• Title/Summary/Keyword: Benefit-Cost model

Search Result 338, Processing Time 0.03 seconds

Development of a Cost-benefit Model for the Management of Structural Risk on Oil Facilities in Mexico

  • Leon, David-De;Alfredo H-S. Ang
    • Computational Structural Engineering : An International Journal
    • /
    • v.2 no.1
    • /
    • pp.19-23
    • /
    • 2002
  • A reliability-based cost-benefit model for the risk management of oil platforms in the formulation of optimal decisions based on life-cycle consideration is proposed. The model is based on structural risk assessments and the integration of social issues and economics into the management decision process. Structural risks result from the platform's exposure to the random environmental loading associated with the offshore site where it is located. Several alternative designs of a typical platform are proposed and assessed from the cost-effectiveness viewpoint. This assessment is performed through the generation of cost/benefit relationships that are used, later on, to select the optimal design.

  • PDF

A SCM System Selection Problem using AHP Technique based on Benefit/Cost Analysis (편익/비용분석 기반의 AHP 기법을 이용한 SCM 시스템 선정 모델)

  • Seo, Kwang-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.2
    • /
    • pp.153-158
    • /
    • 2009
  • An optimal selection problem of SCM system is one of the critical issues for the company's competitiveness and performance under global economy. This paper presents a hierarchy model consisted of characteristic factors for introducing SCM system and an AHP (Analytic Hierarchy Process) based decision-making model for SCM system evaluation and selection. The proposed model can systematically construct the objectives of SCM system selection to meet the business goals. This paper focuses on selecting an optimal SCM system considering both all decision factors and sub-decision factors of a hierarchy model. Especially, the benefit/cost analysis is applied to choose SCM system. A case study shows the feasibility of the proposed model and the model can help a company to make better decision-making in the SCM system selection problem.

A Structural Modeling for Switching Costs and Site Retention in Apparel Shopping Website (의류쇼핑 웹사이트 전환비용과 사이트 유지의 구조모델)

  • Kim, Eun Young
    • Korean Journal of Human Ecology
    • /
    • v.21 no.6
    • /
    • pp.1173-1184
    • /
    • 2012
  • This study estimates a structural model to examine the causal relationships among web browsing, switching cost, and site retention in the context of apparel shopping website. A total of 499 usable questionnaires were obtained from consumers aged from 20 to 49 years. For data analysis, exploratory factor analysis, confirmatory factor analysis and structural model were used. The result showed that consumer's perceived switching costs consisted of three factors: relationship cost, search cost and benefit loss cost. In estimated structural model, the relationship cost was influenced by leisure browsing; the search cost was influenced by informational browsing and leisure browsing; the benefit loss cost was influenced by leisure browsing. Especially, the leisure browsing was the most highly related to the benefit loss cost, and followed by relationship cost and search cost. However, hedonic browsing was not significantly related the factors of switching costs. The search costs significantly affected customer's intentions for site retention. A managerial implication was discussed for e-retailers in order to develop strategic switching costs in building long-term relationships with web browsers on the apparel shopping websites.

Development of Investment Evaluation Model for Ubiquitous Health Service (유비쿼터스 서비스 모델의 성과 평가 모형 개발에 관한 연구 : u-Health 서비스의 투자 타당성을 중심으로)

  • Nam, Se-Il;Kim, Min-Kwan;Lee, Cha-Young;Han, Chang-Hee
    • Journal of Information Technology Applications and Management
    • /
    • v.15 no.1
    • /
    • pp.183-202
    • /
    • 2008
  • The introduction of a ubiquitous environment has realized commercial ubiquitous services in various industrial fields and government area. The central and/or local governments are demanding an appropriate investment evaluation model for ubiquitous service. Thus, this study develops and suggests an evaluation model for ubiquitous service by reflecting its characteristic of promoting public good, as well as its broad ripple effect on people. The investment evaluation model for ubiquitous service suggested by this study is based on Cost Benefit Analysis Method. Especially, the 'Benefit' is analyzed in two aspects; 'Economic Benefit', which shows the benefit that ubiquitous service providers to the overall local economy, and; 'Financial Benefit', which shows the profit of individual investors participating in the introduction of ubiquitous service. The investment evaluation model for ubiquitous service suggested by this study can be used by the central and/or local government during their evaluation for investment before introducing a ubiquitous service. Also, when introducing a ubiquitous service in public field, the model can be used to support the decision making of private businesses for investment. Finally, it can be used to promote and inform the expected benefits of introducing a ubiquitous service to local residents.

  • PDF

Development of a Process Centered RFID Cost-Benefit Analysis Model and Tool (RFID 도입에 대한 프로세스 중심 비용편익분석 모형 및 툴 개발)

  • Jeong, Jee-Hoon;Lee, Yong-Han
    • The Journal of Society for e-Business Studies
    • /
    • v.13 no.3
    • /
    • pp.173-188
    • /
    • 2008
  • While many success stories are reported in the area of RFID applications, actual RFID deployments in industry are being realized a lot slower than expected. One of the main reasons for that is the lack of decision makers' understanding on the RFID ROI. In this research we drew a comprehensive list of cost and benefit items regarding RFID deployments especially for distribution and retail industry. In addition, we mapped these cost/benefit items to corresponding SCOR processes so that users can easily utilize the suggested cost-benefit analysis model when they want to improve their own processes using the RFID technology. The developed cost-benefit analysis model was implemented as a software tool for convenient use. Our research results can be used not only for those who want to evaluate the RFID technology prior to actual deployment but also by the researchers in this area.

  • PDF

Benefit analysis model of the national map revision program using replacement cost method (대체비용법을 이용한 수치지형도 갱신사업의 편익분석 모형 연구)

  • Son, Hwamin;Yang, Sungchul;Ga, Chillo;Yu, Kiyun;Huh, Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.1
    • /
    • pp.79-87
    • /
    • 2013
  • This study proposed a method to analyze the economic benefit of the national map revision program using the replacement cost method. The replacement cost method measures the benefit of a project as the minimum cost to replace functions of the project with those of alternative goods or services in an existing market. Thus, the demands on 1/5,000 topographic map revision in 18 administrative tasks such as city and district management planning were surveyed in three local autonomous entities. Then the cost to alternatively fulfill the demands was estimated with the standard construction estimating system for the field surveying and surveying results in commercial GIS companies for the site investigation. With this cost estimation model, the benefit of the current national map revision program to the local autonomous entities was estimated as 265,960,999 won. And cost benefit ratios according to several revision frequencies from 0.5 to 4 year were also compared to find the optimal frequency.

Cost.Benefit Risk Based Purchase Pricing Process Model for Feed in Tariffs of Photovoltaic Power Projects (비용.수익 리스크 기반 태양광사업 발전차액지원 기준가격 산정 프로세스 모델)

  • Kim, Se-Jong;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.113-121
    • /
    • 2010
  • Since the cut-down of the purchasing price of the feed in tariff(FIT) in 2008, the numbers of photovoltaic projects get decreased, contrary to investment expansion policy of government on renewable energy. The root cause of the decrease is the irrationality of the current purchasing price structure of FIT as well as the adversity of fund raising due to the global financial crisis. This study proposes the FIT calculating model (Cost & Benefit Risk Based Purchase Price Process : CBRP3) reflecting the fluctuation of cost and benefit risks. The first step is to establish the photovoltaic generation alternatives, and to calculate each distribution data of the investment and the power generation quantity. The FIT for each alternative is, then, assessed through simulations. Finally the proposed FIT scheme is compared to the present FIT scheme and future study subjects are derived.

Economic Analysis for Standardization R&D of Urban Rail System (도시철도 표준화 연구개발사업의 경제성 분석)

  • Chung, Choong-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1694-1714
    • /
    • 2007
  • This study is to estimate economic benefits of Standardization R&D of Urban Rail System. Benefit was to be realized through standardization of main areas such as train vehicle, railway, power system, and signal system. To derive and calculate the quantitative benefit, the sources of economic impact was divided into three dimensions -operational cost savings, import substitution, and safety effects. Economic effect of the standardization was categorized based on a modified BSC model. Economic benefits from time and labor savings are converted into cost savings. Import substitution and investment multiplier effect have a positive impact in addition to cost savings. The estimation of the standardization R&D of Urban Rail System was conservatively estimated 370 billion Won. Cost effectiveness of standardized safety system was conservatively translated into economic benefit in this analysis. This study provides a practical guide to economic evaluation of the various railway R&D projects.

  • PDF

Empirical Analysis on the Shortcut Benefit Function and its Factors for Triple Database (트리플 데이터베이스 단축 경로 이득 함수와 구성 인자 실험 분석)

  • Kang, Seungseok;Shim, Junho
    • The Journal of Society for e-Business Studies
    • /
    • v.19 no.1
    • /
    • pp.131-143
    • /
    • 2014
  • A triple database consisting of a number of three-column tables require high cost of query processing, whereby building a shortcut is known as an effective way to reduce the cost. It is important to figure out what shortcuts needs to be selectively built. Most shortcut selection algorithms make use of a benefit model that considers the query frequency. However they work poor to reflect the database update. In this paper, we consider a benefit model for triple databases. The model considers not only the profit of query response times but also the building and maintenance costs of the shortcuts. We apply the model to design a benefit function which can be plugged in a greedy-based shortcut selection algorithm. We perform the empirical experiments on a real-world dataset and analyze the effect of each factor employed in the benefit function.

Development of Cost-Benefit Analysis Model for GIS Projects (GIS사업의 비용편익분석 모형개발)

  • Kim, Jung-Ok;Heo, Yong;Yu, Ki-Yun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.12 no.1 s.28
    • /
    • pp.79-85
    • /
    • 2004
  • The GIS(Geographic Information System) projects require big initial investment and cost of maintenance. Decision makers would not launch GIS projects unless they are convinced of the benefits of the projects. Therefore the purpose of this paper is to develop an appropriate model for GIS project evaluation. We proposed a GIS project evaluation model and summarize the steps involved in Cost-Benefit Analysis(CBA). The costs of a GIS implementation include hardware and software cost, costs of database development, training expenses, annual maintenance expenses, and other annual expenses. The benefit by using GIS has been assessed into Type I(direct benefits), Type II(indirect benefits), Type III(benefits that result from the sale of information services), Type IV(intangible benefits).

  • PDF