• Title/Summary/Keyword: Benefit Cost Structure

Search Result 89, Processing Time 0.027 seconds

Optimum Service Life Management Based on Probabilistic Life-Cycle Cost-Benefit Analysis (확률론적 생애주기비용-이익분석 기반 수명관리 최적화 기법)

  • Kim, Sunyong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.4
    • /
    • pp.19-25
    • /
    • 2016
  • Engineering structures including civil infrastructures require a life-cycle cost and benefit during their service lives. The service life of a structure can be extended through appropriate inspection and maintenance actions. In general, this service life extension requires more life-cycle cost and cumulative benefit. For this reason, structure managers need to make a rational decision regarding the service life management considering both the cost and benefit simultaneously. In this paper, the probabilistic decision tool to determine the optimal service life based on cost-benefit analysis is presented. This decision tool requires an estimation of the time-dependent effective cost-benefit under uncertainty to formulate the optimization problem. The effective cost-benefit is expressed by the difference between the cumulative benefit and life-cycle cost of a deteriorating structure over time. The objective of the optimization problem is maximizing the effective cost-benefit, and the associated solutions are the optimal service life and maintenance interventions. The decision tool presented in this paper can be applied to any deteriorating engineering structure.

A Study on Benefit Cost Analysis of Chungju UIS (청주시 도시정보시스템의 비용편익분석 연구)

  • Kim, Kwang Ju
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.6 no.4
    • /
    • pp.1-15
    • /
    • 2003
  • Recently, urban information system(UIS) has been developed and utilized by local governments in Korea and has become a key means of urban informatization of local governments. When UIS is conducted only for FM oriented internal utilization regardless of its cost-efficiency, however, its cost-benefit structure could be distorted seriously. The study utilizes benefit cost analysis technique and applied the technique to a model case of Chungju UIS selected by National GIS team. Chungju City developed its GIS for the management of roads and urban planning in 1993. At its beginning, the system was an efficient model with relatively strong cost-benefit structure and could produce positive net benefit 10 years' after its construction. When the city began to develop its facility management with the financial assistance from central government in 1998, however, its cost-benefit structure became distorted. As a result, it is delayed for the UIS to produce positive net benefit until the year of 2015. Using benefit cost ratio, discount rate and Mobile GIS, the study also conducts a sensitivity analysis.

  • PDF

A Study on the Cost-Benefit Analysis for the Construction Method of Underground Railway Crossing (철도지하횡단공사 공법의 비용.편익 분석에 관한 연구)

  • Seok, Chong-Chen;Shin, Min-Ho;Eum, Ky-Yong;Kim, Mu-Il
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.407-413
    • /
    • 2006
  • Railways are very important to get stability of railway structure as transportation system carrying a lot of passengers and freight. These days the construction of underground railway crossing such as expansion of new roads, construction of subway and gas pipe is increasing because of economic and social development. But these kinds of construction didn't take into account Cost-benefit analysis of railway which has the most important aspects of railway safety, so the results of construction didn't get a good evaluation. This study adapt Cost-benefit analysis to evaluate the economic validity of underground railway crossing. This study adjust about Cost-benefit analysis of railway part, and analyze the new method and technology of underground railway crossing constructed by Korean National Railroad and Railway Network Authority. Also this study divide between high frequency line and low frequency lineusing B/C, NPV, and IRR analysis. After analysis, B/C ratio method is the most suitable method among B/C, NPV, and IRR analysis method. Therefore this study can express economic benefit quantitatively and decrease the cost by adapting Cost-benefit analysis, and can clearly express the construction feasibility and investment effects of construction of underground railway crossing method.

  • PDF

Environmental Decision Making of Nakdong River Basin by the Environmental Accounting (환경회계에 의한 낙동강 유역의 환경정책결정에 관한 연구)

  • 김영진;김진이;손지호;이석모
    • Journal of Environmental Science International
    • /
    • v.10 no.2
    • /
    • pp.85-90
    • /
    • 2001
  • The conflicts between environment protection and economic development are becoming increasingly important in environmental decision making of Nakdong River Basin. A science-based evaluation system is now needed to represent both the environmental values and the economic values with a common measure. EMERGY, spelled with an \"m\" evaluates both the work of river and that of human in generating products and services. The monetary cost-benefit analysis and the environmental accounting by EMERGY analysis were applied to determine whether there will have a net benefit in environmental decision making of Nakdong River Basin. Based on the results of the environmental accounting, all alternatives which related to environmental decision making of Nakdong River Basin show that more and more of EMERGY cost becomes needed than the a EMERGY benefit from getting water to drink in the lower basin. From these results, for selecting alternatives to manage water quantity and quality that is sustainable in the environmental use and economic development, environmental accounting concepts must be considered, and the economic structure of Nakdong River Basin should be changed from the present industrial structure to social-economic based on ecological-recycling concept for the sustainable use of Nakdong River.ong River.

  • PDF

Heating Energy Saving and Cost Benefit Analysis According to Low-Income Energy Efficiency Treatment Program - Case Study for Low-Income Detached Houses Energy Efficiency Treatment Program (저소득층 에너지효율개선사업에 따른 난방에너지 절감 효과 및 경제성 분석 - 저소득층 단독주택 단열개선을 중심으로 -)

  • Kim, Jeong-Gook;Lee, Junghun;Jang, Cheolyong;Song, Doosam;Yoo, Seunghwan;Kim, Jonghun
    • KIEAE Journal
    • /
    • v.16 no.5
    • /
    • pp.39-45
    • /
    • 2016
  • Purpose: The purpose of this study is to analyze the energy saving and cost benefit analysis of the Low-income Energy Efficiency Treatment Program supported by KOREF(Korea Energy Foundation). This program was launched in 2007 and performs building energy retrofit for the low-income and energy poverty houses. Method: Energy simulation and cost benefit analysis were accomplished for the low-income detached houses. The structure of detached house was a lot og block structure, wood frame (single glass) and concrete roof. Baseline model of the low-income detached houses was proposed. Result: Annual heating energy consumptions were decreased by about 3.2% with the window system replacement(Case 1), 9.3% with reinforcement of insulation(Case2), and 12.5% with both(Case 3) compared to those of baseline model. The construction cost will be recouped within 5 years for the Case 1, 3 years for the Case 2, and 3 years for the Case 3. Case 3 was the most cost beneficient construction method in the analyzed cases in this study.

Economic Analysis of Zero Energy Building in South Korea - focusing on Cost-Benefit analysis considering Social Cost - (공사비 변화에 따른 제로에너지건축물 경제성 분석 - 사회적비용을 고려한 비용편익 분석을 중심으로 -)

  • Kim, Jae-Moon
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.147-157
    • /
    • 2020
  • With the increasing obligation to reduce greenhouse gas emissions to the building sector, the government has been gradually expanding its obligation to zero-energy buildings since 2020. Since the ZEB certification took effect in 2017, 48 preliminary and main certifications have been completed as of March 2019, and most of them are public buildings or even certified, but have earned Grade 5 of ZEB. This means that compared with the number of annual building permits registered in Korea, the figure is insignificant, and that it receives little if not mandatory. Therefore, this study investigated empirical cases of ZEB additional construction cost and conducted cost benefit analysis according to changes in ZEB additional construction cost based on a preliminary feasibility analysis project recently conducted by the KDI. In addition, considering the public buildings, the social costs were considered, and the cost-benefit analysis method was the same as the KDI's preliminary feasibility analysis method. The analysis shows that if the ratio of ZEB additional construction cost is more than 5 percent, it is analyzed that there is no economic feasibility, and considering that the ratio of additional construction cost in the cases of ZEB in Korea is 17 percent to 38 percent, it will not be easy to obtain ZEB certification in terms of cost. Finally, to narrow these differences in cost and economic aspects, the overseas low energy and ZEB incentive examples proposed measures such as the concept of subsidy payment in Illinois and the compensation of social costs to private ZEB.

Cost.Benefit Risk Based Purchase Pricing Process Model for Feed in Tariffs of Photovoltaic Power Projects (비용.수익 리스크 기반 태양광사업 발전차액지원 기준가격 산정 프로세스 모델)

  • Kim, Se-Jong;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.113-121
    • /
    • 2010
  • Since the cut-down of the purchasing price of the feed in tariff(FIT) in 2008, the numbers of photovoltaic projects get decreased, contrary to investment expansion policy of government on renewable energy. The root cause of the decrease is the irrationality of the current purchasing price structure of FIT as well as the adversity of fund raising due to the global financial crisis. This study proposes the FIT calculating model (Cost & Benefit Risk Based Purchase Price Process : CBRP3) reflecting the fluctuation of cost and benefit risks. The first step is to establish the photovoltaic generation alternatives, and to calculate each distribution data of the investment and the power generation quantity. The FIT for each alternative is, then, assessed through simulations. Finally the proposed FIT scheme is compared to the present FIT scheme and future study subjects are derived.

Measuring the social benefit of an egg processing center in Korea

  • Kim, Sounghun;Jeon, Sang Gon
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.2
    • /
    • pp.283-290
    • /
    • 2020
  • In 2018, 647 thousand tons of eggs were produced and consumed. However, the issue of pesticides used for egg in 2017 made Korean consumers worry about the food safety of eggs, and the volume of egg consumption decreased. The Korean egg industry also has another problem due to an unclear and inefficient marketing structure at the farm level. This marketing situation of eggs at the farm level in Korea needs a large-scale restructuring of the market structure, including introducing an EPC (egg processing center). Especially, the introduction of an EPC has been discussed by government officers and specialists, but the social benefit of an EPC, which will be the driving point for approving an EPC, has not been measured yet. The purpose of this study was to measure the effect of introducing an EPC in Korea. Through an analysis using EDM (equilibrium displacement model), a few findings are presented. First, the introduction of an EPC may increase the transparency of price discovery and decrease the transaction cost. And thus, it results in a higher producer price, lower consumer price, and larger quantity at market equilibrium. Second, an EPC will improve the level of food safety of eggs, which can increase the satisfaction of domestic producers and consumers. Third, the introduction of an EPC may create new consumption of eggs. Based on these three effects, the new social benefits in monetary terms from the introduction of an EPC in Korea could be 23.9 - 35.2 billion won.

A Cost-Benefit Analysis for the Establishment of the Truck Transportation Information Networking System in Busan Region : Using the Scenario Analysis (부산지역 화물자동차 운송정보망 구축과 경제적 타당성 분석 -시나리오분석을 중심으로-)

  • Kim, Chul-Min
    • Journal of Korea Port Economic Association
    • /
    • v.26 no.4
    • /
    • pp.101-121
    • /
    • 2010
  • Domestic trucking transportation market does not have only the poor business environment but also the serious defects on the transportation trading structure. It makes weaken the competitiveness of trucking industry and hinders the development of trucking industry. The problems of trucking industry such as the recession of the Korean economy and decrease of the trucking charge cause the truck drivers suffer. Korean government and national assembly try to change the law of truck transportation business. The suggested law includes the obligation of trucking information networking system and it can make the transportation business structures more efficiently. This article deals with the strategies for the establishment of trucking transportation networking system and examines the cost-benefit analysis assuming the four demand senario. The results suggest the establishment of the information system not based on the individual trucking industry but on the joint industry at the level of the local area. This article also suggests that the information system has a positive financial feasibility.

Reliability Analysis of Prestress Concrete Box Girder Bridges Considering Inspection Cost (검측비용을 고려한 PC박스 거더의 신뢰성 분석)

  • Nguyen, Van Son;Jeong, Min-Chul;Kong, Jung-Sik
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.476-479
    • /
    • 2010
  • In recent years, the deterioration of infrastructures is especially considered. In prestress concrete bridges, one of the important mechanisms of deterioration is the corrosion of the post-tensioned tendon due to environmental agents. In this study, the reliability analysis is performed for a prestress concrete box girder bridge under the pitting corrosion attack with considering the inspection and failure cost. The variation of life-time performance depending on inspection methods have to be quantified. The inspection methods with different accuracy of corrosion detection are presented and applied for model of reliability analysis. The computer program for analysis reliability index of the structure as well as updating process is obtained. An existing bridge is applied for illustrating the influence of inspection cost on the behaviors of structure. Subsequently, the benefit of inspection has shown to predict the time to failure of structure.

  • PDF