• 제목/요약/키워드: Blasting-induced vibration

검색결과 67건 처리시간 0.022초

시추공 시험발파를 이용한 대전 신탄진 지역의 발파진동 예측 (Prediction of Blasting-induced Vibration at Sintanjin Area, Daejeonusing Borehole Test Blasting)

  • 이충원;박성용
    • 한국농공학회논문집
    • /
    • 제60권4호
    • /
    • pp.55-62
    • /
    • 2018
  • Problems on vibration due to blasting for infrastructure development are getting important because of a civil appeal. Blasting-induced vibration is representative construction pollution, hence, it is possible that a number of environmental damages occur. In this study, borehole test blasting was conducted at Sintanjin area, Daejeon and square root equation with 95% confidence level was proposed for prediction of blasting-induced vibration. The vibration value predicted from this equation was more conservatively evaluated than the values predicted from U.S. Department of Interior, Bureau of Mines (USBM) and Nippon Oil & Fats Co., Ltd. (NOF) equations. Therefore, the proposed equation in this study seems to contribute for safety blast design. However, for optimal blast design, inducing equation for prediction of blasting-induced vibration through the identical test blasting with field construction such as rock slope blasting would be required.

중첩모델링자료를 활용한 발파 동해석 기법에 관한 연구 (A Study on the Blasting Dynamic Analysis Using Superposition Modeling Data)

  • 박지우;강추원;고진석;장호민
    • 터널과지하공간
    • /
    • 제18권4호
    • /
    • pp.280-288
    • /
    • 2008
  • 발파진동은 암반 및 인근 구조물에 심각한 문제를 야기할 수 있기 때문에 시공 전 발파진동의 예측과 안전성 평가가 반드시 선행되어야 한다. 최근 발파진동 영향평가를 위하여 시추공이나 시험발파를 통해 획득한 실측진동파형을 이용한 동적수치해석이 증가하고 있다. 하지만 시추공 발파 진동파형은 실제 발파현장에서 측정된 진동파형과 진동수준이나 진동지속시간에서 다소 차이가 있으며 이는 단일공 파형과 유사한 특성을 가진다. 따라서 본 연구에서는 단일공 파형의 중첩모델링을 통해 발파조건 변화에 따른 진동파형을 획득하고 이 파형을 이용한 동적수치해석을 수행하였다.

서울 지하철 건설의 발파기술 발전 (ON THE DEVELOPMENT OF EXPLOSION TECHNOLOGY IN SEOUL METRO SUBWAY CONSTRUSTION)

  • 許眞
    • 화약ㆍ발파
    • /
    • 제18권1호
    • /
    • pp.59-70
    • /
    • 2000
  • The blasting work to construct a subway in seoul, korea have often cased increased neighbor's complaints because of ground vibration. In order to prevent the demage to the stucture it was necessary to predict the level of blasting induced vibration and to determine the maximum charge weigh per delay with an allowable vibration level. The effect of blasting pattem, rock strength and different explosive on the blast-induced ground vibration was studied to determine the maximum charage weight per delay within a given vibration level. The blasting vibration equation from over 100 test data was obtained, V= K(D/W(equation omitted), where the values for n and K are estimated to be 1.7 to 1.5 and 48 to 138 respectively.

  • PDF

시험발파 계측자료 분석을 통한 암석 발파진동 특성 분석 (Analysis on the Characteristics of Rock Blasting-induced Vibration Based on the Analysis of Test Blasting Measurement Data)

  • 손무락;유재하;안성수;황영철;박두희;문두형
    • 한국지반환경공학회 논문집
    • /
    • 제16권9호
    • /
    • pp.23-32
    • /
    • 2015
  • 본 논문에서는 암석발파 유발 진동에 대한 포괄적인 추세특성을 파악하기 위하여 국내 97개의 현장에서 계측된 시험발파진동에 관한 자료를 이용하여 굴착종류(터널, 벤치굴착) 및 암석종류별로 발파진동의 특성을 조사 및 검토하였다. 계측된 자료는 주로 강원도 및 경상도 지역의 시험발파 현장으로부터 획득하였으며, 계측현장 자료의 암석종류는 화강암이 제일 많았으며 그다음으로 편마암, 석회암, 사암, 셰일 순으로 나타났다. 본 연구를 통한 분석 결과, 발파진동 속도는 굴착종류(터널, 벤치)에 따라 영향을 받는 것으로 나타났으며, 터널발파에 비하여 벤치발파에 의한 진동속도가 더 크게 발생하는 것으로 나타났다. 또한 발파진동은 암석종류에 따라 크게 영향을 받는 것으로 나타나 향후 암석종류를 포함한 발파진동 추정식 관리가 필요할 것으로 나타났다. 이와 더불어 본 연구를 통해 얻어진 결과와 기존의 국내 발파진동 추정식에 의한 결과들과 상호 비교하였으며, 비교결과 터널발파에서 자승근식을 이용한 결과를 제외하곤 큰 차이가 나타나 향후 암반에서의 발파진동 추정과 관련하여 암석의 강도 및 절리특성, 지층분포, 굴착종류, 사용화약, 계측장비 및 방법 등의 영향을 종합적으로 반영한 더욱더 많은 연구 및 관심이 필요할 것으로 판단된다.

바닥발파에서 암질지수(RQD)와 발파진동상수 K, n의 관계 (Relationship between Rock Quality Designation and Blasting Vibration Constant "K" & Decay Constant "n" by Bottom Blasting Pattern)

  • 천병식;오민열
    • 한국지반공학회지:지반
    • /
    • 제11권3호
    • /
    • pp.55-68
    • /
    • 1995
  • 본 연구는 수직구의 바닥굴착을 위한 바닥발파시 삼승근환산식과 자승근환산식의 발파진동상수 및 감쇠지수와 암질지수(RQD)와의 관계를 시험발파계측을 통하여 정리분석한 것이다. 각종 발파시 발파진동의 크기는 장약량, 발파원과 발파진동 측정지점과의 거리, 지반의 특성에 따라 크게 좌우되며 본 논문에서는 지반의 특성이 발파진동에 미치는 영향을 규명하기 위하여 암반의 절리특성을 대표하는 RQD와 발파진동 크기와의 관계를 연구한 것이다. 시험결과 RQD의 증가에 따라 발파진동상수 K와 감치지수 n의 절대치는 상대적으로 증가하는 것으로 나타났으며 본 연구결과에 의하여 향후 암질지수에 따른 바닥발파의 발파진동속도를 예측할 수 있다.

  • PDF

New methodology to prevent blasting damages for shallow tunnel

  • Ozacar, Vehbi
    • Geomechanics and Engineering
    • /
    • 제15권6호
    • /
    • pp.1227-1236
    • /
    • 2018
  • From all of the environmental problems, blast-induced vibrations often cause concern to surrounding residents. It is often claimed that damage to building superstructures is due to blasting, and sometimes the building owner files a lawsuit against the company that perform blasting operations. The blast-vibration problem has been thoroughly investigated in the past and continues to be the subject of ongoing research. In this study, a tunnel construction has been performed by a construction company, according to their contract they must have used drilling & blasting method for excavation in tunnel inlet and outlet portal. The population is very condensed with almost tunnel below in the vicinity houses of one or two floors, typically built with stone masonry and concrete. This situation forces the company to take extreme precautions when they are designing blasts so that the blast effects, which are mainly vibration and aerial waves, do not disturb their surrounding neighbors. For this purpose, the vibration measurement and analysis have been carried out and a new methodology in minimizing the blast induced ground vibrations at the target location, was also applied. Peak particle velocity and dominant frequencies were taken into consideration in analyzing the blast-induced ground vibration. The methodology aims to employ the most suitable time delays among blast-hole groupings to render destructive interference of surface waves at the target location.

지하채굴공동에서 굴착방법에 따른 발파진동의 특성에 관한 연구 (A Study on the Characteristics of Blasting Vibration from Different Excavation Methods in Underground Mine)

  • 강추원;류복현
    • 화약ㆍ발파
    • /
    • 제24권1호
    • /
    • pp.1-8
    • /
    • 2006
  • 최근 대부분의 석회석 광산은 환경문제 등으로 인하여 노천채광에서 지하채굴로 전환되었다. 그 결과 노천채광과 같은 생산성을 유지하기 위해 갱도가 대형화되고 있다. 이에 따라 갱도 및 광주의 규모 그리고 굴착방법 등에서 많은 문제가 발생하고 있다. 본 연구는 두 갱도의 동시 발파 혹은 단일갱도 내에서 좌운반갱도와 사갱을 동시 발파, 두 갱도를 다단 발파 그리고 각각의 갱도를 단독 발파하여 굴착했을 때의 발파진동을 계측하여 각각의 굴착방법에 따라 발파진동식을 산출하여 노모그램 분석과 암반손상권 분석을 실시하였다.

터널 굴착 시 주변 구조물에 미치는 영향을 고려한 발파 설계 사례 (Case Study of Blasting Pattern Design for Tunnelling in Which Considered Blast Induced Vibration Affected Across Buildings)

  • 백승규;추석연;윤종오;백운일;박형섭
    • 터널과지하공간
    • /
    • 제16권5호
    • /
    • pp.377-386
    • /
    • 2006
  • 본 연구에서는 기존의 시추공 시험 발파 결과를 이용한 분석뿐만 아니라, 3차원 수치 해석으로 터널 굴착 시 실제 발파와 동일한 조건을 적용한 발파진동영향 검토를 실시하고 주변 구조물에 미치는 진동 영향을 분석하여 발파패턴 설계를 수행하였다.

터널발파의 수치해석적 모델링 (Numerical Modelling of Tunnel Blasting)

  • 이인모;최종원;김상균;김동현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술발표회 논문집
    • /
    • pp.133-140
    • /
    • 2000
  • Drilling and blasting method for excavating rock mass is generally used in underground construction; but this technique has some shortcomings. For instance, rock mass damage is inevitable during drilling and blasting, and blast-induced vibration frequently causes some problems. Until now, field measurement method is used to predict the overbreak and vibration; but it has many limitations. Therefore, numerical analysis method is needed to overcome such limitations, and to estimate and predict damage and vibration due to tunnel blasting in the design stage. In this study, damage zone of rock mass due to stoping and contour blasting is compared based on standard tunnel blasting pattern, and the propriety of the standard tunnel blasting pattern is estimated. Then, blasting pattern is optimized so that the damage zone due to sloping blasting with reduced charge is consistent with that due to contour blasting.

  • PDF

부산 통신구굴진 발파작업으로 인한 지상주택 구조물에 미치는 진동폭음영향계측조사보고 (On the study of the measurement of blasting Vibration and Sound influenced to housing structure at Wire-Tunnelling)

  • 허진
    • 화약ㆍ발파
    • /
    • 제8권2호
    • /
    • pp.3-17
    • /
    • 1990
  • The Caustious blasting have often increased Complaints of ground Vibration and Sound when the Wire-Tunnel Constructed in Pusan. In order to prevent the influence to housing structure, it was necessary to predict blasting-Induced Vibration and Sound. The Suveyer determined the Burden and spacing of Drill holes, minimum delay charges within a allowable Vibration and Sound Level. Tunnel drilling and Ignition patterns are made as follows; No. 1 Tunel (Stable rock, hard rock) No.2 Tunnel (Instable plastic rock; wethered rock) and other Tunnels (Instable rock). The result of 1st testing blasting of No. 1 Tunnel was recorded Under allowable Vibration Level but sound was over 75 Db of allowable value. So Tunnel drilling pattern was amended with 52 Non-charg holes to reduce the blast-sound. The other pattern had no need to amend.

  • PDF