• Title/Summary/Keyword: Bidding system

Search Result 229, Processing Time 0.025 seconds

Design and Implement of Multi-agent System for Internet Auction (인터넷 경매를 위한 멀티 에이전트 시스템의 설계 및 구현)

  • 김은영;김태석;김광휘
    • Journal of the Korea Computer Industry Society
    • /
    • v.2 no.3
    • /
    • pp.321-328
    • /
    • 2001
  • Existing internet auction systems have adopted the form which gives a win to the auction bidder who proposes the top bid price for the goods posted on the auction board. But they haven't been satisfying the automatical one-step processing for user’s convenience because they must require continuous care of user for bidding and checking as well as neglecting the convenience of user interface while participating in the electronic bidding system. The agent push mail to a auctioneer information that able to get how much profit as calculate duration time and start price with bidding history stored database. So, this thesis propose a multi-agent system in internet auction that generate the highest margin for auctioneer’s goods.

  • PDF

IMPLEMENTATION OF GOVERNMENT E-PROCUREMENT: A COMPARATIVE STUDY OF THAILAND AND INDONESIAN PRACTICES

  • Budi Hasiholan;Shin-ei TAKANO
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.827-834
    • /
    • 2009
  • In respond to the demand of an open, fair, transparent, and efficient environment for procurement, many governments have incorporated the use of internet in their procurement systems with online procurement (e-procurement). Given the different policies and laws which have to be complied with, the practice of government e-procurement system varies from one country to another. Thus, experiences in running e-procurement will vary as well. The achievements and obstacles of one country's experience will be a constructive reference for other countries in establishing e-procurement system. In this regard, government e-procurement system practices in two Southeast Asia countries i.e., Thailand and Indonesia particularly in public works are consecutively presented and finally compared in this paper. The government of Thailand has applied Online Auctions (e-Auctions) as the national procurement practice since 2005 and performed the e-Auctions in two types: Reverse Auction and Sealed Bid Auction. Contrary to the common practice of e-procurement, the Thai government, with some rationales, runs the bid documents obtaining manually as well as qualification and technical documents submission and holding the e-Auctions at bidding office. Whereas Indonesian government runs Online Sealed Bid Bidding (e-Procurement) and most of the bidding stages are performed electronically except bid evaluation for both technical and financial. The advantages and drawbacks of these two e-procurement practices are discussed as well as improvements that have to be made for successful of e-procurement.

  • PDF

Generator Maintenance Scheduling for Bidding Strategies in Competitive Electricity Market (경쟁 전력시장에서 발전기 유지보수계획을 고려한 입찰전략수립)

  • 고용준;신동준;김진오;이효상
    • Journal of Energy Engineering
    • /
    • v.11 no.1
    • /
    • pp.59-66
    • /
    • 2002
  • The vertically integrated power industry was divided into six generation companies and one market operator, where electricity trading was launched at power exchange. In this environment, the profits of each generation companies are guaranteed according to utilizing strategies of their own generation equipments. This paper presents on generator maintenance scheduling and efficient bidding strategies for generation equipments through the calculation of the contract and the application of each generator cost function based on the past demand forecasting error and market operating data.

Optimal Bidding Strategy of Competitive Generators Under Price Based Pool (PBP(Price Based Pool) 발전경쟁시장에서의 최적입찰전략수립)

  • Kang, Dong-Joo;Hur, Jin;Moon, Young-Hwan;Chung, Koo-Hyung;Kim, Bal-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.12
    • /
    • pp.597-602
    • /
    • 2002
  • The restructuring of power industry is still going on all over the world for last several decades. Many kinds of restructuring model have been studied, proposed, and applied. Among those models, power pool is more popular than other. This paper assumes the power pool market structure having competitive generation sector, and a new method is presented to build a bidding strategy in that market. The utilities participating in the market have the perfect information of their cost and price functions, but they don't know which strategy to be chosen by others. To define one's strategy as a vector, we make utility's cost/price functions into discrete step functions. An utility knows only his own strategy, so he estimates the other's cost/price functions into discrete step functions. An utility knows only his own strategy, so he estimates the other's strategy using Nash equilibrium or stochastic methods. And he also has to forecast the system demand. According to this forecasting result, his payoffs can be changed. Considering these all conditions, we formulate a bidding game problem and apply noncooperative game theory to that problem for the optimal strategy or solution. Some restrictive assumption are added for simplification of solving process. A numerical example is given in Case Study to show essential features and concrete results of this approach.

Operation of Demand Bidding Program to Enhance Demand Response (수요반응을 위한 수요입찰제(수요자원시장) 운영)

  • Sohn, Yoon-Tae;Lee, Ho-Seung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.9
    • /
    • pp.1575-1580
    • /
    • 2010
  • Demand Response is a well-known means usually operated by the system operator(SO) or the electricity retailers in order to reduce the peak loads or cut the price in electricity market. KPX(Korea Power eXchange), the SO in Korea has been operating the demand bidding program(or the demand resource market) since it was firstly introduced as the pilot project in 2008. The results has proved to be effective to enhance demand response. This paper describes the basic concepts and the operation results of the program.

A New Method to Handle Transmission Losses using LDFs in Electricity Market Operation

  • Ro Kyoung-Soo;Han Se-Young
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.2
    • /
    • pp.193-198
    • /
    • 2005
  • This paper proposes a new method to handle transmission line losses using loss distribution factors (LDF) rather than marginal loss factors (MLF) in electricity market operation. Under a competitive electricity market, the bidding data are adjusted to reflect transmission line losses. To date the most proposed approach is using MLFs. The MLFs are reflected to bidding prices and market clearing price during the trading and settlement of the electricity market. In the proposed algorithm, the LDFs are reflected to bidding quantities and actual generations/ loads. Computer simulations on a 9-bus sample system will verify the effectiveness of the algorithm proposed. Moreover, the proposed approach using LDFs does not make any payments residual while the approach using MLFs induces payments residual.

Study on the customer characteristics for the customer interruption cost analysis in term of the domestic customer survey (국내 수용가의 설문조사를 통한 수용가 정전비용 산출을 위한 수용가 특성에 관한 연구)

  • Park, Soo-Man;Kim, Jae-Chul;Bae, Joo-Chun;Moon, Ki-Seung;Moon, Seung-Il
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.142-144
    • /
    • 2003
  • Recently, the bidding between generating company and transmission company have been accomplished according to restructure of power system industry. And the bidding will develop to TWBP (Two-Way Bidding Pool)type. In this way, it will be important issue on optimum reliability maintenance of the power supply. Thus, in this paper illustrate to customer survey result for the interruption cost analysis. Actually the domestic customer survey is performed on 300 samples. Then the points at customer survey and direction are presented in this paper. Customer is divided into 5 types, total response of customer survey was 22 percent. Furthermore domestic customer survey result characteristics will be use for the basis data of the large scale customer survey.

  • PDF

A Study on the Supplier's Bidding Strategy Including Operating Reserve in an Electricity Market (발전 예비력을 포함한 전력시장에서의 공급자 입찰전략 연구)

  • Lee Kwang-Ho;Shin Jae-Hong
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.4
    • /
    • pp.199-204
    • /
    • 2005
  • In an electricity market with an imperfect competition, participants make plans of bidding and transaction strategies to maximize their own profits. The market price and the quantity are concerned with the operation reserve as well as the bidding system and demand curves in an electricity market. This paper presents a market model combined by an energy market and an operating reserve market. The competition of the generation producers in the combined market is formulated as a gaming of selecting bid parameters such as intersections and slopes in bid functions. The Nash Equilibrium(NE) is analyzed by using a hi-level optimization; maximization of Social Welfare(SW) and maximization of the producers' profits.

Bid-based Direct Load Control Framework Under Electricity Markets (전력시장 환경하에 입찰기반의 직접부하제어 운영방안)

  • Lee, Ho-Chul;Song, Sung-Hwan;Yoon, Yong-Tae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.3
    • /
    • pp.455-461
    • /
    • 2009
  • This paper proposes Direct Load Control(DLC) operation scheme using a bidding system and the methodology to value proper quantity decided by the DLC program, which is a kind of resources for stabilization of electricity market price during peak times by managing consumer electricity demand. Since DLC program in Korea is based on the contract with the customers participating in this program, it is difficult to anticipate voluntary participation. That is, incentive for participants in DLC program is insufficient. To cope with this point, it is necessary to develop a new market mechanism and market compatible operation scheme for DLC programs. DLC market mechanism is deemed to be equipped with iterative bidding system, independent operation from energy market, and interactive with bidding information on energy market. With this market mechanism, it is important to find the optimal operation point of DLC allowing for the factors of stabilizing the electricity market price and compensating DLC implementation. This paper focuses on the mathematical approaches for the bid-based DLC operation scheme and examines several scenarios for the following technical justifications: 1) stabilization of electricity market price during peak times, 2) elasticity of demand.

A Study on a Strategy to Enhance the Transparency of the Bidding and Contract System for Public Construction Projects (공공건설사업 입찰 및 계약제도측면의 투명성 확보 전략에 관한 연구)

  • Cho, Young-Jun;Kim, Jong-Ouk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.109-116
    • /
    • 2010
  • A construction project consists of many types of contracts. In the process of selecting the successful contractor after bidding, there will inevitably be fierce competition, which may lead to corruption or bribery. Even after signing the contract, during the period of settling the amount of the contract, bribery could occur. Such corruption could harm the development of the construction industry. It is, therefore, necessary to establish a strategy to prevent corruption by strengthening the transparency of the bidding process. In this study, to prevent corruption in the construction industry, a new service is proposed in which the successful bidder is selected by a professional third party, and the introduction of diverse delivery systems for construction projects and the invigoration of alternative methods of settling disputes are also proposed in this study.