• Title/Summary/Keyword: Bidding system

Search Result 229, Processing Time 0.029 seconds

A Study on the Optimization plan for Standardization of Engineering Drawing (설계도면 작성기준 최적화 방안에 관한 연구)

  • Kim, Suk-Su;Song, Jae-ho
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.1
    • /
    • pp.57-64
    • /
    • 2020
  • The construction market became generally opened to overseas and the domestic construction industry has competed with the international construction enterprise of which technical knowledge is superior. In order to compete with the international construction companies, domestic construction industry needs more continuous promotions on the research and development for improving the level of technique of the construction engineering to meet the international norm. This study aims to suggest the better standards of engineering output such as drawings and specifications to correspond the changing integration system and bidding system in preparation for growing international competition. The study starts with comparison and analyses of domestic and international methods and standards for preparing design drawings. And it continues to delve into actual drawing preparation practices, especially focusing on the ones for road and subway construction. Finally, the study presents a better way of the standardization of the main drawings such as general plan, longitudinal drawing, cross section, structural drawings and temporary structure for new bidding systems of historical cost estimation and whole specification tender and for promotion of international competitiveness.

A Study on Building up Integrated Information System & Assistance System to Increase UN Procurement Market Access (UN조달시장 진출 활성화를 위한 종합정보시스템 및 지원체계 구축방안)

  • Bae, Jung-Han;Kim, Gwi-Ok
    • International Commerce and Information Review
    • /
    • v.6 no.3
    • /
    • pp.269-296
    • /
    • 2004
  • International Procurement refers to the actions governments and public institutions worldwide buy goods and services. With the WTO agreement on government procurement, most procurements are realized by bidding, which accelerates the opening-up of International procurement. Today International procurement has drawn the world's attention. The scale of international procurement market has been developing fast, reaching about US$ 5.55 trillion this year, In our country, however, due to the difficulty in initial market access to local procurement, the participation in taking international procurement is quite inactive, especially when compared with our exporting scale. The UN procurement market has procurement rules that countries which make contributions to UN and developing countries are favorably treated, and non-discriminatory and public competition in bidding and the optimum purchase are kept, and so on. It has its own head office and many subsidiary agencies. Actually the international procurement market offers an international marketplace for suppliers of all tangible goods and services. Therefore, UN and international procurement markets are great significant foreign markets to our country. But our country lagges behind in international procurement as it has not reached to our monetary contribution to UN. Therefore, it's essential to stimulate our company's participations in the UN procurement market. To fulfil this purpose, first of all, this study analyzes the current status of UN procurement market and Korea's current participation status. Then it investigates the procurement information system of UN and Korea's international procurement market information system as well as assistance system. Based on the above, by studying on the actual spots of the interview investigations on the registered firms in UNPD, this thesis discloses the problems with the Korea's national information system and assistance system on UN procurement market. Finally, this study raises the efficient plan for the integrated international procurement information system & assistance system.

  • PDF

Improvement the bidding system in domestic construction engineering procurement (국내 건설 엔지니어링 입 ${\cdot}$ 낙찰 제도 개선방안 연구)

  • Choi, Bong-Gun;Park, Sung-Je;Joh, Hoon-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.632-637
    • /
    • 2006
  • Our country's bidding system had made the lowest price successful bid system in foundation before introducing eligibility review system at July, 1995, and a averaged- price successful bid system or the restrictive-lowest price successful bid system had been enforced by repletion. However, they were introduced as dumping that do not reach in direct cost level of construction cost is generalized and worry about illegal construction practices rises by the lowest price successful bid system. According as they had not been promoted construction company's technical development effort or cost reduction effort, vicious circle that advocate competition principle again and recur as the lowest price successful bid system is repeated last 50 years. Therefore, I present improvement direction that can satisfy all Global Standard and real condition of our country through foreign countries example analysis to cope with the rapidly changing building circumstances socially and economically to correspond actively to the construction industry's reorganization to reconsider domestic construction engineering's competitive power.

  • PDF

A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis (실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구)

  • Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.192-200
    • /
    • 2003
  • The object of this research is to develop a computerized algorithm of cost estimation method to forecast the total construction cost in the bidding stage by the historical and elemental work cost data. Traditional cost models to prepare Bill of Quantities in the korea construction industry since 1970 are not helpful to forecast the project total cost in the bidding stage because the BOQ is always constant data according to the design factors of a particular project. On the contrary, statistical models can provide cost quicker and more reliable than traditional ones if the collected cost data are sufficient enough to analyze the trends of the variables. The estimation system considers non-deterministic methods which referred to as the 'Monte Carlo simulation. The method interprets cost data to generate a probabilistic distribution for total costs from the deficient elemental experience cost distribution.

A Study on the Risk Examination of the Unit Price of Public Housing Construction Projects (공공주택공사에서의 도급단가 리스크 규명에 관한 연구)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.35-44
    • /
    • 2010
  • Currently, the unit price of public construction projects are not being evaluated appropriately for several reasons. First, the evaluation of the unit price differ per nature of the bidding process and its estimation process. In fact, pricing is determined to meet the total price in turnkey projects and to pass the low bid price deliberation process in unit price projects, and thus, such prices cannot be said to be reasonable prices per public project. After the contract is awarded, however, the prices determined without taking into consideration the characteristic of each bidding process and price estimate process are used for the valuation of progress payment, design changes, and escalation. Furthermore, this is also being applied to other low bid deliberation process as actual public project unit price, thereby affecting other processes as well. In effect, this system increases the risks for both the owner and the bidder who have determined the unit price. This research examines the risk factor and its extent in order to properly manage it in preparation for the future.

초고속 통신망을 이용한 CSCW 기반 CALS 시스템 개발

  • 배재호;왕지남
    • Korea Information Processing Society Review
    • /
    • v.5 no.1
    • /
    • pp.62-74
    • /
    • 1998
  • This paper deals with developing a remote & real-time Computer-Aided Logistics Support (CALS) Systems through Information Super-Highway. A prototype of CALS is designed and implemented considering the environment of Information Super Highway. The concept of CSCW based virtual enterprise is discussed in con-nection with the four different activities. development of remote & virtual equipment controller remote-monitoring & inspection real time tracking of logistics information and web-based bidding and delivery system. A real implemented system is demonstrated under the Infor-mation Super-Highway with the corresponding software and hardware configuration.

  • PDF

건설 CALS 구현을 위한 한일 접근 방법에 관한 연구

  • 오세정;김연응;최돈승
    • Proceedings of the CALSEC Conference
    • /
    • 1999.07b
    • /
    • pp.663-676
    • /
    • 1999
  • Construction CALS is actively being pursued in Korea and Japan. This paper overviews the similarities and differences between both CALS. And this paper reveals both countries have a common ultimate goal of construction CALS, but a slight differences in their implementing processes. Lately Korean construction CALS places much emphasis upon supporting construction management for contractors and project owner, while Japanese construction CALS has made an great efforts in the electronic bidding system and implementing intelligent CAD system and its application. With a firm support and active involvement of enterprises, both countries will flexibly adapt their construction CALS to the changes in future technological trends and build-up of information infrastructure.

  • PDF

A Design and Implementation of Bidding and Scheduling System for Ship Repair (선박수리를 위한 입찰 및 일정관리 시스템의 설계 및 구현)

  • Kang, Hyo-woon;Kim, Jindeog
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.7
    • /
    • pp.1585-1592
    • /
    • 2015
  • Currently, the existing schedule management of ship repair has depended on hand-written notes of engineering manager in the repair ship yard. Simple management based on the hand-written notes is inefficient because current states of equipments and staff are not graspable in real-time. To solve this problem, the ICT based scheduling method is required in ship repair industry. In this paper, we propose a system based on ICT which manages schedules for repairing ships. The proposed system solves the problem occurred by the management to use the hand-written notes. Because the system has a function to report the current state of ship repair, it is able to cope with various problems, such as delay, wrong repair and so on. Moreover, the system is able to maximize the efficiency of ship repair process due to efficient management to staff and equipment.

A Study on the Performance Evaluation of G2B Procurement Process Innovation by Using MAS: Korea G2B KONEPS Case (멀티에이전트시스템(MAS)을 이용한 G2B 조달 프로세스 혁신의 효과평가에 관한 연구 : 나라장터 G2B사례)

  • Seo, Won-Jun;Lee, Dae-Cheor;Lim, Gyoo-Gun
    • Journal of Intelligence and Information Systems
    • /
    • v.18 no.2
    • /
    • pp.157-175
    • /
    • 2012
  • It is difficult to evaluate the performance of process innovation of e-procurement which has large scale and complex processes. The existing evaluation methods for measuring the effects of process innovation have been mainly done with statistically quantitative methods by analyzing operational data or with qualitative methods by conducting surveys and interviews. However, these methods have some limitations to evaluate the effects because the performance evaluation of e-procurement process innovation should consider the interactions among participants who are active either directly or indirectly through the processes. This study considers the e-procurement process as a complex system and develops a simulation model based on MAS(Multi-Agent System) to evaluate the effects of e-procurement process innovation. Multi-agent based simulation allows observing interaction patterns of objects in virtual world through relationship among objects and their behavioral mechanism. Agent-based simulation is suitable especially for complex business problems. In this study, we used Netlogo Version 4.1.3 as a MAS simulation tool which was developed in Northwestern University. To do this, we developed a interaction model of agents in MAS environment. We defined process agents and task agents, and assigned their behavioral characteristics. The developed simulation model was applied to G2B system (KONEPS: Korea ON-line E-Procurement System) of Public Procurement Service (PPS) in Korea and used to evaluate the innovation effects of the G2B system. KONEPS is a successfully established e-procurement system started in the year 2002. KONEPS is a representative e-Procurement system which integrates characteristics of e-commerce into government for business procurement activities. KONEPS deserves the international recognition considering the annual transaction volume of 56 billion dollars, daily exchanges of electronic documents, users consisted of 121,000 suppliers and 37,000 public organizations, and the 4.5 billion dollars of cost saving. For the simulation, we analyzed the e-procurement of process of KONEPS into eight sub processes such as 'process 1: search products and acquisition of proposal', 'process 2 : review the methods of contracts and item features', 'process 3 : a notice of bid', 'process 4 : registration and confirmation of qualification', 'process 5 : bidding', 'process 6 : a screening test', 'process 7 : contracts', and 'process 8 : invoice and payment'. For the parameter settings of the agents behavior, we collected some data from the transactional database of PPS and some information by conducting a survey. The used data for the simulation are 'participants (government organizations, local government organizations and public institutions)', 'the number of bidding per year', 'the number of total contracts', 'the number of shopping mall transactions', 'the rate of contracts between bidding and shopping mall', 'the successful bidding ratio', and the estimated time for each process. The comparison was done for the difference of time consumption between 'before the innovation (As-was)' and 'after the innovation (As-is).' The results showed that there were productivity improvements in every eight sub processes. The decrease ratio of 'average number of task processing' was 92.7% and the decrease ratio of 'average time of task processing' was 95.4% in entire processes when we use G2B system comparing to the conventional method. Also, this study found that the process innovation effect will be enhanced if the task process related to the 'contract' can be improved. This study shows the usability and possibility of using MAS in process innovation evaluation and its modeling.

A Study on the Perception Gaps on the Causes and Improvement Measures of Bid Rigging in the Construction Industry due to the Abolition of Industry Regulations (업역규제 폐지에 따른 입찰담합의 원인과 개선방안에 관한 인식 차이)

  • Cho, Jin-ho;Shin, Young-Su;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.1
    • /
    • pp.75-83
    • /
    • 2024
  • This study examined the causes and remedies of bid-rigging in the construction industry through a survey of procurement practitioners. The study identified potential problems from the business, construction, and bidding environments, and proposed improvements to the procurement and bidding systems to address these problems. The study found that transparency, fairness, and diversity are important factors in reducing bid-rigging. These factors can be achieved through a variety of measures, such as expanding bidding systems, strengthening fairness standards, and increasing the diversity of participating companies. The study also found that unfair subcontracting regulations are a problem that needs to be addressed. There were differences in the perceptions of the causes of bid-rigging between the general and specialized construction groups. However, there was no difference in the perceptions of improvements to the procurement system between the two groups. This suggests that a consistent solution to bid-rigging can be found. The study's findings are expected to contribute to the resolution and prevention of bid-rigging in the construction industry.