• Title/Summary/Keyword: Bidding system

Search Result 229, Processing Time 0.023 seconds

The development of the procurement process system for e-Biz of the plant business (플랜트 산업의 e-Biz화를 위한 구매 Process System 개발)

  • Kim Hoi-Sub;Lee Joo-Pyo;Han Sang-hoon;Cho Se-hyoung;Park Chang-Hyun;Han Jae-Bum;Kim Sung-Ho;Kim Gyu-Tae
    • Journal of Internet Computing and Services
    • /
    • v.4 no.5
    • /
    • pp.11-19
    • /
    • 2003
  • Since B2C(Business to Customer) from which e-commerce had originated was replaced by B2B, e-Business has shown fast growth so fa., Recently, e-Procurement by l:n concept is on the development as self-purchase system associated with their own ERP In many conglomerates in the Korean market. However, in order to vitalize e-Biz in the plant industry, we need to set up e-marketplaces where many sellers and buyers can meet each other at the same time, which has become the essential part for success as an expanded business model. In this paper, we expect that the foundation for e-transformation in the plant industry is set up by developing Purchase Process System and related modules as the prerequisite for e-Biz in the plant industry, and this report will provide an exemplary model for e-commerce. The Purchase Process System consists of 1) e-Purchasing Module that manages bidding and contract information based on quotation inquiry, 2) e-Expediting Module that manages information to guarantee the on-time delivery, 3) e-Certification Module that controls user authentification, 4) e-Basic Module that manages the bulletin boards, Q&A, etc.

  • PDF

A Decision Support Model for Optimal Delivery of Public Construction Projects (공공건설사업의 최적 발주방식 선정을 위한 의사결정지원모델)

  • Park, Heetaek;Park, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.22-34
    • /
    • 2016
  • The Project Delivery System (PDS) is used in mixed way without clear classification from tendering system and the standard itself that can be selected is set with project budget or estimated cost only. Essentially, the PDS should consider and reflect project characteristics and types, internal and external factors for the purpose of improving the lives of citizens and their welfare. However, the current status is not operated flexibly due to the given budget, period and uniform laws and regulations. In order to solve this problem, this study suggests a Decision Support Model to select the optimal PDS for public construction projects. The current problem of the PDS for public construction projects were identified and the application of a decision support model was proposed. Subsequently a decision-making model was suggested for each PDS using the identified factors and linear discriminant function of discriminant analysis. An additional questionnaire survey and actual practical case analysis were carried out to verify the effectiveness and applicability of the model to actual work. It can be used by adjusting the decision support model and detailed factors according to the specific characteristics of public organization, ability of person in charge and project type.

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System (건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.170-181
    • /
    • 2008
  • Cost of construction project have to be estimated based on drawing before execution. Cost estimate and check would be performed numerously for preparing general outline of requirements and determining the budget at conceptual planning stage, for obtaining decision on every matter related to design, specification, construction and cost at design stage, and for predicting bidding cost. Thus, importance of cost estimation cannot emphasize too much in construction. However, there are lack of standard estimation method, process, and cost analysis method, that square foot estimation method is as used as eyer, in Korea. Thus, This research present the direction for improving cost estimation and management in construction; It is demanded that establishing standard data base methodology, multi-level database model CUBE, and standard cost planning process, choosing cost estimation methodology according to objectives and cost planning process, and making more experts.

A Study on the Fisheries Marketing Channels (수산물 마아케팅 경로(FMC)에 관한 연구)

  • 강연실
    • The Journal of Fisheries Business Administration
    • /
    • v.23 no.2
    • /
    • pp.101-128
    • /
    • 1992
  • How to distribute fisheries catches from producer to consumer is very important for everybody joined fisheries marketing channels (FMC), because most people are influenced their revenue and expenditure through marketing channels. Many institutions in Korea after 1960's have tried to develop the rationalization of FMC, but they have not gotten the satisfactory results in general in spite of a lot fruits. Comparing with general manufacturing industry, the fisheries industry has some specializations in the marketing channels. It makes them unique structure included wholesale market system similiar to fresh (perishable) food market with expertised technology. Wholesale market collects, distributes the fisheries catches and evaluates in by auction or bidding without consideration of producer's opinion. It is very necessary institution to make a decision to equatible price for fresh food and to play an important role for marketing effectiveness with minimum total transation and with massed reserve among institutions. But it has two weak points to increase the marketing cost and to make products bad fresh (perishable). Therefore, both Producer and consumer want to find the direct channels not to pass through wholesale market and to get more profit. I wanted to explain what problems of traditional FMC are and why the direct channel is necessary as follows in this paper. Chapter II : The types and specialization of FMC Chapter III : The structure and problem of fisheries wholesale market channel Chapter IV Marketing cost of FMC and direct channel I suggested when the direct channel in FMC is designed, new planner must carry out marketing functions which are performanced by wholesaler, middle man and the joined members of auction at wholesale market. In view of consumption area, these functions are : (1) the finding of production partner to make a business ; (2) communication of information ; (3) collecting ; (4) distribution ; (5) selecting and grading ; (6) evaluating ; (7) financing and payment ; (8) organization, in view of consumption area. The government must support also the group or individual of new direct channels to succeed it with (1) furnishing of market information (2) supplying of land and facility (3) financing (4) feed-back of dierct channels totally (5) making an opportunity of communication between producer and consumer. I want to emphasize again wholesale market is necessary and important institution for equatible price of fresh food in spite of the its weak points. At the same time. the direct channels are necessary to reduce the marketing cost and to keep better fresh food.

  • PDF

A Study on Perceived Problems of and Improvement Measures for Asbestos Abatement Companies in Support of Related Policies (석면 해체 및 제거 업체가 느끼는 관련 제도의 문제점 및 개선방안에 관한 연구)

  • Chang, Jaepil;Rho, Youngman;Jung, Kihyo
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.30 no.1
    • /
    • pp.28-38
    • /
    • 2020
  • Objectives: The purpose of this study is to identify the perceived problems of and suggest improvement measures for asbestos abatement companies in support of asbestos-related systems and policies. Methods: For this study a questionnaire was prepared consisting of current work (two questions), the contribution and necessity of a risk assessment system for asbestos abatement (two questions), and problems with and improvement measures for systems and policies (nine questions). The questionnaires were sent to 2,170 asbestos abatement companies and were returned by 83 companies (return rate = 3.8%). We conducted frequency analysis, ANOVA, and a Chi-squared test at the 5% significance level. Results: Asbestos abatement companies expressed difficulties with complying with wet work (43% of unenrolled managers), negative pressure enclosure (36% of all respondents), and installation and use of decontamination units (26% of all respondents) as stipulated in the relevant regulations. In addition, 43% of the respondents expressed concerns that the expertise of the company was not considered during bidding for asbestos abatement and hoped that an advantage (e.g., bid point) would be given to the upper grades for asbestos risk assessment (38%). Asbestos abatement companies generally rented and used negative pressure devices (including negative pressure recording devices) and suggested that periodic calibration (32%) is needed to ensure the performance of the rented equipment. Finally, the respondents asked for clear definitions for three situations specified in the Occupational Safety and Health Acts: (1) temporarily leaving the asbestos abatement workplace; (2) tasks with less airborne asbestos; and (3) physically breaking or cutting using a machine. Conclusions: The problems and improvement measures identified in this study of asbestos abatement companies can be utilized as fundamental information for the improvement of the systems and policies for safe asbestos abatement.

Application of Partnering to Design VE to Public Design-Build Projects (공공부문 일괄입찰사업의 설계VE 파트너링 활용방안)

  • Kim, Hae-Gon;Um, Ik-Jun;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.110-118
    • /
    • 2006
  • Current design-build contract is the type of joint venture, but performs by separate party which causes change orders due to the lack of communication between design and construction, so it cannot lead the main object which is the integration of design and construction. Furthermore, the current design-build contract is impossible to reduce the project costs by VE at the design development phase because the design proceeds with the fixed price through bidding. Like these limitless, the analysis results of the case of VE in the design-build projects, several problems that are prevented from active design VE are elicited by the project participants. Meanwhile, Ministry of Construction & Transportation decided to enlarge the VE review system lately. Therefore, in this study, it presented model of design VE partnering of design-build and partnering agreements form to apply design VE and to try to be able to lead the design VE to be more successful in public design-build projects.

The Investigation and Performance Assessment of the Design-Build Projects in Korea (국내 턴키/대안공사 실태조사를 통한 턴키/대안 입찰제도의 성과 분석)

  • Kim Sun-Hee;Kim Du Yeon;Park Sang Hyuk;Yeom Sang Min;Chae Myung Jin;Han Seung Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.462-467
    • /
    • 2004
  • Design-build, which is defined as single source responsibility for design and construction, has been widely used in large public works since governmental formulation of measure for encouraging use of design-build in 1996. However, civic groups and small and medium sized enterprises are highlighting over-competition and unbalanced market shares of conglomerate in domestic design-bid market and insisting on decrease in the use of design-build and absorption into the lowest-price bidding. This study collected information about cost, schedule, quality, new technology adoption from 51 civil design-build projects and measured their performance.

  • PDF

A Checklist for Assessment of Risks Involved in IT Service Project Contract (IT 서비스 프로젝트 계약서 위험 요인 평가 체크리스트)

  • Jeong, Eun Joo;Jeong, Seung Ryul
    • Journal of Internet Computing and Services
    • /
    • v.15 no.4
    • /
    • pp.57-65
    • /
    • 2014
  • Risk factors are the reason behind cost overruns and delays in long-term large-scale IT service projects. Major risks originate from the integration of complex IT system components, including software, hardware, and solutions; the competitive bidding process; the turnkey and firm-fixed price nature of contracts; and the project execution environment. We have identified several risk factors such as delay in acceptance, low quality of deliverables, delay in payment, adding and changing requirements and scope, unclear definition of roles and responsibilities of the buyer and supplier, and unclear procedures of change and quality management during the project execution phase. One needs to manage risks proactively before signing the contract. In order to weed out or lower the risk factors well in advance, we need to identify and remove risk factors contained in contract clauses and attached contract documents. We propose a checklist for assessing IT service project contracts. To validate the checklist's utility, we applied it to an IT service project in the finance industry. The results show that the checklist is effective in identifying and removing risk factors pertaining to IT service projects.

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTL사업비 타당성 평가모형정립에 관한 연구)

  • Lee, Chun-Kyong;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.905-908
    • /
    • 2008
  • The BTL project, 4 years since its operation, has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the pribrity to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group. composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following: LCC analysis and disbursement for government including two more detailed factors.

  • PDF