. These simulations, however, have usually been performed for predetermined and fixed scenarios, so they do not reflect the real-time control of an operator that is one of the most important influential factors in an operation; additionally, lifting or turn-over operations should be a collaboration involving more than two operators. Therefore, this study presents an integrated method for a collaborative simulation that allows multiple workers to operate together in the virtual world. The proposed method is composed of four components. The first component is a dynamic analysis that is based on multibody-system dynamics. The second component is VR (virtual reality) for the generation of realistic views for the operators. The third component comprises the control devices and the scenario generator to handle the crane in the virtual environment. Lastly, the fourth component is the HLA (high-level architecture)-based integrated simulation interface for the convenient and efficient exchange of the data through the middleware. To show the applicability of the proposed method, it has been applied to a block turn-over simulation for which one floating crane and two crawler cranes were used, and an offshore module installation for which a DCR (dual-crane rig) was used. In conclusion, the execution of the proposed method of this study is successful regarding the above two applications for which multiple workers were involved.

Combined discrete event and discrete time simulation framework for the improvement of shipbuilding process planning (조선 공정 계획의 수립 완성도 향상을 위한 이산 사건 및 이산 시간 혼합형 시뮬레이션 프레임워크)

  • Cha, Ju-Hwan;Roh, Myung-Il;Bang, Kyung-Woon;Lee, Kyu-Yeul
    • Journal of the Korea Society for Simulation
    • /
    • v.17 no.4
    • /
    • pp.71-80
    • /
    • 2008
  • In this study, a simulation framework, which can support developing various simulation systems for the improvement of process planning in shipbuilding such as the block erection, the block turn-over, and so on, is proposed. In addition, a simulation kernel, which is a key component of the simulation framework, is implemented according to the concept of the combined discrete event and discrete time simulation. To evaluate the efficiency and applicability of the proposed simulation framework, it is applied to the block erection process in shipbuilding. The result shows that the proposed simulation framework can provide the consistent, integrated development environment for a simulation system, as compared with existing studies and commercial simulation systems.

  • PDF

Methods for the Modularization of Simulation Model and the Management Scheme of Simulation Scenario for Shipbuilding Process Planning (조선 공정 계획을 위한 시뮬레이션 모델의 모듈화 및 시나리오 처리 방법론)

  • Cha, Ju-Hwan;Ku, Nam-Kug;Roh, Myung-Il;Cho, Doo-Yeoun;Lee, Kyu-Yeul
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.1
    • /
    • pp.17-25
    • /
    • 2012
  • Recently, requests for accurate process planning using simulation have been increasing in many engineering fields including the shipbuilding industry, and many application systems for simulation have been developed. It is difficult, however, for a user to reuse the developed systems, because simulation models in the system are defined by its own method. In addition, the simulation model should be modified whenever a simulation sequence, which is called simulation scenario, is changed. Therefore, in this study, an elementary simulation object is proposed to modularize a simulation model. And the management scheme of simulation scenario is proposed to manage the scenario outside of the simulation models. Also, a simulation template is proposed to increase the development efficiency. To verify the efficiency of the proposed methods, application examples for shipbuilding process planning are implemented.

Design of DVB-T/H SiP using IC-embedded PCB Process (IC-임베디드 PCB 공정을 사용한 DVB-T/H SiP 설계)

  • Lee, Tae-Heon;Lee, Jang-Hoon;Yoon, Young-Min;Choi, Seog-Moon;Kim, Chang-Gyun;Song, In-Chae;Kim, Boo-Gyoun;Wee, Jae-Kyung
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.47 no.9
    • /
    • pp.14-23
    • /
    • 2010
  • This paper reports the fabrication of a DVB-T/H System in Package (SiP) that is able to receive and process the DVB-T/H signal. The DVB-T/H is the European telecommunication standard for Digital Video Broadcasting (DVB). An IC-embedded Printed Circuit Board (PCB) process, interpose a chip between PCB layers, has applied to the DVB-T/H SiP. The chip inserted in DVB-T/H SiP is the System on Chip (SoC) for mobile TV. It is comprised of a RF block for DVB-T/H RF signal and a digital block to convert received signal to digital signal for an application processor. To operate the DVB-T/H IC, a 3MHz DC-DC converter and LDO are on the DVB-T/H SiP. And a 38.4MHz crystal is used as a clock source. The fabricated DVB-T/H SiP form 4 layers which size is $8mm{\times}8mm$. The DVB-T/H IC is located between 2nd and 3rd layer. According to the result of simulation, the RF signal sensitivity is improved since the layout modification of the ground plane and via. And we confirmed the adjustment of LC value on power transmission is necessary to turn down the noise level in a SiP. Although the size of a DVB-T/H SiP is decreased over 70% than reference module, the power consumption and efficiency is on a par with reference module. The average power consumption is 297mW and the efficiency is 87%. But, the RF signal sensitivity is declined by average 3.8dB. This is caused by the decrease of the RF signal sensitivity which is 2.8dB, because of the noise from the DC-DC converter.