• Title/Summary/Keyword: Blasting Vibration

Search Result 432, Processing Time 0.023 seconds

Evaluation of blasting vibration with center-cut methods for tunnel excavation

  • Lee, Seung-Joong;Kim, Byung-Ryeol;Choi, Sung-Oong;Kim, Nam-Soo
    • Geomechanics and Engineering
    • /
    • v.30 no.5
    • /
    • pp.423-435
    • /
    • 2022
  • Ground vibration generated repeatedly in blasting tunnel excavation sites is known to be one of the major hazards induced by blasting operations. Various studies have been conducted to minimize these hazards, both theoretical and empirical methods using electronic detonator, the deck charge method, the center-cut method among others Among these various existing methods for controlling the ground vibration, in this study, we investigated the cut method. In particular, we analyzed and compared the V-cut method, which is commonly used in tunnel blasting, to the double-drilled parallel method, which has recently been introduced in tunnel excavation site. To understand the rock fragmentation efficiency as well as the ground vibration controllability of the two methods, we performed in-situ field blasting tests with both cut methods at a tunnel excavation site. Additionally, numerical analysis by FLAC3D has been executed for a better understanding of fracture propagation pattern and ground vibration generation by each cut method. Ground vibration levels, by PPVs measured in field blasting tests and PPVs estimated in numerical simulations, showed a lower value in the double-drilled parallel compared with the V-cut method, although the exact values are quite different in field measurement and numerical estimation.

Blasting Impact by the Construction of an Underground Research Tunnel in KAERI (한국원자력연구소내 지하처분연구시설 건설에 따른 발파 영향)

  • Kwon Sang-Ki;Cho Won-Jin;Kim Deug-Su
    • Explosives and Blasting
    • /
    • v.23 no.4
    • /
    • pp.1-18
    • /
    • 2005
  • The underground research tunnel, which is under construction in KAERI for the validation of HLW disposal system, is excavated in a granite rock by drill&blasting. In order not to disturb the operation at the research facilities including Hanara reactor by the blasting for the excavation of $6m{\times}6m$ tunnel, a test blasting at the site was performed. Using the vibration equation derived from the test blasting, it was possible to predict the vibration at different locations at KAERI and to conclude that the blasting design would meet the design criteria at the major facilities in KAERI. The noise and vibration generated by the main blasting were continuously measured. In the case of vibration, the measured values were lower than the predicted one from the vibration equation. It is, therefore, concluded that the influence of blasting work for the construction of 280m long research tunnel on the major facilities in KAERIl would be insignificant.

A Blasting Experience in a Shallow Tunnel Section Overlain by Residential Structures (터널 상부 근접시설물 통과구간의 발파시공사례)

  • Won, Yeon-Ho;Kang, Choo-Won;Kim, Joung-In
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.99-107
    • /
    • 2008
  • This study, to reduce a ground vibration damage of the structures in an area adjacent to housing structures located closely above the tunnel section, is the ground vibration reduction instance of a tunnel blasting selectively applied the ground vibration-controlled blasting method (delay time applied blasting method, large center hole cut method, Line Drilling method, etc) with an originally planned blasting method connected, but with it's workability and economic efficiency is satisfactory, so, the results says the ground vibration-controlled blasting method on a similar condition is very effective, even if the applicability is depend on the blasting method and ground condition of the work area.

Numerical Modelling of Tunnel Blasting (터널발파의 수치해석적 모델링)

  • 이인모;최종원;김상균;김동현
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.133-140
    • /
    • 2000
  • Drilling and blasting method for excavating rock mass is generally used in underground construction; but this technique has some shortcomings. For instance, rock mass damage is inevitable during drilling and blasting, and blast-induced vibration frequently causes some problems. Until now, field measurement method is used to predict the overbreak and vibration; but it has many limitations. Therefore, numerical analysis method is needed to overcome such limitations, and to estimate and predict damage and vibration due to tunnel blasting in the design stage. In this study, damage zone of rock mass due to stoping and contour blasting is compared based on standard tunnel blasting pattern, and the propriety of the standard tunnel blasting pattern is estimated. Then, blasting pattern is optimized so that the damage zone due to sloping blasting with reduced charge is consistent with that due to contour blasting.

  • PDF

Analysis of Vibration Characteristics Caused by the Change of Detonation Pattern in the Blasting Site (발파 현장에서 기폭 패턴 변화에 따른 진동 특성 분석)

  • Jeong-Un Song
    • Explosives and Blasting
    • /
    • v.42 no.1
    • /
    • pp.12-22
    • /
    • 2024
  • In this study, the vibration characteristics according to the detonation pattern between rows in the blasting site were investigated by analyzing the vibration waveform, vibration velocity, and dominant frequency. As a result, it was found that the vibration waveform was changed according to the detonation pattern between rows in the blasting zone, and both the vibration velocity and dominant frequency was showed different condition.

A Case Study on the Application of Vibration Level Units in the Construction Phase (시공단계의 진동레벨 단위적용에 관한 사례 연구)

  • Choi, Hyung-Bin;Kim, Dong-Yeon
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.86-97
    • /
    • 2012
  • Ground vibration induced by a bench blasting in the construction site should cause the damage to the structure and indirect damage to a human body, and the vibration level is most practical descriptor for regulating the damage to human body and peak particle velocity is the descriptor for direct damage assesment of the structure. Meantime, the vibration level has not been considered for the blasting design but this study is the case that apply not only peak particle velocity but also vibration level on the blasting design. Also, we strongly believe that this study will be helpful for the management in the blasting site which some civil appeal is concerned. Total 232 measurements of both ppv and vibration level was used to estimate the scale distance. When the regulating threshold was ppv 0.3 cm/s and vibration level 75 decibel, the charge per delay to be estimated with vibration level could be recommended by 1.2~1.4 times than it of ppv. So, it is proven that considering vibration level on the blasting design is reasonable for not only prevention of the civil appeals but also effective blasting. Again, the blasting design which follows the law, "Noise and Vibration Control Act" can actually serve good condition to carry much more economical and effective blasting. The instruments used for this study are the SV-1 model, as first instrument in korea which can measure vibration velocity and vibration level at the same time.

A study on characteristics of blast vibration waveform by vibration time history analysis (진동이력분석을 응용한 발파 진동파형의 특성에 관한 연구)

  • 김진수;임한욱
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.36-47
    • /
    • 1999
  • For cautious controlled blasting, it is necessary to understand characteristics of the blasting vibration. In this study, a series of tests were carried out to investigate the several characteristics of blasting vibration waveform by vibration time history analysis. Separation between impulse vibration and free vibration from blasting vibration, duration time, effects of overlap of free vibration upon the level of vibration and changes of waveform according to increase of charge weight per delay etc. were studied with waveform analysis.

  • PDF

On the study of the measurement of blasting Vibration and Sound influenced to housing structure at Wire-Tunnelling (부산 통신구굴진 발파작업으로 인한 지상주택 구조물에 미치는 진동폭음영향계측조사보고)

  • Huh Ginn
    • Explosives and Blasting
    • /
    • v.8 no.2
    • /
    • pp.3-17
    • /
    • 1990
  • The Caustious blasting have often increased Complaints of ground Vibration and Sound when the Wire-Tunnel Constructed in Pusan. In order to prevent the influence to housing structure, it was necessary to predict blasting-Induced Vibration and Sound. The Suveyer determined the Burden and spacing of Drill holes, minimum delay charges within a allowable Vibration and Sound Level. Tunnel drilling and Ignition patterns are made as follows; No. 1 Tunel (Stable rock, hard rock) No.2 Tunnel (Instable plastic rock; wethered rock) and other Tunnels (Instable rock). The result of 1st testing blasting of No. 1 Tunnel was recorded Under allowable Vibration Level but sound was over 75 Db of allowable value. So Tunnel drilling pattern was amended with 52 Non-charg holes to reduce the blast-sound. The other pattern had no need to amend.

  • PDF

A Case on Excavation Plan and Design of Adjacent Railroad Tunnel (근접 철도터널의 굴착계획 및 설계 사례)

  • 김선홍;정동호;석진호;정건웅;서성호
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.59-71
    • /
    • 2002
  • The points of this design case are the planning and excavation method of a new double-tracked railroad tunnel which is approx. 11∼22 meters apart from existing single-tracked railroad tunnel. For the optimum excavation method some needs are required in design stage, such as the reduction of noise and vibration, public resentment, damage of buildings and construction costs. Hence the estimation and application of allowable noise and vibration criterion is important. The ground coefficient (K, n) of this site is determined by field trial blasting. The excavation method is chosen to satisfy the allowable noise and vibration criterion. In addition, in order to ensure the stability of existing single-tracked railroad tunnel, the instrumentation of maintenance level is accompanied during the construction stage. As a result of this design condition, central diaphragm excavation with line drilling and pre-large hole boring blasting is applied to the area within 15 meters apart from existing tunnel. And above 15 meters apart, pre-large hole boring blasting is designed.

Influence of Near Field Blasting Vibration to Earth Retaining Wall (근거리 발파진동이 흙막이 구조물에 미치는 영향)

  • Whang, Hyun-Ju;Lee, Sang-Pil;Yang, Hyung-Sik
    • Tunnel and Underground Space
    • /
    • v.18 no.2
    • /
    • pp.118-124
    • /
    • 2008
  • Allowable level of blasting vibration for earth retaining wall was examined in this study. Blasting vibration was measured at near field blasting to evaluate the influence of the blasting work to earth retaining wall and rear ground. Although small scale blasting with $0.5{\sim}2.0kg$ explosives per round merely influenced to the structure and ground, but it was suggested to blast at the distance of twice the least burden considering the block movement.