미국 주파수 경매의 경제학적 특성

  • Yun Chung-Han
    • The Proceeding of the Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.17 no.3 s.59
    • /
    • pp.63-73
    • /
    • 2006
  • Auctions have been traditionally used to find the current price of goods when little is known about their true value. A special auction methodology, called a 'simultaneous multiple round auction', is available to auction radiofrequency spectrum where all lots are simultaneously on of for over multiple rounds of bidding. This type of auction is especially useful when there are lots that are of essentially equal value and substitutable, except that different bidders may prefer different combinations of lots. By using multiple rounds, a bidder has the opportunity to gather information concerning the value of individual lots and can change strategy by shifting the bidding to another preferred combination if one combination becomes too expensive. Information is released in three main ways during an auction: Bidder Status; High Bids; and Bandwidth Value.

An Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering (시스템엔지니어링을 이용한 턴키방식 플랜트 건설계약의 기술적 위험요인 효과적 분석 및 관리)

  • Hong, Dae Geun;Byun, Hee Chul;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.59-69
    • /
    • 2014
  • In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.

Stability of Construction Cost-variability Factor Rankings from Professionals' Perspective: Evidence from Dar es Salaam -Tanzania

  • Shabani, Neema;Mselle, Justine;Sanga, Samwel Alananga;Kanuti, Arbogasti Isidori
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.2
    • /
    • pp.17-33
    • /
    • 2018
  • This study investigates the stability of professionals' cost variability factor-rankings across different levels of cost-variability and response scenarios. Descriptive statistics are used to examine the stability of factor-ranking for 20 cost variability factors and a Multinomial Logistic (MNL) regression model was implemented to examine the stability of cost variability factors across three cost variability levels. The finding on the descriptive statistics indicated that professionals' factors-rankings are stable only for external factors. The MNL regression results on factor-stability suggested that 8 out of the 20 evaluated factors were unstable determinant of lower cost variability levels. These factors are "risk associated with the project", "personal bias and poor professionalism of the estimators", "limited time available to complete the project", "lack of skills and experience by estimator" "geographical location of projects", "incomplete & rush designs for estimate", "unforeseen or unexpected site constraints", "high class bidders for the contractors". Similarly lack of experience and large size projects were observed to be unstable as well. These observations suggest that professionals' view on pre-tender cost variability factor-ranking yields unstable factor rankings hence should not be relied upon as the only mechanisms to mitigate cost related risks in construction projects.

Design and Implementation of a realtime Auction System using information providing agent (정보 제공 에이전트를 이용한 실시간 경매 시스템 설계 및 구현)

  • 최옥경;한상용
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.2
    • /
    • pp.87-99
    • /
    • 2001
  • Along with the rapid emergence of the Internet and e-commerce, online auctions are hitting the spotlights. The inconveniences found in off-line auctions, such as time and place restriction and limited number of items, are solved in the online auction. However, not so many auction sites have integrated auction information systems, which monitor the present status of auctions, resulting in greater inconvenience for the online auction users. Moreover, there is no auction site that suggests the appropriate starting or closing price that is useful for users when they make, their bids, What the online auction users need is an auction system that can solve such problems. This study is purported for solving the problems by designing and implementing a real time auction system that applies the comparison search functions and the agent functions. In other words, an integrated database system using a bidder-oriented agent for providing information is built so that the users can search and compare the information on the item they are interested in and make a faster and more accurate purchase. Also the appropriate starting and closing prices are offered to the sellers and bidders through the integrated system for a closer and more accurate comparison and analysis of the prices. For future work, the product recommendation service, which accurately reflects the bidding patterns, and the methods for studying the multi bidding pattern will be applied to the suggested system to realize a real time auction information system that supports CRM(Customer Relationship Management) .

  • PDF

Investigation on Uncertainty in Construction Bid Documents

  • Shrestha, Rabin;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.67-73
    • /
    • 2022
  • Construction bid documents contain various errors or discrepancies giving rise to uncertainties. The errors/discrepancies/ambiguities in the bid document, if not identified and clarified before the bid, may cause dispute and conflict between the contracting parties. Given the fact that bid document is a major resource in estimating construction costs, inaccurate information in bid document can result in over/under estimating. Thus, any questions from bidders related to the errors in the bid document should be clarified by employers before bid submission. This study aims to examine the pre-bid queries, i.e., pre-bid request for information (RFI), from state DoTs of the United States to investigate error types most frequently encountered in bid documents. For the study, around 200 pre-bids RFI were collected from state DoTs and were classified into several error types (e.g., coordination error, errors in drawings). The analysis of the data showed that errors in bill of quantities is the most frequent error in the bid documents followed by errors in drawing. The study findings addressed uncertainty types in construction bid documents that should be checked during a bid process, and, in a broader sense, it will contribute to advancing the construction management body of knowledge by clarifying and classifying bid risk factors at an early stage of construction projects.

  • PDF

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

A study on the improvement of loading and unloading work in laver aquaculture industry (양식 생김의 양륙 작업 개선에 관한 연구)

  • MIN, Eun-bi;YOON, Eun-a;HWANG, Doo-jin;KIM, Ok-sam;YOO, Geum-bum
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.56 no.1
    • /
    • pp.45-54
    • /
    • 2020
  • In this study, an automatic system for improving the working environment and increasing production efficiency of a laver aquaculture industry in Korea was developed by combining a hydraulic control system and a load cell in a current landing work of the laver. The improved gathering laver system allowed the automatic gathering process of the laver in the sea with the hydraulic control system connected to a cutting machine of the laver on the operating ship, which has been used for gathering the laver semi-automatically in a form of the traditional farming method. The transporting process of the laver from an operating ship to the land was improved as follows. A frame installed on the operating ship and the bag nets were designed and made to hold about 1,000 kg of the laver inside. The bag nets contain the laver on the improved operating ship were tied in knots and hooked on a crane using a load cell. The weight is measured immediately by lifting the bag nets through the load cell system. Weight information is communicated to the fishermen and successful bidders through the application. The advantages of the improved system can help fishermen to fish by improving their working environment and increasing production efficiency. The field survey to improve the landing operation of the laver aquaculture was conducted in Gangjin, Goheung, Shinan, Wando, Jindo, and Haenam in South Jeonnam Province. A total of 10 sites including Gunsan in Jeonbuk Province, Daebu Island in Ansan City, Jebu Island in Hwaseong City in Gyeonggi Province, and Seocheon in Chungnam Province were searched to collect data. Prototypes of the system were tested at the auction house of laver located in Goheung, where laver collection using hydraulic control and landing using road cell could be improved.

A New Dynamic Auction Mechanism in the Supply Chain: N-Bilateral Optimized Combinatorial Auction (N-BOCA) (공급사슬에서의 새로운 동적 경매 메커니즘: 다자간 최적화 조합경매 모형)

  • Choi Jin-Ho;Chang Yong-Sik;Han In-Goo
    • Journal of Intelligence and Information Systems
    • /
    • v.12 no.1
    • /
    • pp.139-161
    • /
    • 2006
  • In this paper, we introduce a new combinatorial auction mechanism - N-Bilateral Optimized Combinatorial Auction (N-BOCA). N-BOCA is a flexible iterative combinatorial auction model that offers optimized trading for multi-suppliers and multi-purchasers in the supply chain. We design the N-BOCA system from the perspectives of architecture, protocol, and trading strategy. Under the given N-BOCA architecture and protocol, auctioneers and bidders have diverse decision strategies f3r winner determination. This needs flexible modeling environments. Hence, we propose an optimization modeling agent for bid and auctioneer selection. The agent has the capability to automatic model formulation for Integer Programming modeling. Finally, we show the viability of N-BOCA through prototype and experiments. The results say both higher allocation efficiency and effectiveness compared with 1-to-N general combinatorial auction mechanisms.

  • PDF

U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication (미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점)

  • Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.2
    • /
    • pp.215-225
    • /
    • 2020
  • In selecting a company of A-E service provider for a public construction project, public owners make widely use the evaluation method based on the quantitative criteria to emphasize transparency and fairness instead of putting more weighting on bidders' technical capability. The selection method and process to select technically better company has been in discussion to motivate company to build up their technical capability and better quality of service. This paper examined US laws and regulations related to evaluating and selecting an A-E company for public construction project in terms of principles, process, selection committee, evaluation methods, and contract management and so on. Then deduced several implications for domestic public owner to select the most adequate company for a certain architectural service through fair and efficient way. The major findings are technical capability based selection, emphasizing owner's role and responsibility, consideration of small and mid-sized company, debriefing, and post-service evaluation.

A Study on the Use of Parking Lots and Improvement Methods of Land Supply in Public Development Zones (공공개발지구 내 주차장용지의 이용실태와 토지공급방법 개선방안 연구)

  • Park, Chang Yul;Kim, Si Jin
    • Land and Housing Review
    • /
    • v.10 no.4
    • /
    • pp.13-30
    • /
    • 2019
  • Parking lot within housing site contains public interest of relieving parking space shortage problem and subject to public restriction. If auctioned off at higher price by excessive competition in general competitive bid for land bidders, the development of parking lot will be made against its original purpose supply. The core issue is that a bid price is quite often to be blown out of proportion by 150%~ 250% due to extreme competition and, could face serious problem if a winning bidder runs sale business. If it is rental business, although about 30% of the total floor space of the whole building to be used as neighborhood facilities, too high winning bid price cause to lose transparency. In case of sale at aggregate buildings, most business operators would sell 30% of the neighborhood facilities, spare the parking lot and manages thereof separately. According to Aggregate Buildings Act, neighborhood facilities are allowed for individual registration and ownership of parking lot by business operator or designated person by business operator. In this case, the parking lot becomes 70% of the total floor space of the whole building and 70% of the land share which makes the mortgage very valuable and easier for business operator to get financial loan. There used to be many cases such as owners of neighborhood facilities (aggregate buildings partial owners) who run parking lot to repay their loan running parking lot to repay loan, but found that very tough and reached auction and relatively disadvantaged. For parking lot within housing site, it is recommend to exclude the public factors that land has and take into account of public restriction in area (housing site). Business opportunity for operators and protection of property rights for buyers in aggregate buildings, land supply method is recommended to replace from highest bid method into draw or private contract. In terms of price, supply at estimated price (construction price) and restriction on usage (Co-ownership of parking lot) proposals are submitted.