• 제목/요약/키워드: Basic warranty

검색결과 21건 처리시간 0.025초

무료 이단계 보증에 대한 최적의 보증 정책 (Optimal Warranty Policy for Free Two-phase Warranty)

  • 정기문
    • 통합자연과학논문집
    • /
    • 제17권2호
    • /
    • pp.43-51
    • /
    • 2024
  • Jung et al.(2015) suggest the two-phase warranty model, which is a general type of warranty model. Under the two-phase warranty, the warranty period is divided into two intervals, one of which is for renewing replacement warranty, and the other is for minimal repair warranty. And warranty policies play a very important role in product marketing. In this paper, we suggest the optimal warranty policy for free extended two-phase warranty. To determine the optimal warranty period, we adopt the expected profit per unit product. So, the expressions for the total expected cost, the sale price and the expected profit per unit product from the manufacturer's point of view are derived. Also, we discuss the optimal warranty period and the numerical examples are provided to illustrate the proposed the warranty policy.

비재생보증 하에서의 이단계 보전정책 (Two stage maintenance policy under non-renewing warranty)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제27권6호
    • /
    • pp.1557-1564
    • /
    • 2016
  • 최근에 기본보증이 종료된 이후에 주어지는 시스템의 추가보증에 대한 사용자의 관심이 증가되고 있다. 따라서 본 논문에서는 사용자 측면에서 비재생보증 하에서의 이단계 보전정책을 제안하였다. 이단계 보전정책의 첫 번째 단계에서는 추가보증을 구입할 것인지의 여부를 결정하고, 두 번째 단계에서는 보증이 종료된 이후의 최적의 교체 주기를 결정한다. 이때, 추가보증 동안에 발생된 시스템의 고장에 대해서는 판매자에 의해서 무료로 최소수리가 이루어진다. 최적의 이단계 보전정책을 결정하기 위해서 사용자 측면에서 기대비용을 사용하였으며, 끝으로 시스템의 고장시간이 와이블 분포를 따를 때 수치적 예를 통하여 제안된 이단계 보전정책을 설명하였다.

연장된 보증을 갖는 예방보전모형 (Preventive maintenance model with extended warranty)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제24권4호
    • /
    • pp.773-781
    • /
    • 2013
  • 최근에 기본 보증이 종료된 이후에 주어지는 시스템의 연장된 보증에 대한 관심이 증가되고 있다. 따라서 본 논문에서는 사용자 측면에서 최소수리보증이 있는 연장된 보증이 종료된 이후의 예방보전모형을 제안하였다. 이 때, 기본 보증과 연장된 보증 하에서 고장이 발생된 시스템에는 판매자에 의해서 무료로 최소수리가 이루어진다. 이러한 제안된 예방보전모형에 대하여 기대순환길이, 총기대비용 그리고 단위시간당 기대비용을 유도하였다. 또한, 유도된 단위시간당 기대비용을 최소화 하는 최적의 예방보전 주기와 예방보전 횟수를 결정하였다. 끝으로 시스템의 고장시간이 와이블 분포를 따를 때 수치적 예를 통하여 이를 설명하였다.

최소수리 보증을 갖는 시스템에 대한 연장된 보증 이후의 최적의 교체정책 (Optimal replacement policy after extended warranty for a system with minimal repair warranty)

  • 정기문
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제13권2호
    • /
    • pp.77-86
    • /
    • 2013
  • Recently, an extended warranty of a system following the expiration of the basic warranty is becoming increasingly popular to the user. In this respect, we suggest a replacement model following the expiration of extended warranty with minimal repair warranty from the user's point of view in this paper. Under extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user during the original extended warranty period. As a criterion of the optimality, we utilize the expected cost rate per unit time during the life cycle from the user's perspective and suggest the optimal replacement period after extended warranty. Finally, a few numerical examples are given for illustrative purpose.

연장된 이단계 보증 이후의 교체모형 (Replacement Model after Extended Two-phase Warranty)

  • 정기문
    • 통합자연과학논문집
    • /
    • 제14권4호
    • /
    • pp.197-204
    • /
    • 2021
  • Under the two-phase warranty, the warranty period is divided into two intervals, one of which is for renewing replacement warranty, and the other is for minimal repair warranty. Jung[13] discusses the two types of extended two-phase warranty models. In this paper, we suggest the replacement model after the extended two-phase warranty that has been proposed by Jung[13]. To determine the optimal replacement policy, we adopt the expected cost rate per unit time. So, the expressions for the total expected cost, the expected length of the cycle and the expected cost rate per unit time from the user's point of view are derived. Also, we discuss the optimal replacement policy and the uniqueness of the solution for the optimization. Furthermore, the numerical examples are provided to illustrate the proposed the replacement model.

도로포장 성능보증(Warranty) 계약제도 도입방안에 관한 기초연구 (A Basic Study on the Methodology to Introduce Warranty Contracting for Pavements in Korea)

  • 김태송;서용칠;이상범;구재동
    • 한국건설관리학회논문집
    • /
    • 제9권4호
    • /
    • pp.66-74
    • /
    • 2008
  • 도로포장분야의 성능보증(warranty)계약제도는 유럽, 미국, 일본에서 오랫동안 시행되어 왔거나 시행되기 시작한 제도로서 그 효과가 입증되었거나 입증되고 있다. 본 연구에서는 유럽, 미국, 일본의 성능보증계약제도의 도입 및 운영 현황을 조사하였고, 성능보증계약제도의 장단점과 국내 적용가능성 분석을 통해 성능보증계약제도의 국내 도입방안을 제시하였다. 본 연구의 주요 결론으로 성능보증계약제도를 국내에 적용하기 위한 성능기준 개발의 필요성과, 보증보험 수수료 및 보증기간 등을 고려한 적정공사비 산정방안 마련, 국내에 적합한 성능보증방식 개발 등의 필요성을 제시하였고, 국내에 성능보증계약 제도의 도입을 위한 장단기적 적용방안을 제시하였다.

Legal Direction of Defect Warranty Liability in the Korean Construction Industry

  • Cho, Young-Jun
    • 한국건축시공학회지
    • /
    • 제18권2호
    • /
    • pp.195-202
    • /
    • 2018
  • The defects that are bound to arise in most construction projects cause disputes among the contracting parties regarding the defect warranty liability (DWL)guaranteed by the retention of the contractor's performance security at the end of the performance period of the contract. Most current projects involve a multiple-tier contractual relationship, causing the liability for some defects to overlap. In addition, many construction projects are made up of multiple detailed work types which an expert hired by the owner inspects the part completed by the contractor and pays an interim payment. However, after the completion of work, the contractor will still hold the defect warranty liability. In a scenario in which the work is delayed due to reasons for which the owner is responsible, the defect warranty liability period is also increased, imposing an additional burden on the contractor. In this study, basic research was carried out with the goal of reducing problems related to defect warranty liability Problems related to defect warranty liability cases and the nature of the defect warranty liability period were investigated. Possible solutions to the problems caused by the DWL that were suggested include the separation of the negligence liability period and the strict liability period, as well as the introduction of a retention money system.

유료 재생교체-비재생수리보증이 종료된 이후의 최적의 교체정책 (Optimal replacement policy following the expiration of payable RRNMW)

  • 정기문
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제11권4호
    • /
    • pp.409-417
    • /
    • 2011
  • In this paper, we consider a replacement model following the expiration of warranty. In other words, this paper proposes the optimal replacement policy for a repairable system following the expiration of payable renewing replacement-non-renewing minimal repair warranty. The expected cost rate per unit time from the user's perspective is used to determine the optimality of the replacement policy. Thus, we derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purpose.

공동주택 하자실적자료 분석을 통한 철근콘크리트 공사의 하자담보책임기간 비교연구 (Comparative Review on Term of Warranty Liability of Reinforced Concrete Work through Occurred Defect Data Analysis in Apartment Building)

  • 서덕석;박준모
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.266-267
    • /
    • 2017
  • As apartment buildings defect lawsuits become socioeconomic problems, an objective basis system for the term of warranty liability of reinforced concrete constructions is urgent. This study was carried out as a basic study for developing a basis system for the term of warranty liability. To do this, defect data actual collected in apartment complexes were collected and analyzed. As the result of checking the cumulative rate of defect occurrence in reinforced concrete construction by year, the point of time of reaching the 90% level was the 5th years, which was similar with the provision of the Apartment Building Management Act. However, the current Supreme Court precedent has decided that the term of warranty liability for the main structural parts in reinforced concrete construction shall be 10 years and the dispute is expected to continue in the future in the defect lawsuit.

  • PDF

실적자료에 의한 공동주택 마감공사의 하자보수기간의 적절성 평가 기초연구 (Basic Research on Evaluation of Defect Repair Period of Finishing Works in Apartment Houses according to Performance Data)

  • 김대길;이웅균;서덕석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.245-246
    • /
    • 2015
  • Cases of lawsuit and conflict are increasing because of defects in apartments in use after the completion of construction. Further, with changes in the consciousness of residents and in the social environment, many residents are showing interest in defect-related lawsuits. However, the term of warranty liability defined in the current law is not practically appropriate, and the verification of the determination of the term of warranty liability is insufficient. Against this background, this research aims to evaluate the appropriateness of defect repair periods by examining the actual defect condition of the finishing work among the various defects related to apartments. Collected performance data are analyzed by statistical techniques by considering the defect occurrence rate per construction type and the construction year of the finishing work in apartment construction. The analysis results will be used as basic data for evaluating the appropriateness of the standards for the term finishing works warranty liability.

  • PDF