• 제목/요약/키워드: Blasting Vibration

Search Result 432, Processing Time 0.107 seconds

Consideration on Limitations of Square and Cube Root Scaled Distances in Controled Blast Design (제어발파설계에서 자승근 및 삼승근 환산거리 기법의 적용한계에 대한 고찰)

  • Choi, Byung-Hee;Ryu, Chang-Ha;Jeong, Ju-Hwan
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.27-39
    • /
    • 2010
  • Blast design equations based on the concept of scaled distances can be obtained from the statistical analysis on measured peak particle velocity data of ground vibrations. These equations represents the minimum scale distance of various recommendations for safe blasting. Two types of scaled distance widely used in Korea are the square root scaled distance (SRSD) and cube root scaled distance (CRSD). Thus, the design equations have the forms of $D/\sqrt{W}{\geq}30m/kg^{1/2}$ and $D/\sqrt[3]{W}{\geq}60m/kg^{1/3}$ in the cases of SRSD and CRSD, respectively. With these equations and known distance, we can calculate the maximum charge weight per delay that can assure the safety of nearby structures against ground vibrations. The maximum charge weights per delay, however, are in the orders of $W=O(D^2)$ and $W=O(D^3)$ for SRSD and CRSD, respectively. So, compared with SRSD, the maximum charge for CRSD increases without bound especially after the intersection point of these two charge functions despite of the similar goodness of fits. To prevent structural damage that may be caused by the excessive charge in the case of CRSD, we suggest that CRSD be used within a specified distance slightly beyond the intersection point. The exact limit is up to the point, beyond which the charge difference of SRSD and CRSD begins to exceed the maximum difference between the two within the intersection point.

A Case Study on the Design of Railway Tunnel through section for under OO temple (OO 사찰 하부 터널통과 설계 사례)

  • Kim, Shin;Lee, Sung-Ki;Seo, Hyoung-Chul;Kwag, Jung-Yeol;Cho, Bong-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.208-218
    • /
    • 2006
  • It is very important to evaluate predictable problems diversely such as stability of a tunnel and structures when tunnel is inevitably constructed in the area where is adjacent to a structure and low overburden. Double electrified railway design on the third section of Donghae-Nambu line studied in this paper has some problems mentioned above. So more careful works are required before construction. In this study, ground surrounding is composed of faults, fault zone and set back about 13m from a Buddhist temple located on the upper part of the tunnel. From these conditions, this case study presents proper methods considering ground condition, effects of blasting and civil petitions. It is tried to make the tunnel and Buddhist temple stable by analytical technique and analysis of existing cases. And design considering stability of tunnel and adjacent structure during operation is carried out as well. Especially, environmentally friendly railway tunnel which is appropriate to the local condition and surroundings is designed by minimizing noise and vibration that is able to occur during construction and train service. From now on, this study is helpful to better design in the case of tunnel design which has to consider civil petition.

  • PDF

A study on Measurement of Blast-Induced Ground Vibrations in Urban Areas (도심지(都心地) 발파(發破)에서의 지반진동(地盤振動) 측정(測定)에 관(關)한 연구(硏究))

  • Kim, Woong-Soo;Lee, Kyoung-Woon;Lim, Han-Uk;Suh, Baek-Soo
    • Journal of Industrial Technology
    • /
    • v.3
    • /
    • pp.17-26
    • /
    • 1983
  • The blast vibrations were measured from 10 places through Seoul subway area to study their effects on the structures and to establish the safe blasting limits. For purpose of the present study, particle velocity only was recorded and analyzed, because it correlated most directly with damage. The results are as follows: (1) The proagation equation, $V=K(D/W^{1/3})^{-n}$ was obtained. Typical values could be found for n range from 1.7 to 1.5 and for k range from 48 to 138. (2) From the relationship between schmidt hammer rebound hardness and uniaxial compressive strength, $Sc=0.514{\times}(S.H)^{0.23}$, the compressive strength at any area can be assumed. (3) The use of AN-FO and other explosives with low detonation pressure may reduce vibration levels generated.

  • PDF

Slope stability associated with construction (건설공사와 사면 안정성)

  • Baek, Yong;Kim, Gyo-Won;Koo, Ho-Bon
    • The Journal of Engineering Geology
    • /
    • v.10 no.2
    • /
    • pp.1-17
    • /
    • 2000
  • In this study, 270 cut-slopes are investigated and statistical analyses are performed. More than 84% of unstable slopes are rock slopes or rock-soil mixed slopes, and 72% of the slopes have 10 to 30 meter in height. And in order to clarify the cause of failure, 3 slopes which have been failed are back-analysed by using the computer programs such as DIPS, UDEC and PCSTABL5M. A heavy rainfall during rainy season is a main cause of slope failure, and a blasting vibration during construction could also give a significant influence on the slope instability.

  • PDF

A new bridge-vehicle system part II: Parametric study

  • Chan, Tommy H.T.;Yu, Ling;Yung, T.H.;Chan, Jeffrey H.F.
    • Structural Engineering and Mechanics
    • /
    • v.15 no.1
    • /
    • pp.21-38
    • /
    • 2003
  • The formulation of a new bridge-vehicle system using shell with eccentric beam elements has been introduced in a companion paper (Part I). The new system takes into account of the contribution of the twisting and pitching modes of vehicles to the bridge responses. It can also be used to study the dynamic transverse load distribution of a bridge. This paper presents a parametric study on the impact induced by one vehicle or multi-vehicle running across a bridge using the proposed model. Several parameters were considered as variables including the mass ratio, the speed parameter, the frequency ratio and the axle spacing parameter to investigate their effects on the impact factor. A total number of 189 cases were carried out in this parametric study. Within the realistic range of vehicle considered, the maximum impact factors could be 2.24, 1.78 and 1.49 for bridges with spans 10 m, 20 m and 30 m respectively.

Study on the propagation mechanism of stress wave in underground mining

  • Liu, Fei;Li, Lianghui
    • Computers and Concrete
    • /
    • v.25 no.2
    • /
    • pp.145-154
    • /
    • 2020
  • For the influence of the propagation law of stress wave at the coal-rock interface during the pre-blasting of the top coal in top coal mining, the ANSYS-LS/DYNA fluid-solid coupling algorithm was used to numerical calculation and the life-death element method was used to simulate the propagation of explosion cracks. The equation of the crushing zone and the fracturing zone were derived. The results were calculated and showed that the crushing radius is 14.6 cm and the fracturing radius is 35.8 cm. With the increase of the angles between the borehole and the coal-rock interface, the vibration velocity of the coal particles and the rock particles at the interface decreases gradually, and the transmission coefficient of the stress wave from the coal mass into the rock mass decreases gradually. When the angle between the borehole and the coal-rock interface is 0°, the overall crushing degree is about 11% and up to the largest. With the increase of the distance from the charge to the coal-rock interface, the stress wave transmission coefficient and the crushing degree of the coal-rock are gradually decreased. At the distance of 50 cm, the crushing degree of the coal-rock reached the maximum of approximately 12.3%.

A Field Survey of Noise Associated with Subway Train Passage (지하철 연도변의 소음 조사)

  • Son Jung Gon
    • Explosives and Blasting
    • /
    • v.11 no.2
    • /
    • pp.60-68
    • /
    • 1993
  • The noise and vibration generated by the subway rolling stocks operated along the Seoul Subway Line No.1, 2, 3, and 4 lead to a controversy of pollution problem especially in residential areas. However, there is no data or guide to define the damage or provide adequate protection against such pollutions. The field measurements were made to characterize the noise attenuation due to distance, noise level distribution around the subway track of the aboveground and underground parts of each Line. The assessment criteria and methods are considered in addition to the practical available noise control methods. The noise level measured at Line No. 1 and 3 are less than 60 dB(A) with no pollution problem. Only a part of the aboveground section of Line No.2 and 4 indicates severe noise pollution. The effective boundary of these areas exposed to 70dB (A) noise are within 50m from the track centerline of No.2 line and 25m of No.4 line. The residents file a strong complaints whenever the noise level exceeds the 80dB (A) , and an occasional complaints between 70 to 80 dB(A). The distribution of high level noise of 80 dB(A) occurs within 25m from the track centerline of the overbridge, 12.5m of the short steel bridge, and about loom of the long steel bridge such as Dangsan Bridge. The intermediate noise level of 70 to 80 dB(A) is recorded within 50m from the overbridge, U-type retaining structure, and short steel structure, and 280m from the long steel bridge. The results presented in this paper can be used to understand the characteristics of the noise pollution along the Seoul Subway now In operation, and used as a guide to improve the existing noise pollution problems.

  • PDF

Study on the Applicability of Muography Exploration Technology in Underground Space Development (지하공간개발에서 뮤오그래피 탐사기술의 적용성에 관한 연구)

  • Seo, Seunghwan;Lim, Hyunsung;Ko, Younghun;Kwak, Kiseok;Chung, Moonkyung
    • Explosives and Blasting
    • /
    • v.39 no.4
    • /
    • pp.22-33
    • /
    • 2021
  • Recently, the frequent occurrence of ground subsidence in urban areas has caused increasing anxiety in residents and incurred significant social costs. Among the causes of ground subsidence, the rupture of old water and sewer pipes not only halts the operation of the buried pipes, but also leads to ground and water pollution problems. However, because most pipes are buried after construction and cannot be seen with the naked eye, the importance of maintenance has underestimated compared to other structures. In recent years, integrated physical exploration has been applied to the maintenance of underground pipes and structures. Currently, to investigate the internal conditions and vulnerable portions of the ground, consolidated physical surveys are executed. Consolidated physical surveys are analysis techniques that obtain various material data and add existing data using multiple physical surveys. Generally, in geotechnical engineering, consolidated physical surveys including electrical and surface wave surveys are adopted. However, it is difficult to investigate time-based changes in under ground using these surveys. In contrast, surveys using cosmic-ray muons have been used to scan the inner parts of nuclear reactors with penetration technology. Surveys using muons enable real-time observation without the influence of vibration or electricity. Such surveys have great potential for available technology because of their ability to investigate density distributions without requiring as much labor. In this paper, survey technologies using cosmic ray muons are introduced, and the possibilities of applying such technologies as new physical survey technologies for underground structures are suggested.

Suggestion of Safety Level in Fish Farming by Impulsive Sound (충격소음으로 인한 양식어류 피해기준 제안)

  • Choi, Tae Hong;Kim, Jung Han;Song, Ha Lim;Ko, Chin Surk
    • Tunnel and Underground Space
    • /
    • v.25 no.2
    • /
    • pp.125-132
    • /
    • 2015
  • As for noise and vibration occurring due to construction near fish farms, engineering and the technical opinions of experts in different areas were excluded in calculating any damage. The victims tend to present only biological consulting-based opinions while construction companies tend to present information on general construction noise and vibration as they have little biological knowledge on fish. So, the National Environmental Dispute Medication Commission presented specific damage standard in 2009 through studies on standard in calculating compensation and damage assessment of farm-raised fish that were affected by noise and vibration. Currently, 140 dB re $1{\mu}Pa$ is accepted as damage standard of underwater noise in the country. This standard is the RMS value of continuous sounds for more than a second, not the impulsive sounds. To look up the data on existing studies, fish showed different reactions to underwater sounds according to the different kinds of fish such as ostariophysan or non-ostariophysan, and pinnipeds or non-pinnipeds. So, this study will present damage standards for impulsive sounds in consideration of the differences in the characteristics of the impulsive and continuous sounds.

Application of risk analysis and assessment considering tunnel stability and environmental effects in tunnel design (터널 안정성 및 환경성을 고려한 위험도 평가기법의 적용)

  • Kim, Young-Geun;Kim, Do-Hyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2008
  • Recently, because of the various factors by uncertainty of underground, the risks in tunnelling have been occurred increasingly. Therefore, it is very important to estimate and control the risks considering geotechnical conditions for tunnel stability and environmental problems by tunnel construction. In this study, the risk analysis for tunnel stability was carried out by classifying the risk factors such as ground support capacity, ground settlement, the inflow of groundwater into the tunnel and the damage by the earthquake. Also, the risk assessment for the environmental problems was performed by calculating the vibration and noise by blasting and the drawdown of the groundwater level caused by tunnel construction. Each risk factor was evaluated quantitatively based on the probabilistic and statistic technique, then it was analyzed the distribution characteristic along overall tunnel site. Finally, it was evaluated that how much each risk factor influences on the construction cost with a period for tunnel construction, so it is possible to perform reasonable tunnel design which was capable of minimizing the risks in the tunnel construction.

  • PDF